CPC33020 Bricklaying study plan
CPC33020 Bricklaying · Give each week a clear focus.
8 weeks · About 7 hours per week
Core units of competency
Map every core unit of competency to its performance criteria and note which criteria require on-site evidence
Define safe work method statement (SWMS) and personal protective equipment requirements for a bricklaying work area in writing
Identify the tools, plant and materials named in core units and list them by task type
Set up a study log that records hours, topics covered and questions to raise with your trainer
Your checkpoint
A one-page core-unit coverage matrix listing each unit, its performance criteria count and your current confidence rating (1-5)
Core units of competency
Interpret a simple residential plan and elevation to extract wall lengths, heights and opening sizes
Calculate brick quantities for a given wall area using standard brick dimensions and a stated wastage allowance
Convert between metric units used on site (millimetres, metres, cubic metres) without error
Explain how a datum and set-out lines are transferred from plan to ground
Your checkpoint
A worked quantity take-off for one small structure showing wall area, brick count, mortar volume and wastage
Core units of competency
Describe the correct mix ratios and consistency for mortar used in brick and block work
Sequence the steps to set out and build a corner lead with a spirit level and line
Identify common causes of out-of-plumb and out-of-level work and state the correction for each
Demonstrate in writing how to check coursing height against a gauge rod
Your checkpoint
A written step-by-step procedure for building a corner lead, at least ten sequential steps, checked against your core unit criteria
Core units of competency
Distinguish between structural and non-structural wall ties, lintels and damp-proof course placement
Explain the purpose and installation rules for flashing at openings and roof junctions
List the defects that would fail an inspection of a completed wall and how each is prevented
Match each core unit's safety requirements to a realistic site hazard
Your checkpoint
A defects and inspection checklist covering at least fifteen items with the prevention method for each
Core units of competency
Interpret the compliance and quality requirements that apply to bricklaying work under relevant Australian standards and the National Construction Code
Summarise workplace communication and teamwork obligations from core units
Explain how to record and report a non-conformance or safety incident
Plan how you will gather third-party and workplace evidence for the core units you cannot demonstrate in a training workshop
Your checkpoint
An evidence plan listing, for each remaining core unit, the type of evidence you will collect and where you will collect it
Elective units of competency
Identify the elective units available in this qualification and select the ones that match your intended job role
Compare the performance criteria of your chosen electives against the core units to find overlapping skills
Describe the additional tools, materials or techniques each chosen elective introduces
Draft a short procedure for one elective-specific task you have not yet performed
Your checkpoint
A completed elective selection sheet with a one-paragraph justification for each chosen unit
Elective units of competency & Core units of competency
Rehearse the practical tasks from your electives by writing out the sequence, safety checks and quality checks for each
Link each elective task back to at least one core safety or quality requirement
Review your weakest three core units and rewrite the performance criteria in your own words
Practise explaining a bricklaying method aloud in plain language, as you would to an assessor
Your checkpoint
A set of written task plans for every elective practical, each cross-referenced to a core unit
Core units of competency & Elective units of competency
Consolidate all notes into a single indexed revision file organised by unit code
Answer practice questions under time pressure for both domains and mark your own answers
Confirm your evidence portfolio is complete and each item maps to a performance criterion
List any remaining gaps and book time with your trainer to close them
Your checkpoint
A complete evidence portfolio index plus a gap list of no more than five items with a plan to close each
Milestones
Week 2: You can complete a brick quantity take-off for a small structure unaided and explain each step
Week 4: You can describe a corner lead procedure and a wall inspection checklist from memory, scoring at least 80% against your own written version
Week 6: All elective units are chosen and justified, and every core unit has a planned evidence source
Week 8: Evidence portfolio index is complete and the gap list has five or fewer open items