ARE 5.0 study plan
ARE 5.0 · Give each week a clear focus.
8 weeks · About 8 hours per week
Project Planning & Design
Rank your baseline confidence 1–5 against each division's published content outline and set your study order from the result
Sketch three massing options for one fixed program on a constrained urban site, each showing setbacks, floor-area ratio, and height-limit compliance
Compute allowable floor area, required parking, and open-space ratios from a hypothetical zoning table and show every step
Compare passive solar orientation and daylighting strategies across four climate zones and record the trade-offs in writing
Your checkpoint
A one-page site feasibility worksheet for a mock urban site with three massing options and all calculations shown
Project Planning & Design
Trace egress paths through a mixed-occupancy floor plan and verify travel distance, common path, and exit width against code limits
Assemble a life-safety matrix linking occupancy classification, sprinkler status, and allowable area increases
Draft a schematic accessibility plan marking accessible routes, clearances, and fixture counts for a public building
Complete 40 timed practice items on planning and design and tag every miss by failure cause (knowledge gap, misread, or math error)
Your checkpoint
An error log of at least 15 tagged misses, each with a rewritten one-sentence rule statement
Project Development & Documentation
Decompose a wall assembly into its components and label the water, air, vapor, and thermal control layers for three different climate conditions
Detail a roof-to-wall intersection and a foundation-to-wall intersection at 1 inch equals 1 foot, annotating flashing and control-layer continuity
Match specification divisions to the drawings they govern and identify five coordination gaps in a sample drawing set
Calculate U-values and condensation risk for two candidate assemblies, then select one with a written justification
Your checkpoint
Two annotated details demonstrating continuous control layers plus a one-paragraph assembly selection memo
Project Development & Documentation
Compare structural, MEP, and envelope coordination sequences and state at which milestone each system's design must be frozen
Explain how a code-driven revision travels from drawing to specification to cost, using a single worked example
Reproduce your three weakest division 5 rule statements from memory with no notes and then correct them
Simulate a 60-item timed block covering divisions 4 and 5 under exam conditions
Your checkpoint
A scored 60-item mock (target 60% or better) with a prioritized remediation list naming your five weakest subtopics
Programming & Analysis
Convert a client interview transcript into a weighted space program with net-to-gross calculations
Analyze a hypothetical site for solar, wind, noise, and access constraints and rank three development options
Run a feasibility test comparing renovation against new construction using cost per square foot and code-upgrade triggers
Verify zoning and building code constraints for an adaptive-reuse scenario and list the variances it would require
Your checkpoint
A programming and feasibility packet for one mock project: weighted program, site analysis diagram, and a written go/no-go recommendation
Construction & Evaluation
Sequence construction delivery from bidding through final closeout and name the architect's deliverable at each phase
Draft a 10-item submittal register and a sample RFI response showing the review chain and contractual time limits
Categorize five common construction-phase disputes by project delivery method and describe the resolution path for each
Assemble a punch-list and substantial-completion workflow listing the documents required at each step
Your checkpoint
A one-page construction administration flow diagram plus a 10-item submittal register for a mock project
Practice Management & Project Management
Compare sole proprietorship, partnership, and corporate practice structures by liability, taxation, and capital requirements
Build a fee proposal and staffing plan for a mock project including multipliers, overhead, and profit
Draft a risk-management register covering contract terms, insurance types, and standard of care
Sequence a project schedule with phases, milestones, and staff assignments, then identify the critical path
Outline a quality-control and team-coordination plan for a twelve-person studio
Your checkpoint
A complete mock fee proposal with staffing plan, project schedule, and profit-and-loss projection
Project Planning & Design & Project Development & Documentation
Re-derive the ten highest-yield rules for divisions 4 and 5 starting from a blank page
Complete two full-length timed mock exams spanning all six divisions and record per-division scores
Diagnose every miss below 70% accuracy and rewrite the underlying rule in a single sentence
Rehearse exam-day logistics: appointment scheduling, identification requirements, break plan, and permitted calculator
Your checkpoint
Two scored full-length mocks plus a final correction sheet limited to the 20 rules you missed most often
Milestones
Week 2: Division 4 error log contains at least 15 tagged misses with rewritten rules, and your 40-item practice score is recorded
Week 4: Divisions 4 and 5 mock score is 60% or higher and a written remediation list of five subtopics exists
Week 6: All six divisions have a personal one-page summary sheet and the construction administration flow diagram is complete
Week 8: Both full-length mocks are scored, every division is at or above 70%, and the 20-rule correction sheet is finished