ALOA AFL study materials
ALOA AFL study resources

ALOA AFL study plan

ALOA AFL · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fire door assemblies and hardware (doors, frames, closers, latching and exiting hardware) & Codes, standards and life-safety requirements applicable to fire doors

  • Identify every component of a swinging fire door assembly (door leaf, frame, hinge, closer, latching, exit device, coordinator, gasket, astragal, threshold, viewer) and state the life-safety function each performs.

  • Explain the difference between a door rating, a frame rating and an assembly rating, and why the inspection always evaluates the opening as a system.

  • Describe how fire ratings are established through fire-endurance and hose-stream testing, and what a listing covers versus what a field modification breaks.

  • Classify the common rating designations by both time (20/45/60/90 min) and letter designation, and match each to typical wall assemblies and occupancies.

  • Summarize the scope and division of labor among the model codes and the door-specific installation and maintenance standard.

Your checkpoint

A labeled single-page diagram of a fire door assembly annotated with at least 20 components, plus a 15-term glossary written in your own words.

Week 2

Codes, standards and life-safety requirements applicable to fire doors

  • Map each governing document to the question it answers (construction type, opening protection, egress, maintenance and inspection) and state where they overlap.

  • Determine the required opening protective rating for a given wall rating, occupancy and opening type, and justify the answer by citing the applicable table or section.

  • Apply egress requirements that interact with fire doors: swing direction, occupant load thresholds for panic hardware, clear width and door-release rules.

  • Trace the origin of the periodic inspection obligation, including who is responsible, how often it must occur and what must happen when a deficiency is found.

  • Resolve five fact patterns in which two requirements appear to conflict, and state which controls and why.

Your checkpoint

An eight-row crosswalk table listing code citation, plain-language requirement, and where the requirement applies on a real project.

Week 3

Fire door assemblies and hardware (doors, frames, closers, latching and exiting hardware)

  • Differentiate closer types and adjustment parameters (sweep, latch speed, backcheck, delayed action) and predict the failure signature of a misadjusted closer.

  • State the opening-force and closing-force limits that govern accessible egress doors and explain how field measurement is performed.

  • Match hardware sets to door function: choose between latch, exit device and fire-exit hardware based on occupant load, occupancy and egress direction.

  • Evaluate at least ten common field modifications (added viewer, drilled frame, swapped closer, removed gasket, added kick plate) and classify each as acceptable or listing-voiding.

  • Explain the role of coordinators, astragals and gaskets in smoke and fire control, and how to verify they function as a set.

Your checkpoint

A hardware compatibility matrix covering ten door types, each with an acceptable configuration and a commonly seen non-compliant one.

Week 4

Inspection procedures, field testing and documentation

  • Sequence a complete inspection from pre-visit document review through opening identification, component-by-component check, and closing interview.

  • Execute a component-by-component inspection on two practice openings using a checklist of at least 25 items, recording each observation in real time.

  • Classify every finding as critical, operational or cosmetic, and state the corrective action and urgency tier for each.

  • Demonstrate field verification techniques for positive latching, self-closing, automatic-closing devices and clear opening width.

  • Explain how to handle an opening you cannot fully access, including what must be documented and reported.

Your checkpoint

Two completed inspection checklists (25+ items each) with every deficiency tagged by severity class and paired with the rule it violates.

Week 5

Inspection procedures, field testing and documentation

  • Draft inspection narratives that state location, rating, observed condition, cited requirement, corrective action and responsible party for each finding.

  • Distinguish as-built records from as-inspected records, and identify the documents a complete inspection file must contain.

  • Select and sequence photographic evidence so the report stands on its own without further explanation.

  • Critique a sample report for defensibility: identify unsupported conclusions, missing citations and ambiguous findings.

  • Explain record retention expectations and how the report may be used in a later code or liability dispute.

Your checkpoint

A full mock inspection report for one opening containing at least 12 findings, each with a code citation, photo reference and corrective recommendation.

Week 6

Professional practice, ethics and code of conduct

  • Apply professional conduct principles to conflicts of interest, including situations where the inspector is retained by the installing contractor or the seller.

  • Distinguish the inspector's role from installer, consultant and authority-having-jurisdiction roles, and state where each role's authority ends.

  • Evaluate confidentiality, impartiality and reporting-integrity scenarios, and identify the correct course of action in each.

  • Describe the professional and legal consequences of a falsified, inflated or softened report.

  • Define your own scope-of-competence boundary and write the referral language you would use when a question exceeds it.

Your checkpoint

Written responses to 12 ethical scenarios, each naming the governing conduct principle and the specific action you would take.

Week 7

Fire door assemblies and hardware (doors, frames, closers, latching and exiting hardware) & Codes, standards and life-safety requirements applicable to fire doors & Inspection procedures, field testing and documentation & Professional practice, ethics and code of conduct

  • Re-diagnose weak areas from all prior quizzes and rank them by expected point recovery per study hour.

  • Solve a timed 50-question mixed set under exam pacing, then analyze every miss for rule gap versus misread versus guessing.

  • Re-explain your two weakest domains aloud from memory, without notes, and verify accuracy against source material.

  • Rebuild any flashcard or summary sheet that failed to prevent a repeat error.

Your checkpoint

An error log of at least 20 missed items, each with root cause, the correct rule restated in one sentence, and the remediation completed.

Week 8

Fire door assemblies and hardware (doors, frames, closers, latching and exiting hardware) & Codes, standards and life-safety requirements applicable to fire doors & Inspection procedures, field testing and documentation & Professional practice, ethics and code of conduct

  • Complete two full-length timed simulations under exam conditions, with no references and a fixed clock.

  • Recite from memory the citations, thresholds and numeric limits you repeatedly missed, and verify each against source.

  • Compress the entire body of material into a one-page recall sheet generated without notes, then check it for errors.

  • Finalize a test-day plan covering pacing rules, when to flag and return, and how to handle unfamiliar hardware scenarios.

Your checkpoint

Two scored full-length mock exams at or above 85 percent plus a corrected one-page recall sheet.

Milestones

Week 2: Without references, correctly assign opening protective ratings to eight wall/occupancy scenarios and cite the governing provision for each; score 80 percent or better on a 25-question domains 1-2 quiz.

Week 4: Complete both practice inspections in under 45 minutes each with no missed critical deficiency, and achieve 80 percent or better on a 30-question checkpoint spanning domains 1, 2 and 3.

Week 6: Submit the mock report and the 12 ethics responses for review; every finding and every scenario must carry a citation, with zero unsupported conclusions.

Week 8: Score 85 percent or better on both timed full-length simulations, with no domain falling below 75 percent, and confirm the recall sheet is error-free.