AL Electrician study materials
AL Electrician study resources

AL Electrician study plan

AL Electrician · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

General Code Requirements, Definitions, and Wiring Design

  • Define the Article 100 terms that appear most often on the exam (branch circuit, feeder, service, GFCI, AFCI, continuous load, ampacity) in your own words

  • Apply working-clearance, dedicated-equipment-space, and disconnect-marking rules to written scenario items

  • Distinguish general wiring-design requirements for dwelling units from those for non-dwelling occupancies

  • Locate and cite the code section that governs each of 25 sample violation descriptions

Your checkpoint

One-page glossary of 25 Article 100 terms plus a scored 50-question Domain 1 quiz (record the score and every missed item with its code reference)

Week 2

General Code Requirements, Definitions, and Wiring Design & Wiring Methods, Materials, and Installation Practices

  • Compare permitted and prohibited uses for the major wiring methods (NM-B, MC, AC, EMT, IMC, PVC, LFMC) in a written table

  • Determine securing and supporting intervals and requirements for each raceway and cable type

  • Select the correct wiring method for 20 installation scenarios involving wet, damp, corrosive, and hazardous locations

  • Identify bending, fill, and physical-protection requirements that apply to raceways in exposed and concealed work

Your checkpoint

Wiring-method comparison matrix (7 methods x permitted uses / prohibited uses / support rules) plus 30 scenario selections scored at 80% or better

Week 3

Wiring Methods, Materials, and Installation Practices & Grounding, Bonding, and Overcurrent Protection

  • Size and select overcurrent protective devices for branch circuits, feeders, and equipment using standard ratings and the next-size-up rule

  • Determine equipment grounding conductor sizes from the applicable table and explain when upsizing is required

  • Diagram the grounding and bonding path from service point through panelboard, raceway, and equipment

  • Apply tap-conductor, series-rating, and location rules for overcurrent devices to written problems

Your checkpoint

Hand-drawn grounding and bonding diagram for a 200 A residential service plus a scored 40-question Domain 3 quiz

Week 4

Grounding, Bonding, and Overcurrent Protection & Services, Feeders, and Branch Circuit Calculations

  • Perform a complete standard-method dwelling load calculation including general lighting, small-appliance, laundry, range, dryer, and HVAC demand factors

  • Size service-entrance conductors, the main disconnect, and the service neutral from the calculated load

  • Size feeder conductors and overcurrent protection for a multi-unit or commercial feeder problem

  • Verify grounding electrode conductor and bonding jumper sizes against the service conductors selected

Your checkpoint

Completed service-calculation worksheet for a 2,400 sq ft dwelling showing every step and final conductor and breaker sizes, checked against the answer key

Week 5

Services, Feeders, and Branch Circuit Calculations & Motors, Transformers, and Special Equipment and Occupancies

  • Calculate branch-circuit conductor ampacity and short-circuit/ground-fault protection for single and multiple motor installations

  • Size motor overload protection and determine the correct disconnect rating for a given motor nameplate

  • Apply transformer primary and secondary overcurrent protection rules to dry-type transformer problems

  • Identify additional requirements for special equipment and occupancies such as HVAC equipment, pools, and commercial cooking areas

Your checkpoint

Motor and transformer problem set (5 motors, 3 transformers) solved with every table reference shown, scored at 80% or better

Week 6

Motors, Transformers, and Special Equipment and Occupancies & Electrical Theory, Load Calculations, and Conduit/Box Fill

  • Compute conduit fill for mixed conductor sizes and apply the 40/60 percent raceway fill limits

  • Compute box fill using the cubic-inch method for boxes with devices, clamps, and equipment grounding conductors

  • Apply ambient-temperature correction and conductor-bundling adjustment factors to derate ampacity

  • Solve voltage-drop and basic AC theory problems (Ohm's law, power, series/parallel, power factor) showing each step

Your checkpoint

Twenty fill, derating, and voltage-drop problems solved with work shown, with at least 18 of 20 correct

Week 7

Business Practices, Estimating, and Alabama Contractor Regulation & Electrical Safety, Tools, and Testing

  • Outline the Alabama contractor licensing, qualifying-agent, and permit/inspection requirements that apply to an electrical contractor

  • Build a material takeoff and labor estimate for a small residential rough-in and add overhead and markup

  • Demonstrate correct use of a multimeter, clamp meter, and insulation tester for common diagnostic tasks

  • Sequence lockout/tagout, PPE selection, and safe approach distances for typical service work

Your checkpoint

One-page bid estimate with itemized material, labor hours, overhead, and profit, plus a scored 25-question safety, tools, and business-practices quiz

Week 8

General Code Requirements, Definitions, and Wiring Design & Wiring Methods, Materials, and Installation Practices & Grounding, Bonding, and Overcurrent Protection & Services, Feeders, and Branch Circuit Calculations & Motors, Transformers, and Special Equipment and Occupancies & Electrical Theory, Load Calculations, and Conduit/Box Fill & Electrical Safety, Tools, and Testing & Business Practices, Estimating, and Alabama Contractor Regulation

  • Re-drill every missed question from weeks 1-7 and write the governing rule for each

  • Take a full-length timed practice exam under exam-day conditions

  • Rank your domains by practice-exam accuracy and re-study the two weakest

  • Build a one-page formula and table-reference sheet you can review in the final 48 hours

Your checkpoint

Full-length 80-question timed practice exam completed with a score of 80% or higher and a written list of the top five weak areas with a re-study action for each

Milestones

Week 2: Score 80% or better on a 20-question mixed Domain 1 and 2 quiz without using the index

Week 4: Finish the dwelling service calculation with correct service conductor size, main breaker, and neutral, and score 80% or better on a 40-question mixed Domain 1-4 quiz

Week 6: Complete the fill, derating, and voltage-drop set with at least 18 of 20 correct and no table look-up errors

Week 7: Complete the sample bid estimate end to end and explain each line item out loud without notes

Week 8: Score 80% or higher on the full-length timed practice exam, with no domain below 70%