- Fixture unit (FU)
- A dimensionless measure of the probable load a fixture places on the drainage or water supply system; 1 FU equals 1 cubic foot per minute (cfm) of drainage flow or 1 gallon per minute (gpm) of water supply.
- Building drain
- The lowest piping of a drainage system that receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to the building sewer.
- Building sewer
- The extension from the building drain to the public sewer or other place of disposal; it begins at the building foundation and runs to the public sewer or private disposal system.
- Minimum water service size
- The smallest allowable diameter for a building water service is 3/4 inch, unless a larger size is required to deliver the peak demand at the minimum residual pressure.
- Residual pressure
- The pressure remaining in the water distribution system at the highest fixture while the system is delivering the peak demand; the code requires at least 8 psi at the highest fixture.
- Pressure-reducing valve
- A device that reduces the incoming water pressure to a safe level; it is required when the static pressure exceeds 80 psi to prevent damage to fixtures and piping.
- Drainage slope
- The slope of a horizontal drainage pipe must be at least 1/4 inch per foot for pipe sizes 2 inches and smaller, and at least 1/8 inch per foot for pipe sizes 3 inches and larger.
- Trap arm length
- The maximum developed length of a trap arm is based on the pipe diameter: 1-1/2 inch = 6 feet, 2 inch = 8 feet, 3 inch = 12 feet, and 4 inch = 16 feet.
- Vent terminal height
- A vent stack must extend at least 6 inches above the roof and at least 12 inches above any roof surface used for other purposes; the vent terminal must be at least 10 feet from any lot line, opening, or air intake.
- Cleanout spacing
- A cleanout must be installed at the base of each soil stack, at the building drain, and at intervals not exceeding 100 feet in horizontal drainage pipes; cleanouts must be accessible.
- Water closet flush volume
- The minimum water closet flush volume is 1.6 gallons per flush; the minimum urinal flush volume is 1.0 gallon per flush; the minimum showerhead flow rate is 2.5 gallons per minute at 80 psi.
- Water heater relief valve
- A temperature and pressure relief valve must be installed on the water heater; the relief valve must be piped to a safe location and must not be connected to the drainage system without an air gap.
- Trap seal depth
- The trap seal must be at least 2 inches and not more than 4 inches deep; the trap must be of the same size as the fixture drain.
- Fixture clearance
- The minimum clearance between a fixture and a wall or partition is 15 inches from the centerline of the fixture to the wall; the minimum clearance between two fixtures is 30 inches center-to-center.
- Cross-connection
- Any actual or potential connection between a potable water system and any nonpotable source; backflow is the reversal of flow in a water system.
- Backsiphonage
- Backflow caused by negative pressure in the supply system; it can occur when a water main breaks or when a large volume of water is drawn from the system.
- Air gap
- The most effective backflow prevention device; it must be at least twice the diameter of the supply pipe and never less than 1 inch.
- RPZ backflow preventer
- A reduced pressure principle backflow preventer is required for high-hazard applications; it consists of two independently acting check valves and a differential pressure relief valve.
- Double check valve assembly
- A double check valve assembly (DCVA) is used for low-hazard applications; it consists of two independently acting check valves and must be tested annually.
- Atmospheric vacuum breaker
- An atmospheric vacuum breaker (AVB) must be installed at least 6 inches above the highest downstream outlet; it cannot be used under continuous pressure.
- Water distribution test
- The water distribution system must be tested at a pressure of at least 100 psi for at least 60 minutes; the pressure must not drop more than 5 psi during the test.
- Drainage air test
- The air test for the drainage system must be conducted at a pressure of at least 5 psi for at least 15 minutes; the pressure must not drop more than 1 psi during the test.
- Final inspection
- The final inspection must be conducted after all plumbing work is complete and before the system is placed in operation; it verifies that all fixtures, appurtenances, and devices are installed in accordance with the approved plans.
- Plan review
- Plan review must verify that the plumbing system complies with the code; the review must include the sizing of the water supply and drainage systems, the venting system, and the backflow prevention devices.
- Plumbing permit
- A plumbing permit is required for the installation, alteration, repair, or replacement of a plumbing system; minor repairs and replacement of fixtures may be exempted by the authority having jurisdiction.
- Permit validity period
- The permit is valid for a period of 180 days from the date of issuance; the permit may be extended for an additional 180 days upon written request.
- Certificate of occupancy
- A certificate of occupancy must not be issued until the plumbing system has passed the final inspection; the certificate of occupancy is required before the building may be occupied.
- Stop-work order
- The code official may issue a stop-work order if the work is being performed in violation of the code; the stop-work order must be in writing and must state the reason for the order.
- Water and sewer separation
- The minimum distance between a water service pipe and a sewer pipe is 10 feet horizontally or 18 inches vertically; the water pipe must be above the sewer pipe if the vertical separation is less than 18 inches.
- Grease interceptor size
- The minimum size of a grease interceptor is 10 gallons per minute for a single-compartment sink; the grease interceptor must be installed downstream of all fixtures that discharge grease.
- Medical gas pipe
- The minimum size of a medical gas pipe is 1/2 inch; the pipe must be installed by a certified installer and must be tested in accordance with NFPA 99.
- Fuel gas pipe test
- The minimum size of a fuel gas pipe is 1/2 inch; the pipe must be installed in accordance with the fuel gas code and must be tested at a pressure of at least 1.5 times the maximum working pressure.