ARE 5.0 flashcards
ARE 5.0 · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Net multiplier
- Net revenue divided by direct labor cost. A multiplier of 3 means each dollar of direct labor generates three dollars of net revenue to cover indirect costs and profit.
- Utilization rate
- Direct, billable labor hours divided by total paid hours for a period. It measures how much staff time is charged to projects rather than to marketing, administration, or vacation.
- Break-even multiplier
- The multiplier at which revenue exactly covers direct labor plus indirect expenses, leaving zero profit. Billing below it means each hour worked loses money.
- Standard of care
- The degree of skill and care ordinarily exercised by reputable architects under similar circumstances. It is the benchmark for negligence claims and is not a guarantee of results.
- Statute of repose
- A fixed statutory period, often six to ten years, after which construction claims are barred regardless of when a defect is discovered; unlike a statute of limitations, discovery does not extend it.
- Additional services
- Work outside the basic services defined in the owner-architect agreement, such as programming, extensive redesign, renderings beyond the norm, or post-occupancy evaluation, which is billed separately.
- Critical path
- The longest sequence of dependent activities through a project network. It has zero total float and sets the shortest possible duration for the project.
- Total float
- The time an activity can be delayed without delaying project completion, calculated as late start minus early start or late finish minus early finish.
- Fast-tracking
- Overlapping design and construction phases to shorten the overall schedule. It compresses duration but increases the risk of rework and change orders.
- Crashing
- Adding labor, equipment, or overtime to critical-path activities to shorten the schedule. It reduces duration at the cost of higher expense and coordination risk.
- Request for information
- A formal written question from the contractor asking the design team to clarify or interpret the contract documents. The response becomes part of the project record.
- Construction change directive
- A written order directing a change in the work before the owner and contractor settle price or time; it is later priced and formalized by a change order.
- Efficiency ratio
- Net assignable area divided by gross building area. It shows how much of the floor plate is usable; office and institutional projects commonly fall between 0.65 and 0.80.
- Floor area ratio
- Total gross floor area divided by site area. Zoning uses FAR to cap building mass and sets lot coverage as a separate, independent limit.
- Occupant load
- The computed number of occupants a space must be designed for, found by dividing floor area by the code's occupant-load factor for that use.
- Programming
- The pre-design phase in which the architect establishes the owner's goals, gathers and analyzes facts, tests concepts, and states the design problem.
- Solar altitude
- The sun's angle above the horizon. At solar noon it equals 90 degrees minus latitude plus solar declination, and it determines shadow length and depth.
- Dead-end corridor
- A corridor segment with only one direction of escape, limited to 20 feet in unsprinklered buildings and 50 feet where sprinklers are installed.
- Travel distance
- The measured path length from the most remote occupied point to an exit, capped by code - commonly 200 feet unsprinklered and 250 feet sprinklered in business use.
- Common path of egress
- The part of egress travel where occupants must move in a single direction before reaching a point with two separate exit choices; its length is limited by code.
- Ramp slope limit
- Accessible ramps may not exceed a 1:12 slope, or 8.33 percent. Each run is limited in rise and requires landings, handrails, and edge protection.
- Guard height
- Guards at openings and elevated surfaces must be at least 42 inches high, with balusters spaced so that a 4-inch sphere cannot pass through.
- MasterFormat
- CSI's standard organizing system for specifications, arranged in numbered divisions by work type, such as 03 Concrete, 05 Metals, 08 Openings, and 09 Finishes.
- Three-part specification
- The standard section format: Part 1 General for references and submittals, Part 2 Products for materials, and Part 3 Execution for installation and field quality control.
- Level of development
- A BIM classification of element reliability, from LOD 100 conceptual massing through 200, 300, 350, and 400, to LOD 500 as-built conditions.
- Vapor retarder placement
- In cold climates the vapor retarder belongs on the warm interior side of the insulation; hot-humid climates rely more on exterior moisture control and drainage.
- Fire-resistance rating
- The time in hours that an assembly resists fire when tested to ASTM E119; ratings of one through four hours are assigned by the building code.
- Substantial completion
- The stage at which the work is sufficiently complete for the owner's intended use. It starts warranties, permits occupancy, and usually reduces retainage.
- Punch list
- A list of incomplete or defective items found during the final walkthrough that the contractor must correct before final completion and release of final payment.
- Lien waiver
- A written release of the right to file a mechanics' lien. Conditional waivers take effect when payment clears; unconditional waivers are effective on signing.
- Certificate of occupancy
- Issued by the building official once final inspections confirm that the building complies with code and is safe for its intended occupancy.
- Record drawings
- Drawings marked up by the contractor to show actual constructed conditions, including dimensions, locations, and changes, and delivered at closeout as as-builts.