AMPP Nuclear Coatings study materials
AMPP Nuclear Coatings study resources

AMPP Nuclear Coatings cheat sheet

AMPP Nuclear Coatings · Keep the key ideas within reach.

Quick reference

Coating fundamentals and nuclear service environment

  • Service Level I coatings are applied to structures, systems, and components whose failure could prevent safe shutdown or mitigate accident consequences; they require qualification by radiation exposure and simulated design basis accident testing before use.

  • Service Level II coatings are those not classified Level I, but whose degradation or released debris could adversely affect safety-related systems; they do not require DBA qualification but must not impair Level I coating performance.

  • Service Level III coatings are all coatings that are neither Level I nor Level II; only general industrial good practice and normal quality requirements apply to them.

  • Qualification sequence rule: specimens are first exposed to gamma radiation per ASTM D4082 to a plant-specified total integrated dose, then the same specimens are exposed to the simulated DBA per ASTM D3911.

  • ASTM D3911 simulates loss-of-coolant accident conditions, typically combining elevated temperature and pressure with a chemical spray, and evaluates blistering, cracking, softening, and film loss afterward.

  • ASTM D4256 evaluates how readily a coating surface can be decontaminated; coatings in radiologically controlled areas are assessed for ease of removing contamination.

  • Zinc-rich primers are generally prohibited or restricted inside PWR containment because zinc reacts with boric acid spray, producing deposits and potentially generating hydrogen.

  • ASTM D5144 gives guidance on selecting and applying the family of protective coating standards for light-water nuclear power plants; ASTM D3843 defines the associated quality assurance requirements.

  • In-service monitoring follows ASTM D5163: periodic visual inspection, condition rating, trending of degradation, and documented corrective action for Level I and Level II coatings.

Quick reference

Surface preparation for nuclear coating systems

  • SSPC-SP 5/NACE No. 1 (white metal) or SSPC-SP 10/NACE No. 2 (near-white) is the typical minimum blast cleanliness for nuclear coating work; the product data sheet and specification govern which applies.

  • SSPC-SP 1 solvent cleaning must precede abrasive blasting so that oil and grease are not driven into the steel surface or the anchor profile by the abrasive.

  • Concrete is prepared to SSPC-SP 13/NACE No. 6, removing laitance, form release agents, curing compounds, and contaminants; new concrete must be adequately cured before coating.

  • Surface profile is measured after blasting by ASTM D4417 Method B (depth micrometer), Method C (replica tape), or Method D (comparator disc) and compared with the product data sheet requirement.

  • Soluble salt loading is determined by the Bresle patch method (ISO 8502-6 extraction, ISO 8502-9 conductivity) or by ASTM D4940 abrasive conductivity testing; limits are commonly 3 micrograms per square centimetre for immersion service.

  • Surface temperature must be at least 3 degrees Celsius (5 degrees Fahrenheit) above the dew point during both surface preparation and coating application.

  • Sharp edges, weld spatter, slag, laminations, and weld porosities are removed or smoothed before coating because they cause thin spots and holidays that fail continuity testing.

  • Abrasive must be clean, dry, and free of chlorides and other contaminants; nonmetallic or metallic abrasives are recycled only after verification that contamination has not accumulated.

  • Blasted steel must be coated within the time limit stated in the specification; visible rust bloom or surface oxidation requires reblasting before the primer is applied.

Quick reference

Coating application, materials, and environmental controls

  • Ambient and substrate temperatures must fall within the manufacturer's range, commonly 10 to 35 degrees Celsius for amine-cured epoxies, with relative humidity typically at or below 85 percent.

  • Inorganic zinc silicates cure by reacting with atmospheric moisture and generally require relative humidity above about 50 percent; dry, cold air can leave the film uncured and poorly adhered.

  • Two-component materials require recording of batch numbers, the exact mix ratio, the induction time, and the pot life; material beyond pot life is discarded rather than thinned.

  • Wet film thickness is calculated as dry film thickness divided by the volume solids fraction, and is verified during application with a comb or wheel gauge.

  • When the recoat window is exceeded, the cured film is abraded and cleaned per the manufacturer's instructions before the next coat to restore intercoat adhesion.

  • Stripe coats are brush-applied to edges, welds, bolt heads, and back-to-back members before the full coat, often in a contrasting color for verification.

  • Amine blush, a carbamate film forming on amine epoxies under cool or damp conditions, is removed with warm water or a solvent wipe before recoating.

  • Ventilation and dehumidification control solvent concentration, humidity, and surface temperature during application and cure; airflow is maintained until the film is set.

  • Metallic pigments other than those approved for the area are avoided in Level I coatings; the plant specification controls acceptable products and pigment types.

Quick reference

Inspection, testing, documentation, and quality assurance

  • Dry film thickness is measured per SSPC-PA 2: each spot is the average of five gauge readings, magnetic gauge tolerance is about plus or minus 3 percent, and spot averages must fall within 80 to 120 percent of the specified thickness.

  • Under SSPC-PA 2, when the specification states only a minimum thickness and no maximum, the maximum acceptance limit is three times the specified minimum.

  • Low-voltage wet sponge holiday testing per NACE SP0188 is used for films up to roughly 500 micrometres (20 mils); high-voltage spark testing per NACE SP0274 is used for thicker films, with voltage set by film thickness.

  • Adhesion is assessed by ASTM D3359 tape test after a cross-cut or X-cut for classification, or quantitatively by ASTM D4541 pull-off testing; concrete pull-off uses ASTM D7234.

  • Inspection personnel are qualified and certified under ASTM D4537; nuclear coatings specialists are qualified under ASTM D7108; applicators are qualified under ASTM D4227 for concrete and ASTM D4228 for steel.

  • Hold points are defined in the inspection and test plan, typically before blasting, after blasting and before priming, after stripe coating, after each full coat, and at final acceptance; work cannot continue until the hold point is released.

  • Environmental records are made at the start and end of each shift and include air temperature, relative humidity, steel or concrete surface temperature, and dew point.

  • The coating log records product identity, batch and lot numbers, mix ratio, application method, environmental conditions, and measured film thickness for each coat and area.

  • A nonconformance report documents any failure to meet specification, such as low thickness, a holiday, or an adhesion failure, together with disposition, corrective action, and re-inspection results; records are retained under the plant quality assurance program.