Chain of responsibility

A legal framework that places safety duties on every party in the supply chain, including the crane owner, operator, rigger, scheduler and site controller, not only the person at the controls.

Related: Primary duty of care, Person conducting a business or undertaking
Primary duty of care

The overarching legal obligation on a business to ensure, so far as is reasonably practicable, the health and safety of workers and others affected by its operations, including crane lifts.

Related: Chain of responsibility, Reasonably practicable
Person conducting a business or undertaking

The legal entity, such as an employer, contractor or self-employed operator, that holds work health and safety duties for the crane operations it manages or controls.

Related: Primary duty of care, Chain of responsibility
Reasonably practicable

The test used to judge whether a safety control is required, weighing the likelihood and severity of harm against the cost and difficulty of the control.

Related: Hierarchy of control, Primary duty of care
High risk work licence

A national licence issued to a person who has demonstrated the competence required to perform specified high risk work, such as operating a slewing mobile crane above 100 tonnes.

Related: Competency assessment, Verification of competency
Verification of competency

The process by which a registered assessor confirms that a candidate can perform the required tasks safely and to the standard, supporting the issue of a high risk work licence.

Related: High risk work licence, Competency assessment
Safe work method statement

A written document that sets out the high risk construction work to be done, the hazards involved, the controls to be applied and how the controls will be implemented and reviewed.

Related: Lift plan, Hierarchy of control
Hierarchy of control

The ranked order of risk controls, from eliminating the hazard through substitution, engineering controls, administrative controls to personal protective equipment, used to select the most effective control.

Related: Risk assessment, Reasonably practicable
Risk assessment

A structured process of identifying hazards, evaluating the likelihood and consequence of harm and deciding which controls are needed before a lift proceeds.

Related: Hierarchy of control, Job safety analysis
Job safety analysis

A task-based breakdown in which each step of a job is examined for hazards and controls, often completed by the crew at the workplace before starting work.

Related: Risk assessment, Pre-start briefing
Exclusion zone

A marked area beneath and around the crane, load path and slew radius that only authorised people may enter, kept clear of personnel while a lift is in progress.

Related: Slew radius, Bystander control
Bystander control

Measures such as barricades, signage, spotters and public exclusion areas used to keep people who are not part of the lift crew away from the hazard zone.

Related: Exclusion zone, Spotter
Load chart

A manufacturer-supplied table or graph showing the rated capacity of a crane for a given radius, boom length, configuration and quadrant, subject to stated notes and deductions.

Related: Rated capacity, Working radius
Rated capacity

The maximum load a crane may lift in a specific configuration and radius, as stated in the load chart, before deductions for hook block, rigging and attachments are applied.

Related: Load chart, Gross load
Gross load

The total mass suspended from the crane, including the load itself, slings, shackles, spreader beams, hook block and any other lifting gear below the boom point.

Related: Rated capacity, Net load
Net load

The mass of the actual object being lifted, excluding all lifting gear, hook block and attachments, used to check capacity after deductions are made.

Related: Gross load, Rigging deduction
Working radius

The horizontal distance from the crane's centre of rotation to the centre line of the load, measured at the boom tip and used to read capacity from the load chart.

Related: Load chart, Rated capacity
Load moment indicator

An electronic system that measures boom angle, length, pressure and other inputs to display rated capacity, actual load and percentage of capacity, and warns or limits when overload occurs.

Related: Rated capacity, Anti-two-block device
Anti-two-block device

A safety device that detects when the hook block approaches the boom tip and stops the hoist or boom motion to prevent the rope from being pulled through the sheave.

Related: Load moment indicator, Limit switch
Boom configuration

The arrangement of the crane's boom, such as main boom, luffing jib, fixed jib or heavy lift attachment, which changes the capacity and geometry shown on the load chart.

Related: Load chart, Superlift
Superlift

An auxiliary counterweight system mounted on a separate trailing or suspended tray that increases the crane's capacity by counteracting boom loads, and which must be set up per the manufacturer's instructions.

Related: Counterweight, Boom configuration
Counterweight

Mass added to the rear of the crane's upper structure to balance the load moment; it must match the configuration in the load chart and be correctly installed and secured.

