Mistake 1

Records every pipe-to-soil potential as a positive number, or drops the sign when logging readings.

Candidates memorize '850 mV' and treat the measurement as a magnitude; reversing meter leads or using absolute values makes a protected pipe look identical to an unprotected one and corrupts trend comparisons.

What to do instead

Connect the structure to the meter's positive terminal and the reference electrode to the negative terminal (or follow the meter's documented convention), verify polarity against a known cell, and record the sign explicitly on every reading.

Mistake 2

Accepts a −0.850 V CSE reading taken with the CP current on as sole proof of protection.

The criterion is a polarized potential; an on-potential includes IR drop from the CP current and can show 'protection' where the pipe is actually below criterion, especially in high-resistivity soil or at high current output.

What to do instead

Interrupt the CP current, take instant-off readings, and apply the IR-corrected or 100 mV polarization criterion; document native, instant-off, and on-potentials separately.

Mistake 3

Sets the reference electrode on pavement or several metres away from the pipe and records that value as the pipe-to-soil potential.

Soil IR drop between the pipe and the reference electrode adds to the measured voltage; the further the electrode is from the structure, the larger and more variable the error.

What to do instead

Place the reference as close as practical to the structure surface, directly over the pipe where possible, use a coupon or permanent reference at the pipe, and correct or reject readings taken through high-resistance surface layers.

Mistake 4

Runs a close-interval or potential survey without synchronizing the interrupter to the data logger.

The logger then samples a mixture of on- and off-cycles, so instant-off values are missed and stray or IR effects are misread as protection levels.

What to do instead

Use a synchronized interrupter and GPS- or cable-synchronized logger, confirm the cycle timing before the survey, and review the waveform to verify clean off-periods.

Mistake 5

Uses an uncalibrated or contaminated Cu/CuSO4 half-cell for all potential measurements.

A dirty, dry, or contaminated reference produces a constant offset or unstable junction potential, shifting every reading and making criterion checks unreliable.

What to do instead

Check the cell against a second reference or a known standard before and after the survey, keep the cell filled with saturated CuSO4 and clean the tip, and replace cells that show drift.

Mistake 6

Sizes galvanic anodes by mass and current capacity alone and ignores anode-to-earth resistance and driving voltage.

Anode output is driving voltage divided by total circuit resistance; high-resistivity soil or a poor backfill raises resistance and can cut output far below the calculated current requirement.

What to do instead

Calculate total circuit resistance including anode, backfill, soil, and lead resistance, select anode type for the soil resistivity range, and verify output after installation with a current measurement.

Mistake 7

Sees normal DC voltage and current on the rectifier and concludes the groundbed is protecting the structure.

A rectifier can show output while current is going to a broken header, a shorted anode, a nearby grounded structure, or an open circuit; output meters do not prove current reaches the pipe.

What to do instead

Measure individual anode currents, groundbed resistance, and structure-to-soil potentials, inspect taps and diodes, and compare the current balance with design expectations.

Mistake 8

Takes one instantaneous potential reading when stray current is suspected and concludes there is no interference.

Dynamic stray currents from transit, welding, or HVDC vary with time; a single reading can coincidentally fall within criterion while interference is present at other times.

What to do instead

Use 24-hour datalogging, multiple timed readings, and current-mapping or interrupted surveys to characterize the stray current pattern before judging interference.

Mistake 9

Treats a high-resistance pipe-to-soil reading as proof of a good coating and adequate CP.

High resistance can come from dry surface soil, poor reference contact, or a disbonded coating that shields the pipe; it does not by itself show coating quality or cathodic protection.

What to do instead

Verify with close-interval surveys, DCVG or coating conductance testing, and current-requirement tests; interpret resistance together with coating condition and IR-corrected potentials.

Mistake 10

Opens a rectifier cabinet or disconnects test leads without lockout/tagout and without verifying de-energization.

Rectifiers and CP circuits can involve hazardous AC and DC voltages, backfeed from other power sources, and stored energy; assuming a switch is open invites shock or arc flash.

What to do instead

Apply lockout/tagout, verify absence of voltage with a properly rated meter, use the required PPE, and treat all structure and groundbed conductors as energized until proven otherwise.