AMPP CAS-1 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Surface Preparation

  • Define surface preparation standards terminology (SSPC/NACE surface cleanliness grades) in your own words

  • List the sequence of steps for abrasive blast cleaning and identify what each step removes

  • Explain how surface profile (anchor pattern) is created and why it matters to adhesion

  • Identify common surface contaminants (mill scale, rust, oil, salts) and the method used to detect each

Your checkpoint

One-page reference sheet mapping each cleanliness grade to its defining visual/descriptive criteria and the contaminant it addresses

Week 2

Surface Preparation

  • Compare abrasive blast, power tool, hand tool, and water-jetting methods by achievable cleanliness and typical use case

  • Describe how environmental conditions (dew point, surface temperature, humidity) affect surface prep and when to stop work

  • Outline inspection checkpoints during surface prep and what is verified at each

  • Explain salt/chloride testing and why residual salts shorten coating life

Your checkpoint

Surface preparation checklist with at least 10 verification points, each tied to a go/no-go criterion

Week 3

Protective Coatings Application

  • Classify generic coating types (epoxy, polyurethane, zinc-rich, inorganic) by chemistry and typical service environment

  • Explain the function of each coat in a multi-coat system (primer, intermediate, topcoat)

  • Describe mixing, induction time, pot life, and recoat window for a typical two-component coating

  • Identify common application methods (brush, roller, conventional/airless spray) and their tradeoffs

Your checkpoint

Annotated diagram of a three-coat system labeling each coat's purpose, chemistry, and application method

Week 4

Protective Coatings Application & Coating Inspection and Quality Control

  • Calculate theoretical and practical coverage (spread rate) from a given volume solids and target dry film thickness

  • Convert between wet film thickness and dry film thickness using volume solids percentage

  • List application defects (sags, runs, holidays, orange peel) and their likely causes

  • Explain why measuring DFT at multiple points is required and how to average readings

Your checkpoint

Worked problem set of 10 coverage/WFT-to-DFT calculations with answers and one defect-cause table

Week 5

Coating Inspection and Quality Control

  • Describe how to verify environmental conditions before and during application (temperature, humidity, dew point)

  • Explain holiday/pinhole detection methods and when each is appropriate

  • Outline a coating inspection plan: pre-job, in-process, and final inspection stages

  • Identify the purpose of adhesion testing and the difference between destructive and non-destructive checks

Your checkpoint

Draft inspection plan template covering pre-job, in-process, and final stages with the measurement taken at each

Week 6

Coating Inspection and Quality Control

  • Interpret a coating specification to extract required DFT, number of coats, and acceptance criteria

  • Explain documentation requirements: daily reports, batch records, and nonconformance handling

  • Describe how to evaluate a failed inspection and determine root cause category (material, application, environment)

  • Practice identifying when work must be stopped and reworked versus accepted

Your checkpoint

Completed mock inspection report for a hypothetical job including measurements, pass/fail calls, and one documented nonconformance

Week 7

Safety and Environmental Compliance

  • Identify hazards of abrasive blasting (silica dust, noise, flying debris) and the controls for each

  • Explain respiratory, eye, hearing, and skin protection requirements for coating work

  • Describe containment and ventilation requirements for spray application in confined spaces

  • Outline spill prevention, waste handling, and volatile organic compound considerations

Your checkpoint

Job hazard analysis for a blast-and-coat task listing at least 8 hazards with a specific control for each

Week 8

Protective Coatings Application & Surface Preparation & Coating Inspection and Quality Control & Safety and Environmental Compliance

  • Integrate all four domains into a single end-to-end job walkthrough from surface prep to final inspection

  • Review and correct weak areas identified in earlier deliverables

  • Complete timed practice questions across all domains and analyze missed items by domain

  • Summarize key formulas, standards, and safety controls into a final one-page sheet

Your checkpoint

Full-length timed practice exam with a scored review identifying the two weakest domains and a remediation action for each

Milestones

Week 2: Can state the defining criteria of each surface cleanliness grade and name the test for each contaminant without notes

Week 4: Scores at least 80% on the coverage/WFT-to-DFT problem set and correctly attributes each listed defect to a cause

Week 6: Produces a complete mock inspection report with correct pass/fail calls and a defensible root-cause determination

Week 8: Achieves at least 75% overall on the timed practice exam with no domain below 60%