AK Asbestos Abatement · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Abatement Work Practices and Removal Procedures & Containment, Work Area Preparation, and Engineering Controls

  • Outline the full sequence of an abatement project from pre-work inspection through final clearance, listing the order of major work steps

  • Describe the difference between removal, enclosure, and encapsulation and state when each method is appropriate

  • Explain how negative pressure is established and maintained during removal work, including the role of HEPA air machines and manometer readings

  • List the critical barriers and decontamination enclosure components that must be in place before removal begins

  • Identify the standard work practices for removing non-friable versus friable material without generating excess dust

Your checkpoint

A one-page written work-sequence checklist covering containment setup through removal, with the purpose of each step noted

Week 2

Abatement Work Practices and Removal Procedures & Containment, Work Area Preparation, and Engineering Controls

  • Describe proper removal techniques for the most common material types (pipe insulation, floor tile and mastic, ceiling tile, drywall joint compound, roofing)

  • Explain how to keep material wet and how to wrap or bag it as it is removed

  • State the rules for shutting down and protecting HVAC systems and sealing openings in the work area

  • Describe how to handle electrical, lighting, and emergency-exit requirements inside a regulated work area

  • Explain the purpose and placement of a decontamination unit with clean, shower, and equipment rooms

Your checkpoint

A written walk-through of a mock removal job for two material types, including containment, wetting, bagging, and decon steps

Week 3

Worker Protection and Personal Protective Equipment & Respiratory Protection and Medical Surveillance

  • Select the correct respiratory protection class for a given airborne fiber exposure level and state the assigned protection factor

  • Explain fit-testing requirements, user seal checks, and when a new fit test is required

  • Describe the components and correct donning and doffing sequence of a full-body protective suit and respirator

  • List the elements of a written respiratory protection program required for abatement workers

  • Explain medical surveillance triggers, the contents of the medical exam, and record retention for medical records

Your checkpoint

A PPE and respirator selection table mapping exposure scenarios to respirator type, protective clothing, and fit-test requirements

Week 4

Asbestos-Containing Materials Identification and Assessment & Asbestos Health Effects and Regulatory Background

  • Classify asbestos-containing materials as friable or non-friable and as surfacing, thermal system insulation, or miscellaneous

  • Describe how bulk samples are collected, handled, and analyzed (PLM and PCM) and what constitutes a valid sample set

  • Explain the health effects of asbestos exposure, including latency, dose-response, and the difference between asbestosis, lung cancer, and mesothelioma

  • Identify the regulatory definitions and thresholds that determine when work is regulated and which standards apply

  • Describe the roles of the owner, contractor, supervisor, and worker under the applicable regulations

Your checkpoint

A material-classification and sampling worksheet completed for five sample scenarios, plus a short written summary of health effects and regulatory triggers

Week 5

Waste Handling, Decontamination, and Disposal & Air Monitoring, Clearance, and Recordkeeping

  • Describe the decontamination sequence for workers and for tools and equipment leaving the work area

  • State the labeling, container, and handling requirements for asbestos waste, including wetting and double-bagging

  • Explain the difference between personal, area, and clearance air sampling and when each is performed

  • Describe clearance criteria and the visual inspection that must precede final air clearance

  • List the records that must be created and retained, including training, medical, air monitoring, and waste shipment records

Your checkpoint

A decontamination and waste-handling procedure plus a records-retention checklist covering all required documents

Week 6

Worker Protection and Personal Protective Equipment & Respiratory Protection and Medical Surveillance & Waste Handling, Decontamination, and Disposal

  • Walk through a complete donning and doffing sequence including respirator, suit, boots, and gloves, with the reason for each step

  • Explain respirator cleaning, storage, inspection, and cartridge-change practices

  • Describe how to respond to a respirator failure, a torn suit, or a containment breach

  • Explain how to handle heat stress and hydration for workers in full PPE

  • Describe how to decontaminate and dispose of used PPE and respirator components

Your checkpoint

A written step-by-step decontamination and emergency-response procedure for three failure scenarios

Week 7

Asbestos Health Effects and Regulatory Background & Asbestos-Containing Materials Identification and Assessment & Air Monitoring, Clearance, and Recordkeeping

  • Summarize the key regulatory requirements and definitions from each domain into a single reference sheet

  • Explain how to interpret air monitoring results against regulatory limits and what action to take when limits are exceeded

  • Describe the supervisor's responsibilities for daily oversight, inspections, and documentation

  • Identify common compliance failures and how to prevent them

  • Answer practice questions across all eight domains and log every missed item with the underlying fact

Your checkpoint

A consolidated one-page regulatory reference sheet plus a logged list of missed practice questions with corrections

Week 8

Containment, Work Area Preparation, and Engineering Controls & Abatement Work Practices and Removal Procedures & Worker Protection and Personal Protective Equipment & Respiratory Protection and Medical Surveillance & Waste Handling, Decontamination, and Disposal & Air Monitoring, Clearance, and Recordkeeping

  • Complete a full-length timed practice exam and score it by domain

  • Re-study the two lowest-scoring domains using the logged corrections from week 7

  • Rehearse the removal work sequence and decontamination sequence from memory

  • Verify recall of respirator classes, clearance criteria, and record-retention periods without notes

  • Write a final summary of any remaining weak areas and the specific facts to review before test day

Your checkpoint

A scored full-length practice exam with a per-domain score breakdown and a final pre-test review list

Milestones

Week 2: Can explain the containment-to-removal work sequence and the role of negative pressure without notes

Week 4: Can classify materials, describe sampling and analysis, and explain the major asbestos health effects and regulatory triggers

Week 6: Can perform the donning and doffing and decontamination sequences from memory and describe responses to three failure scenarios

Week 8: Scores at or above 80 percent on a full-length timed practice exam with no domain below 70 percent