AR HVAC study materials
AR HVAC study resources

AR HVAC study plan

AR HVAC · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fundamentals, Safety, and Tools

  • Convert between psig, psia, inches of mercury, and Fahrenheit/Celsius, and explain why absolute pressure is required for refrigerant calculations.

  • Select the correct PPE and safe-work sequence for brazing, nitrogen pressure testing, and refrigerant transfer, and state the hazard controlled by each item.

  • Demonstrate the purpose and safe handling of the core service tools: manifold gauge set, vacuum pump, micron gauge, recovery machine, torch rig, and electronic leak detector.

  • Assemble a gauge manifold and vacuum pump on a trainer unit or simulator and record the readings you observe.

Your checkpoint

A one-page pressure/temperature conversion and PPE checklist card, plus a 25-question Domain 1 self-quiz scored at 80% or higher.

Week 2

Fundamentals, Safety, and Tools & Refrigeration Cycle, Components, and Refrigerants

  • Distinguish sensible from latent heat and define superheat and subcooling, naming the exact point on the circuit where each is measured.

  • Trace the four cycle states (compressed vapor, condensed liquid, flashed mixture, evaporated vapor) on a pressure-temperature chart using real gauge readings.

  • Convert gauge pressure to saturation temperature and back for at least two common refrigerants without looking up the answer.

  • Explain the safety and system hazards of liquid refrigerant in a compressor, nitrogen in a closed system, and acid/moisture contamination.

Your checkpoint

A hand-drawn, fully labeled P-T cycle diagram (states, pressures, temperatures, superheat and subcooling points) for one operating system, checked line by line against a published P-T chart.

Week 3

Refrigeration Cycle, Components, and Refrigerants

  • Describe the function and typical failure symptom of the compressor, condenser, metering device, evaporator, filter-drier, accumulator, and receiver.

  • Compare fixed-orifice, TXV, and EEV metering and predict how superheat changes for each as load and outdoor temperature shift.

  • Classify refrigerants by family (CFC, HCFC, HFC, HFO), blend type, and safety group, and match each class to its handling rules.

  • Apply EPA Section 608 requirements for venting prohibition, recovery, evacuation levels, leak repair triggers, and recordkeeping.

Your checkpoint

A component-and-refrigerant matrix (component, function, failure symptom, diagnostic reading) plus a 30-question Domain 2 quiz scored at 80% or higher.

Week 4

Electrical Systems and Controls

  • Read a ladder or schematic diagram and separate the power circuit from the control and safety circuits.

  • Measure voltage, amperage, resistance, and capacitance safely, stating the meter's CAT rating and the isolation step before each measurement.

  • Test capacitors, contactors, relays, thermostats, and motor windings and interpret the readings as good, open, shorted, or grounded.

  • Contrast PSC and ECM blower motors and explain the role of start capacitors, potential relays, and hard-start kits.

Your checkpoint

A fully labeled trace of a condensing unit's control circuit on a printed schematic, plus a meter-reading log of five hands-on measurements with a pass/fail interpretation for each.

Week 5

Electrical Systems and Controls

  • Trace a call for cooling from thermostat through the control board, contactor, and compressor/fan, naming every device the signal passes through.

  • Interpret control board fault indicators and LED blink patterns and convert them into a test point to probe.

  • Diagnose open circuits, high-resistance connections, shorted components, and grounded windings using a systematic half-split method.

  • Explain how defrost controls, high/low pressure switches, float switches, and lockout boards interrupt the call and how to confirm each is the cause.

Your checkpoint

Three written troubleshooting scenarios, each with a numbered diagnostic sequence, the expected reading at every test point, and the conclusion it supports.

Week 6

Installation, Service, Load Calculation, and Code/Regulations

  • Perform a room-by-room load estimate using a simplified worksheet covering orientation, insulation, glazing, infiltration, and occupancy.

  • Size equipment, ducts, and refrigerant lines to a given load, then check the result against static pressure and velocity limits.

  • Sequence a split-system installation: pad and placement clearances, line set routing, brazing with nitrogen purge, evacuation, and charging by weight or by superheat/subcooling.

  • Verify airflow and charge by measuring static pressure, temperature rise, and delta T, and state what each reading rules out.

Your checkpoint

A completed load calculation and equipment-selection worksheet for one sample house, including duct sizing and a charge-verification section with target values.

Week 7

Installation, Service, Load Calculation, and Code/Regulations

  • Apply refrigerant-handling regulations to cylinder filling limits, recovery cylinder labeling, and refrigerant transaction records.

  • Verify with your local authority having jurisdiction which mechanical, fuel-gas, and electrical code editions are enforced and what permits and inspections apply.

  • Check a sample installation against clearance, venting, disconnect, condensate, and platform requirements and list every deficiency.

  • Write a repeatable no-cool service procedure from dispatch through customer sign-off, including safety and documentation steps.

Your checkpoint

A one-page jurisdiction checklist (permit, inspection, code edition, refrigerant, electrical) sourced from your AHJ, plus a written service-call SOP with a deficiency list from the sample installation.

Week 8

Fundamentals, Safety, and Tools & Refrigeration Cycle, Components, and Refrigerants & Electrical Systems and Controls & Installation, Service, Load Calculation, and Code/Regulations

  • Complete two full-length timed practice exams under test-day conditions and score each domain section separately.

  • Re-drill the two lowest-scoring domains with targeted question sets until each section reaches 80%.

  • Rewrite every missed question as a one-line rule and consolidate them into a single must-know sheet.

  • Rehearse the exam-day logistics: reference materials allowed, calculator rules, and time-per-question pacing.

Your checkpoint

Two scored timed mock exams with a written remediation list, and a final overall score of 80% or higher with no domain section below 70%.

Milestones

Week 2: Score 80% or higher on a 25-question mixed Domain 1 quiz and correctly read superheat and subcooling off your own labeled P-T diagram without reference.

Week 4: Trace a full control circuit from schematic and correctly identify all four meter measurements (voltage, amperage, resistance, capacitance) on live or simulated equipment.

Week 6: Produce a complete load calculation and equipment selection for one sample house, with duct sizing and target charge values that pass a self-check against static pressure limits.

Week 8: Score 80% or higher overall on two timed full-length practice exams, with no individual domain section below 70%.