AHERA Project Designer flashcards
AHERA Project Designer · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- AHERA
- Asbestos Hazard Emergency Response Act; federal law (40 CFR 763) requiring schools to inspect for asbestos, develop management plans, and use accredited professionals for response actions.
- NESHAP
- National Emission Standards for Hazardous Air Pollutants (40 CFR 61 Subpart M); regulates asbestos work practices, demolition/renovation notification, and waste handling for all facilities.
- OSHA PEL
- Permissible Exposure Limit of 0.1 fibers per cubic centimeter as an 8-hour time-weighted average for asbestos under 29 CFR 1926.1101 and 1910.1001.
- Excursion Limit
- OSHA excursion limit of 1.0 fiber per cubic centimeter averaged over 30 minutes; short-term ceiling that must not be exceeded.
- Class I work
- OSHA asbestos work class covering removal of surfacing material (thermal system insulation, sprayed-on) and ACM flooring installed with troweled-on surfacing.
- Class II work
- OSHA asbestos work class for removal of ACM other than surfacing material, such as flooring, roofing, siding, and cement products.
- Class III work
- OSHA asbestos work class for repair and maintenance operations where ACM is likely to be disturbed, including small-scale removal.
- Class IV work
- OSHA asbestos work class for maintenance and custodial activities that clean up ACM waste and debris; requires at least two hours of awareness training.
- Accreditation
- EPA-required training and certification for asbestos professionals (inspector, management planner, project designer, contractor/supervisor, worker), renewed by annual refresher.
- ACM definition
- Asbestos-containing material is any material containing more than one percent asbestos by weight, as determined by calibrated polarized light microscopy or another validated method.
- Homogeneous area
- A group of materials with similar composition, color, texture, and application date that can be represented by a single set of bulk samples.
- Friability
- The tendency of a material to crumble or be reduced to powder under hand pressure; friable materials present higher fiber-release potential.
- Category I nonfriable
- Nonfriable ACM such as resilient flooring and asphalt roofing that can become regulated if crumbled, pulverized, or reduced to powder during work.
- PLM
- Polarized light microscopy; the standard method for identifying asbestos in bulk samples by examining optical properties of fibers.
- Presumed ACM
- Material not sampled or not confirmed by analysis is presumed to contain asbestos until proven otherwise, requiring documentation of sampling limits.
- Encapsulation
- Applying a sealant coating to ACM to bind fibers and prevent release; does not remove the hazard and requires periodic reinspection for coating failure.
- Enclosure
- Constructing an airtight barrier around ACM to isolate it from occupied space; does not eliminate the hazard and requires future disturbance controls.
- Glovebag
- A sealed bag with built-in gloves used for small-scale removal of pipe insulation; must be HEPA-vacuumed and sealed before disposal.
- Negative pressure
- Maintaining containment at lower pressure than surrounding areas using HEPA-filtered exhaust, typically at least four air changes per hour, to prevent fiber escape.
- Decontamination unit
- Three-stage facility with equipment room, shower, and clean room arranged so workers move from dirty to clean areas without backtracking.
- Amended water
- Water mixed with a surfactant wetting agent used to suppress fiber release during removal and cleanup operations.
- Project design
- Written plan prepared by an accredited project designer specifying scope, methods, schedules, worker protection, air monitoring, and waste handling for a response action.
- Clearance criteria
- Predetermined air and visual standards that must be met before reoccupancy, such as 0.01 f/cc by PCM or 70 structures per square centimeter by TEM.
- Performance specification
- A specification stating required outcomes (e.g., clearance levels) rather than prescribing every means and method the contractor must use.
- Pre-construction conference
- Meeting before work begins to review scope, schedule, safety, communication, and responsibilities; attendance and minutes are documented.
- Respirator fit test
- Annual test verifying a tight seal between respirator and face; required before use and whenever facial conditions change.
- Medical surveillance
- Required health monitoring for asbestos workers above the PEL for 30 or more days per year or in Class I-III work; includes physical exam and chest X-ray.
- Aggressive sampling
- Air sampling performed after mechanically disturbing air (e.g., fan or blower) to simulate worst-case conditions, often required for final clearance.
- PCM
- Phase contrast microscopy; the standard method for counting airborne fibers during abatement and clearance monitoring, with a typical clearance limit of 0.01 f/cc.
- Waste manifest
- Shipping document tracking ACM waste from generation to disposal at an approved landfill; retained as part of the project record.
- Daily log
- Project record documenting progress, weather, air monitoring results, and deviations; part of the contract administration record.
- Record retention
- AHERA and OSHA require retention of management plans, exposure records (30 years), medical records (30 years), and training records (1 year beyond employment).