Advanced Boiler (BA) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Boiler Design, Construction, and Thermodynamics & Fuels, Combustion, and Combustion Controls

  • Map the boiler pressure-parts envelope and heat-absorption path from furnace to superheater, labeling each component's function on a hand-drawn one-page diagram

  • Compute steam enthalpy, sensible heat, and latent heat for three pressure cases using steam tables without reference notes

  • Derive combustion air requirements and flue-gas composition for natural gas and No. 2 oil from ultimate analysis

  • Explain the roles of drum internals, waterwalls, economizer, and air preheater in the overall energy balance

  • Identify the three T's of combustion and describe how each is controlled in a packaged industrial boiler

Your checkpoint

One-page annotated boiler schematic plus a worked combustion and steam-table problem set with correct final answers

Week 2

Boiler Design, Construction, and Thermodynamics & Fuels, Combustion, and Combustion Controls

  • Calculate boiler efficiency by both input-output and heat-loss methods and reconcile the two results

  • Analyze the effect of excess air on efficiency, stack temperature, and CO formation

  • Describe fuel oil atomization, gas train components, and burner management sequence up to pilot light-off

  • Solve thermal-expansion and stress problems for a drum or tube under steady-state operation

  • Compare firetube and watertube designs on response rate, water volume, and pressure limits

Your checkpoint

Efficiency calculation sheet for two fuels at three excess-air levels with a written reconciliation of method differences

Week 3

Boiler Operations, Startup, and Shutdown & Steam, Feedwater, and Water Treatment Systems

  • Write the cold-start sequence for a watertube boiler from pre-purge through main flame and pressure stabilization

  • Explain drum level dynamics including swell, shrink, and false indication during startup and load change

  • Describe feedwater treatment goals for oxygen, hardness, silica, and conductivity control

  • Justify bottom blowdown and surface blowdown practices and their effect on chemistry limits

  • Identify the causes and consequences of carryover and priming

Your checkpoint

Step-by-step startup and shutdown procedure card for one boiler type with chemistry checkpoints embedded

Week 4

Boiler Operations, Startup, and Shutdown & Steam, Feedwater, and Water Treatment Systems

  • Diagnose five abnormal operating scenarios such as low water, high water, flame failure, and tube leak and state the correct operator response

  • Explain deaerator operation and the chemistry basis for oxygen scavenging

  • Describe the shutdown sequence including cooldown limits and layup methods for wet and dry storage

  • Interpret a water-analysis report and recommend corrective chemical action

  • Trace the feedwater and condensate path and identify each sample point

Your checkpoint

Abnormal-condition response matrix covering at least eight scenarios with cause, indication, and action columns

Week 5

Boiler Auxiliaries, Pumps, Fans, and Instrumentation & Controls, Safeguards, and Interlocks

  • Explain centrifugal pump cavitation, NPSH, and affinity laws with worked numerical examples

  • Compare fan curves with system resistance curves and describe how dampers and VFDs shift the operating point

  • Identify the function of each instrument loop on a boiler: level, pressure, temperature, flow, and O2 trim

  • Describe the purpose of low-water cutoff, high-pressure limit, flame scanner, and safety valve in the safeguard chain

  • Explain how interlocks enforce purge, trial-for-ignition, and post-purge timing

Your checkpoint

Annotated control-and-safeguard loop diagram plus a pump and fan calculation worksheet

Week 6

Controls, Safeguards, and Interlocks & Inspection, Maintenance, and Testing

  • Trace a burner management system sequence and identify every permissive and interlock in the path

  • Describe the difference between a safety interlock and an operating control and give examples of each

  • Plan a hydrostatic test and explain the test-pressure basis and acceptance criteria

  • Describe nondestructive examination methods used on boiler tubes and shells and what each detects

  • Outline a preventive maintenance schedule for safety valves, gauges, and low-water cutoffs

Your checkpoint

Written inspection and testing plan for one boiler covering NDE methods, hydrostatic test steps, and PM intervals

Week 7

Inspection, Maintenance, and Testing & Codes, Standards, and Regulatory Compliance

  • Identify the scope of ASME Boiler and Pressure Vessel Code Section I and Section IV and how each applies to a given unit

  • Explain jurisdictional inspection intervals, certificate of inspection, and operator certification requirements in general terms

  • Distinguish code requirements from manufacturer recommendations and from good engineering practice

  • Describe recordkeeping obligations for repairs, alterations, and inspections

  • Prepare a compliance checklist for a routine annual inspection

Your checkpoint

Code-and-compliance checklist mapping each inspection item to its governing requirement category

Week 8

Safety, Emergency Procedures, and Environmental Protection & Boiler Operations, Startup, and Shutdown & Boiler Design, Construction, and Thermodynamics

  • Explain emergency procedures for low-water condition, overpressure, furnace explosion, and fuel-oil leak

  • Describe environmental controls for NOx, SOx, and particulate including low-NOx burners and flue-gas recirculation

  • Integrate design, operations, and safety knowledge by explaining why a low-water cutoff must be tested under actual load conditions

  • Complete timed practice sets across all nine domains and review every missed item to root cause

  • Build a personal weak-topic list with a remediation plan for each entry

Your checkpoint

Full-length timed practice exam with a scored error-analysis log and a prioritized remediation list

Milestones

Week 2: Score at least 80 percent on a self-made 25-question quiz covering domains 1 and 2, including one full efficiency calculation

Week 4: Explain the startup sequence, drum level behavior, and water chemistry limits aloud from memory without notes

Week 6: Trace the complete burner management sequence and identify every interlock with no reference material

Week 8: Achieve at least 75 percent overall on the timed practice exam with no domain below 60 percent