- Bubble diagram
- A schematic planning tool of free-form circles representing functional spaces and arrows showing circulation and relationships, used before dimensional design begins.
- Schematic design phase
- The early design stage where concept options and general spatial arrangements are developed and presented to the client for approval before detailed design.
- Site inventory
- The systematic recording of existing site conditions such as topography, soils, drainage, vegetation, climate, views, and utilities before design begins.
- Rule of thirds
- A proportion guideline dividing a composition into a three-by-three grid so that key elements and focal points sit on intersections rather than the center.
- Hardiness zone
- A geographic rating based on average annual minimum temperature used to predict whether a plant will survive winter at a given location.
- Right plant, right place
- The horticultural principle of matching a plant's mature size, light, soil, and moisture needs to the actual conditions of the planting site.
- Soil pH
- A measure of soil acidity or alkalinity on a 0-14 scale that governs the availability of nutrients such as iron, phosphorus, and manganese to plants.
- Balled-and-burlapped stock
- Nursery trees and shrubs dug with a soil ball wrapped in burlap; they lose much of their root system and require careful establishment watering.
- Xeriscape
- A water-conserving landscape approach using drought-tolerant plants, soil improvement, mulching, efficient irrigation, and limited turf area.
- Compaction test
- A Proctor test measuring the maximum dry density of a soil or aggregate; field compaction is specified as a percentage of that value.
- Expansion joint
- A deliberate gap in concrete paving that allows slabs to move with temperature change, preventing random cracking; typically spaced 1.5 to 3 meters.
- Base course
- The compacted granular layer beneath paving that spreads loads to the subgrade; typically 100-150 mm for pedestrian and 200-300 mm for vehicular use.
- Quantity takeoff
- The process of measuring lengths, areas, and volumes from construction drawings to calculate material quantities for estimating and purchasing.
- Percent slope
- The steepness of a surface calculated as rise divided by run times 100; a 1:20 slope equals 5 percent.
- Contour line
- A line on a plan connecting points of equal elevation; the spacing between contours indicates the steepness of the terrain.
- Drainage swale
- A shallow, vegetated channel that conveys and infiltrates surface runoff, used instead of or alongside buried pipe drainage.
- Cut and fill
- Earthwork in which soil is removed from high areas (cut) and placed in low areas (fill); balancing the two minimizes hauling cost.
- Head-to-head spacing
- An irrigation layout rule spacing sprinkler heads at a distance equal to their throw diameter so each head wets the adjacent head.
- Drip irrigation
- A low-pressure system delivering water slowly through emitters of 1-4 liters per hour directly to the root zone, minimizing evaporation and runoff.
- Distribution uniformity
- A measure of how evenly an irrigation system applies water; low uniformity causes overwatering in some areas and drought stress in others.
- Backflow preventer
- A device installed on an irrigation connection to potable water that stops contaminated water from reversing into the drinking supply.
- Evapotranspiration
- The combined loss of water from soil evaporation and plant transpiration; reference ETo times a crop coefficient estimates plant water demand.
- One-third mowing rule
- The guideline that no more than one-third of the grass blade height should be removed in a single mowing to avoid stressing the turf.
- Integrated pest management
- A tiered pest strategy starting with prevention and cultural controls, then biological controls, and using targeted chemicals only as a last resort.
- Mulch depth
- The recommended layer of 50-75 mm of organic material over soil to suppress weeds, hold moisture, and moderate temperature, kept clear of trunks.
- Pruning timing rule
- Spring-flowering shrubs are pruned right after bloom because they flower on old wood; summer-flowering shrubs are pruned in late winter.
- Low-impact development
- A stormwater approach that manages rainfall close to its source through infiltration, storage, and evapotranspiration rather than rapid conveyance off site.
- Rain garden
- A shallow planted depression that captures and infiltrates runoff from roofs and paving, filtering pollutants and reducing peak stormwater flows.
- Embodied carbon
- The total greenhouse gas emissions associated with extracting, manufacturing, transporting, and installing a material over its life cycle.
- Green infrastructure
- A network of natural and designed systems such as trees, green roofs, and bioswales that provides ecosystem services including cooling, filtration, and habitat.
- Markup versus margin
- Markup is profit as a percentage of cost; margin is profit as a percentage of selling price, so the two figures differ for the same job.
- Labor burden
- The additional cost above base wages for taxes, insurance, and benefits, typically expressed as a multiplier of 1.3 to 1.6 on hourly wage.
- Critical path
- The longest chain of dependent tasks in a project schedule; any delay to a task on this path delays the entire project completion.