AMPP CP1 Tester · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Job Site Safety

  • List every hazard category on a CP test site (electrical, traffic, excavation, confined space, chemical) and write a control for each from memory

  • Assemble and explain the PPE set required before energizing or de-energizing a rectifier

  • Demonstrate the safe shutdown/startup sequence for an impressed current rectifier on paper, including lockout/tagout steps

  • Explain shock hazards of AC vs DC and state minimum approach distances and grounding practices

  • Describe emergency response steps for a colleague contacting an energized structure or test lead

Your checkpoint

A one-page pre-job hazard assessment form you filled out for a simulated rectifier inspection, scored against a 12-item checklist with 100% of critical items present

Week 2

Equipment Setup and Calibration Support

  • Identify each component of a cathodic protection test station and state its function

  • Set up a multimeter, reference electrode, and test leads for a structure-to-electrolyte potential measurement and describe each connection

  • Perform and record a reference electrode calibration check against a second electrode, noting acceptance limits

  • Diagnose common setup faults: reversed polarity, open reference electrode, high-resistance soil contact, and stray AC pickup

  • Explain when and why a current interrupter is installed and how to verify synchronization between units

Your checkpoint

A completed equipment setup and calibration log covering 5 simulated setups, with a written cause-and-fix note for each of 4 injected faults

Week 3

Equipment Setup and Calibration Support & System Operation

  • Trace the DC circuit of a rectifier from transformer through bridge to anode bed and structure, labeling each element

  • Adjust rectifier tap settings and describe the effect of each change on output current and voltage

  • Compare galvanic and impressed current system operating characteristics and state when each is selected

  • Explain how interference currents arise from foreign structures and describe a bond mitigation approach

  • Describe what a current interrupter does to the measured potential and how to select an interrupt cycle

Your checkpoint

A hand-drawn rectifier and anode bed circuit diagram with output readings recorded for three tap settings, plus a one-paragraph interpretation of the trend

Week 4

System Operation & Field Data Collection and Testing

  • Plan a structure-to-electrolyte potential survey: define test point spacing, reference electrode placement, and contact technique

  • Collect and record at least 20 simulated potential readings, distinguishing instant-off from native and polarized values

  • Apply the -850 mV and 100 mV polarization shift criteria to a data set and state which criterion each reading satisfies

  • Explain how IR drop enters a potential reading and describe at least three ways to reduce it

  • Compute soil resistivity from a four-pin Wenner spacing setup and interpret the result for anode bed design

Your checkpoint

A field data sheet with 20 recorded potentials, a criteria determination for each, and a written summary flagging which locations fail the protection criterion

Week 5

Field Data Collection and Testing & Field Measurement

  • Convert raw field readings into corrected values, applying reference electrode offset and meter calibration factors

  • Measure and interpret close interval survey data to locate a coating holiday or current pickup zone

  • Calculate current requirement from structure surface area and current density, and compare it to measured rectifier output

  • Explain how coating quality, soil resistivity, and temperature affect measured potentials and measurement confidence

  • Identify out-of-tolerance measurements and state the retest or verification step for each

Your checkpoint

A worked measurement problem set of 10 calculations (resistivity, current requirement, IR-corrected potential) with all answers within tolerance of the key

Week 6

Documentation and Reporting & Field Measurement

  • Compile a survey record set that a second tester could reproduce: date, weather, soil conditions, instrument IDs, calibration status, and reading locations

  • Write test method descriptions for potential survey, soil resistivity, and rectifier output checks in your own words

  • Organize field notes and photos into a report structure with an executive summary, methods, results, and conclusions

  • Document a non-conformance or anomalous reading with the observation, likely cause, and recommended follow-up

  • Verify that all recorded values carry correct units, significant figures, and reference electrode identification

Your checkpoint

A complete 4-6 page mock CP survey report for a simulated site, including a data table, one figure, and a conclusions section that states pass/fail against the applicable criterion

Week 7

Job Site Safety & Documentation and Reporting

  • Re-derive the safety controls for the three highest-risk tasks and compare them against your week 1 hazard form, correcting any gaps

  • Review reporting requirements and rewrite any conclusions that are unsupported by the recorded data

  • Explain the tester's scope of work and when to escalate an out-of-scope condition to a certified specialist

  • Produce concise written explanations of 10 core concepts suitable for a field apprentice

Your checkpoint

A revised hazard assessment plus a self-audit checklist that scores your week 6 report on traceability, completeness, and claim-to-data support

Week 8

Job Site Safety & Equipment Setup and Calibration Support & System Operation & Field Data Collection and Testing & Documentation and Reporting & Field Measurement

  • Work through full-length practice sets for all six domains under timed conditions

  • Tabulate wrong answers by domain and re-study the two weakest domains with focused drills

  • Recite the protection criteria, calibration acceptance limits, and safety shutdown sequence from memory without notes

  • Rehearse explaining a complete CP test from setup to report in under 10 minutes

Your checkpoint

Two timed practice exams completed with scores logged by domain and a written list of the 10 facts you missed most often, each restated correctly from memory

Milestones

Week 2: Can complete a hazard assessment and set up a potential measurement with correct polarity and calibration check, unaided, in under 15 minutes

Week 4: Scores at least 80% on a self-made 30-question set covering safety, setup/calibration, and system operation

Week 6: Produces a mock survey report that a peer can follow from raw data to conclusion with no missing instrument or location identifiers

Week 8: Scores at least 85% on two timed full-domain practice exams with no domain below 75%