AMPP Nuclear Coatings study materials
AMPP Nuclear Coatings study resources

AMPP Nuclear Coatings study plan

AMPP Nuclear Coatings · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Coating fundamentals and nuclear service environment

  • Map how radiation, humidity, chemical spray, and thermal cycling in a containment environment degrade a protective coating, naming at least three distinct degradation pathways.

  • Distinguish Coating Service Level I, II, and III boundaries and assign one realistic plant example to each level.

  • Explain how ASTM D3911 simulated design-basis-accident testing and ASTM D4082 gamma radiation testing support a coating's safety function under ASTM D5144.

  • Trace the documentation chain from specification through QA record under 10 CFR 50 Appendix B and NQA-1, identifying where hold points occur.

Your checkpoint

A one-page concept map linking three degradation pathways to Service Level I/II/III examples and the two governing ASTM qualification tests.

Week 2

Surface preparation for nuclear coating systems

  • Select the correct SSPC surface preparation standard (SP 1, SP 2, SP 3, SP 6, SP 10, SP 5, SP 11, SP 12) for six field scenarios and justify each selection in one sentence.

  • Sequence solvent cleaning, abrasive blast, profile verification, and soluble salt testing into a logical work package with defined hold points.

  • Verify surface profile and soluble salt acceptance criteria against specification limits and state the test method for each (ASTM D4417 for profile; Bresle/ISO 8502 methods for salts).

  • Identify contamination-control and foreign-material-exclusion practices required when preparing surfaces inside a radiologically controlled area.

Your checkpoint

A one-page surface preparation process card listing, for each step, the governing standard, acceptance criterion, test method, and hold point.

Week 3

Surface preparation for nuclear coating systems & Coating application, materials, and environmental controls

  • Build a pre-blast checklist covering abrasive cleanliness, nozzle pressure, compressor air quality, and substrate condition.

  • Compare dew point, relative humidity, and steel temperature requirements across manufacturer data sheets and explain the condensation risk when each limit is violated.

  • Explain how ventilation, dehumidification, and heating are used together to hold required application conditions inside containment.

  • Match epoxy, phenolic, inorganic zinc, and elastomeric coating types to specific nuclear service conditions and defend each match with two criteria.

Your checkpoint

An environmental controls checklist with three explicit go/no-go criteria plus a four-row table pairing coating types to nuclear use cases.

Week 4

Coating application, materials, and environmental controls

  • Select a coating system for a Service Level I application and defend it against both DBA/LOCA and radiation qualification requirements.

  • Describe mixing, induction time, pot life, recoat window, stripe coating, and dry film thickness build requirements for a typical nuclear epoxy system.

  • Diagnose five common application defects (amine blush, pinholing, runs, dry spray, low film thickness) and prescribe a corrective action for each.

  • Explain how environmental controls and application sequencing interact with the QA hold-point structure on a nuclear coating job.

Your checkpoint

A coating system submittal outline covering qualification evidence, application parameters, and inspection points for one Service Level I system.

Week 5

Coating application, materials, and environmental controls & Inspection, testing, documentation, and quality assurance

  • Convert a written coating specification into an inspection and test plan with hold, witness, and surveillance points.

  • Identify the instrument and standard used for dry film thickness, holiday detection, adhesion, and surface profile measurements.

  • Apply SSPC-PA 2 dry film thickness sampling frequency to a stated area and calculate the number of readings required.

  • Define the record, sign-off, and traceability requirement attached to each inspection step.

Your checkpoint

A one-page inspection and test plan containing at least six inspection points, each with method, acceptance criterion, and required record.

Week 6

Inspection, testing, documentation, and quality assurance

  • Explain the personnel qualification and certification requirements for coating applicators and inspectors under ASTM D4537 and ASTM D7108.

  • Sequence a nonconformance from discovery through disposition, corrective action, verification, and closure in accordance with NQA-1 principles.

  • Audit a sample coating record package for missing traceability, incomplete sign-offs, and out-of-tolerance results, and write the findings.

  • Describe how in-service condition assessment findings feed back into coating program decisions and future specifications.

Your checkpoint

A mock audit report with five findings ranked by severity, each paired with a specific corrective action.

Week 7

Coating fundamentals and nuclear service environment & Surface preparation for nuclear coating systems & Coating application, materials, and environmental controls & Inspection, testing, documentation, and quality assurance

  • Answer 60 mixed practice questions spanning all four domains and categorize every miss by domain and topic.

  • Rebuild the three weakest topics identified in the practice set, writing a short rule statement for each that you can apply to new questions.

  • Resolve conflicts among specification, manufacturer data sheet, and referenced standard, and state the hierarchy of precedence you would follow.

  • Rehearse the full coating QA chain aloud from surface preparation through final acceptance, without notes.

Your checkpoint

A scored 30-question practice set at or above 80 percent plus a ranked list of the five weakest topics with corrective study actions.

Week 8

Coating fundamentals and nuclear service environment & Surface preparation for nuclear coating systems & Coating application, materials, and environmental controls & Inspection, testing, documentation, and quality assurance

  • Complete two timed full-length practice exams and record domain-level scores for each attempt.

  • Review every missed question and write a one-line decision rule that would prevent the same error on a new item.

  • Recite from memory the purpose of ASTM D3911, D4082, D5144, D4537, D7108, and the SSPC-SP and SSPC-PA series relevant to nuclear work.

  • Finalize a one-page exam-day reference sheet of acceptance criteria, environmental limits, and QA hold points.

Your checkpoint

A final full-length practice score at or above 85 percent plus a completed one-page exam-day reference sheet.

Milestones

Week 2: Explain, without notes, why SP 10 rather than SP 6 is specified for a Service Level I area and state the profile and salt acceptance criteria on your process card.

Week 4: Defend a chosen Service Level I coating system against the DBA/LOCA and radiation qualification requirements in under five minutes with no reference material.

Week 6: Produce an audit finding that cites the specific missing record, the requirement it violates, and the corrective action, in three sentences or fewer.

Week 8: Score at or above 85 percent on a timed full-length practice exam with no domain below 75 percent.