CPC33020 Bricklaying study materials
CPC33020 Bricklaying study resources

CPC33020 Bricklaying key terms

CPC33020 Bricklaying · Get comfortable with the vocabulary.

Course

A horizontal layer of brickwork or blockwork of consistent height, built as one operation before the next layer is added. Courses are measured in millimetres and set the module for the whole wall.

Related: Bed joint, Gauge
Bed joint

The horizontal layer of mortar on which a brick or block is laid. Its thickness controls course height and must stay consistent to keep the wall level and true.

Related: Course, Perpends, Mortar
Perpends

The vertical mortar joints between adjacent bricks or blocks in the same course. They are filled fully and kept uniform in width to spread load and prevent water penetration.

Related: Bed joint, Cross joint
Cross joint

Another name for the vertical joint separating two units along the length of a wall, formed where one brick or block meets the next end to end in the same course.

Related: Perpends
Gauge

The vertical spacing between successive bed joints, usually set by a gauge rod or storey pole. Consistent gauge keeps courses level around the building and matches openings and fixings.

Related: Course, Storey pole
Storey pole

A marked timber or metal batten showing course heights, sill and lintel levels for a job. It is set up at corners so every course lines up around the whole structure.

Related: Gauge, Datum
Bond

The planned arrangement of bricks or blocks so that vertical joints in one course do not line up with those in the course above, tying the wall into one strong unit.

Related: Stretcher bond, Header, Overlap
Stretcher bond

A bonding pattern where every unit is laid lengthwise along the wall face, with each course offset by half a unit so vertical joints are staggered between courses.

Related: Bond, Half bat
Header

A brick or block laid so its shorter end face shows on the wall surface, used to tie two leaves of a wall together or to form decorative and strengthening patterns.

Related: Bond, Collar joint
Half bat

A brick or block cut to half its normal length, used to start or finish a course so the bond is maintained and joints are staggered correctly.

Related: Stretcher bond, Bond
Overlap

The distance one unit extends past the joint below it, expressed as a fraction of unit length. Adequate overlap is what gives a bonded wall its strength.

Related: Bond, Half bat
Collar joint

The vertical joint running lengthwise between the inner and outer leaves of a cavity or thick wall. It is filled with mortar or grout to tie the leaves together.

Related: Cavity wall, Header, Wall tie
Cavity wall

A wall built as two separate leaves with a gap between them. The cavity stops moisture crossing to the inner leaf and improves thermal and acoustic performance.

Related: Wall tie, Collar joint, Flashing
Wall tie

A corrosion-resistant metal fitting built into both leaves of a cavity wall to hold them together. Ties are spaced at set centres and must slope slightly to shed water inward.

Related: Cavity wall, Collar joint
Mortar

A mix of sand, cement, lime and water used to bed and joint masonry units. Its strength, workability and colour depend on the proportions chosen for the job.

Related: Bed joint, Mortar mix ratio, Plasticiser
Mortar mix ratio

The stated proportion of cement, lime and sand by volume in a mortar, such as 1:1:6. The ratio determines strength, durability and flexibility for a given exposure condition.

Related: Mortar, Plasticiser
Plasticiser

An additive or lime content that makes mortar easier to spread and improves its workability without adding extra water, helping units bed down evenly and stick to the mix.

Related: Mortar, Mortar mix ratio
Flashing

A strip of impervious material such as metal or plastic built into masonry at junctions and openings to divert water out of the wall rather than letting it soak inward.

Related: Cavity wall, Weep hole, Damp-proof course
Weep hole

A small open joint or tube left in the outer leaf just above flashing so water collected in the cavity can drain out. Weep holes must stay clear of mortar droppings.

Related: Flashing, Cavity wall
Damp-proof course

A continuous impervious layer built into a wall, usually near ground level, that stops moisture rising from the ground into the masonry above by capillary action.

Related: Flashing, Damp-proof membrane
Damp-proof membrane

A sheet material laid under a concrete slab or floor to prevent ground moisture entering the building. It is lapped and sealed, and turned up at edges where required.

Related: Damp-proof course
Lintel

A horizontal structural member spanning an opening in a wall to carry the masonry above it. It may be steel, concrete, timber or a reinforced masonry unit.

Related: Bearing, Opening
Bearing

The length of a structural member such as a lintel or beam that rests on supporting masonry at each end, spreading the load safely into the wall.

Related: Lintel
Opening

A gap left in a wall for a door, window or service penetration. Openings need accurate setting out, adequate bearings and correct lintel and flashing details.

Related: Lintel, Bearing
Setting out

Marking the position of walls, corners and openings on the ground or slab before bricklaying starts. Accurate setting out ensures the building matches the drawings and is square.

Related: Datum, Profile, Square
Datum

A fixed reference level or line from which heights and positions are measured on site. Datums are carried from benchmarks so floors, courses and openings align throughout the job.

Related: Setting out, Storey pole
Profile

A horizontal board fixed on stakes at the corners of a building, marked with the wall lines and used with string lines to control setting out and keep walls straight.

Related: Setting out, String line
String line

A taut cord stretched between two points to give a straight edge and constant level for laying courses. Bricklayers line and level each course against it as they build.

Related: Profile, Level
Level

The condition of being truly horizontal, checked with a spirit level or laser. Each course must be levelled across its length and around corners to avoid cumulative error.

Related: Plumb, String line
Plumb

The condition of being exactly vertical, checked with a spirit level or plumb rule. Walls, reveals and corners must be plumb for the full height of the work.

Related: Level, Square
Square

A corner or setting-out line at exactly 90 degrees, checked with a builder's square or the 3-4-5 method. Square corners keep the building rectangular and rooms true.

Related: Setting out, Plumb
Pointing

Finishing the exposed face of mortar joints by tooling them to a chosen profile. Correct pointing compacts the mortar, improves weather resistance and gives a neat appearance.

Related: Perpends, Mortar
Tooling

Working the surface of a mortar joint with a jointer or trowel while the mortar is firm, compacting it against the brick edges and forming the finished joint profile.

Related: Pointing, Mortar
Efflorescence

A white powdery deposit of soluble salts carried to the surface of masonry by water and left behind as it evaporates. It is usually brushed off and does not affect strength.

Related: Mortar, Damp-proof course
Brick tie

A metal anchor used to secure a non-structural masonry leaf to a structural frame or backing wall, allowing movement while resisting lateral loads such as wind.

Related: Wall tie, Cavity wall
Movement joint

A deliberate vertical gap in a wall that lets masonry expand and contract with temperature and moisture without cracking. It is filled with a compressible backing and sealant.

Related: Cavity wall, Flashing
Brick veneer

A single outer leaf of brickwork tied to a framed structure, providing a weather-resistant decorative facing while the frame carries the structural loads.

Related: Wall tie, Cavity wall
Blockwork

Masonry built from concrete or similar blocks, usually larger and faster to lay than bricks. Blocks need accurate bedding and are often used for internal and backing walls.

Related: Course, Mortar