Hierarchy of control
The ranked order for managing risk: eliminate, substitute, isolate, engineer, administer, then use PPE. Controls higher in the list are more reliable because they do not depend on human behaviour.
Test before touch
The isolation procedure: identify, isolate, lock and tag, prove the tester on a known live source, test for dead on all conductors, then re-prove the tester.
Arc flash incident energy
The thermal energy released by an arcing fault at a given working distance, expressed in calories per square centimetre. It determines the arc-rated clothing category required.
Primary duty of care
The obligation on a person conducting a business or undertaking to ensure the health and safety of workers and others so far as is reasonably practicable.
Notifiable incident
A death, serious injury or illness, or dangerous incident such as an electric shock or structural collapse that must be reported to the WHS regulator immediately.
Hazardous waste segregation
Separating mercury lamps, batteries, contaminated absorbents and oils from general waste so each stream is collected and disposed of through a licensed recycler.
Ohm's law and power
V equals I times R. Power P equals V times I, which also equals I squared times R or V squared divided by R.
Capacitive reactance
Xc equals one divided by two pi f C. It falls as frequency rises, so capacitors pass high frequencies and block DC.
Power factor
The ratio of real power to apparent power, equal to cos phi and to R divided by Z. A low value means more current for the same useful power.
Three-phase star relationship
In a star connection the line voltage equals root three times the phase voltage, while the line current equals the phase current.
Voltage drop limit
AS/NZS 3000 limits voltage drop to five percent from the point of supply to any point of installation for low-voltage consumers.
Protective device coordination
The design current must not exceed the device rating, the device rating must not exceed cable capacity, and the device must clear overloads before cable damage.
Cable derating factors
Correction factors applied to base current-carrying capacity for ambient temperature, grouping, thermal insulation and installation method, as tabulated in AS/NZS 3008.1.1.
IP rating digits
The first digit rates protection against solids from zero to six; the second rates protection against liquids from zero to eight. IPX4 means splash-resistant.
Equipment protection class
Class I relies on protective earthing; Class II is double-insulated without an earth; Class III operates at safety extra-low voltage.
Luminous efficacy
The light output in lumens divided by the electrical power in watts. LED lamps typically reach 80 to 150 lumens per watt.
Synchronous speed
Ns equals 120 times frequency divided by the number of poles. A four-pole motor on 50 hertz has a synchronous speed of 1500 rpm.
Star-delta starting
A starting method that connects the motor windings in star for starting, reducing current and torque to one third, then switches to delta for running.
Seal-in contact
A normally open auxiliary contact wired in parallel with the start button so the contactor coil stays energised after the button is released.
Insulation resistance test
A DC test at 500 volts between conductors and earth. The measured resistance must be at least one megohm for a low-voltage installation.
Earth fault loop impedance
The total impedance of the fault path from the point of fault back to the supply transformer. It determines whether the protective device disconnects within the required time.
RCD trip test
Verification that the device does not trip at half rated residual current, trips within the specified time at rated current, and trips quickly at five times rated current.
MEN system
Multiple earthed neutral: the neutral is earthed at the supply transformer and again at the installation main earthing point, keeping fault loop impedance low.
Certificate of compliance
A legal document issued by the licensed electrician confirming that the electrical work performed complies with the Wiring Rules and relevant standards.
AS/NZS 3012
The standard for electrical installations on construction and demolition sites, covering temporary supplies, leads, and inspection and testing of portable equipment.
Single-line diagram
A simplified drawing showing the electrical distribution from supply through main switchboard, sub-boards and protective devices, with each circuit represented by one line.
As-built drawings
The final drawings updated to show the installation as actually constructed, including all variations, issued to the client at project handover.
Cable schedule
A table listing each cable's size, type, length and route, used for procurement and installation and reconciled against the drawing set.
Job safety analysis
A documented pre-work process that breaks the task into steps, identifies hazards for each step, and records the controls before work begins.
Anti-islanding protection
A function of grid-connected inverters that disconnects the solar array from the network when the grid supply is lost, protecting workers during outages.
Coefficient of performance
The ratio of heat delivered to electrical energy consumed by a heat pump. Values of three to five mean far less energy than resistive heating.
Power factor correction
Adding switched capacitors to supply reactive power locally, reducing the current drawn from the supply and lowering demand charges on the electricity account.