Related: Superlift, Load chart
Sling angle factor

A multiplier applied to a sling's capacity to account for the angle between the sling leg and the horizontal, reducing capacity as the angle becomes shallower.

Related: Sling tension, Centre of gravity
Sling tension

The force carried by each sling leg in a lifting assembly, which increases as the included angle between legs increases and must be checked against the sling's rated capacity.

Related: Sling angle factor, Working load limit
Working load limit

The maximum mass or force that a sling, shackle, hook or other item of lifting gear is rated to withstand in a specified configuration, marked by the manufacturer.

Related: Sling tension, Proof load
Centre of gravity

The point at which the mass of an object is considered to act; the hook must be positioned above it to keep the load level and stable during the lift.

Related: Load stability, Sling tension
Load stability

The condition in which a lifted load remains level, does not rotate or swing uncontrollably and is secured against shifting, achieved through correct slinging and tag lines.

Related: Centre of gravity, Tag line
Tag line

A rope attached to a load and controlled by a person outside the drop zone to restrain rotation and guide the load without the person touching it directly.

Related: Load stability, Exclusion zone
Ground bearing pressure

The pressure exerted through the crane's outrigger pads or tracks onto the supporting surface, which must be shown by calculation to be within the ground's capacity.

Related: Outrigger pad, Geotechnical assessment
Outrigger pad

A load-spreading plate placed under an outrigger float to distribute force over a larger area and reduce ground bearing pressure to an acceptable level.

Related: Ground bearing pressure, Outrigger float
Outrigger float

The pad or float attached to the outrigger beam that contacts the supporting surface or the spreader mat, transferring the crane's load into the ground.

Related: Outrigger pad, Ground bearing pressure
Geotechnical assessment

An engineering evaluation of the soil, fill, buried services or structure under a crane's supports to confirm it can carry the imposed loads without settlement or collapse.

Related: Ground bearing pressure, Outrigger pad
Lift plan

A documented plan for a specific lift that records the load, crane configuration, capacity calculations, rigging, ground conditions, personnel, communications and contingency measures.

Related: Critical lift, Safe work method statement
Critical lift

A lift that requires a higher level of planning and control because of its size, complexity, load value, proximity to hazards or the consequences of failure, often requiring engineering sign-off.

Related: Lift plan, Tandem lift
Tandem lift

A lift using two or more cranes to handle a single load, requiring a detailed plan that defines load sharing, crane positions, communication and the effect of load transfer.

Related: Critical lift, Load share
Load share

The proportion of a suspended load carried by each crane or sling leg in a multi-point lift, which must be calculated and monitored because it changes as the load moves.

Related: Tandem lift, Sling tension
Spotter

A competent person positioned to observe a hazard area, such as near powerlines or blind zones, and to warn the operator or signal the need to stop.

Related: Bystander control, Exclusion zone
Hand signals

A standardised set of arm and hand movements used by a dogger to direct the crane operator when radio communication is unavailable or unreliable.

Related: Dogger, Radio communication
Dogger

A licensed rigger who directs the crane operator by radio or hand signals and is responsible for the safe slinging and movement of the load.

Related: Hand signals, Radio communication
Radio communication

The primary method of coordinating a lift, using agreed channels, call signs and clear phrases between the operator, dogger and other crew, with a tested backup arrangement.

Related: Dogger, Hand signals
Pre-start briefing

A short meeting before work begins in which the crew reviews the lift plan, hazards, roles, signals and emergency arrangements and confirms understanding.

Related: Job safety analysis, Lift plan
Pre-operational inspection

The checks an operator performs at the start of each shift, covering fluids, tyres, ropes, hooks, safety devices, alarms and controls, with defects recorded and reported.

Related: Defect reporting, Logbook
Defect reporting

The formal process of recording a fault found on the crane or lifting gear, tagging it out of service where required, and notifying the responsible person so it can be repaired.

Related: Pre-operational inspection, Out-of-service tag
Out-of-service tag

A tag attached to defective equipment to show it must not be used until the fault is repaired and the tag is removed by an authorised person.

Related: Defect reporting, Logbook
Logbook

The crane's record of inspections, maintenance, repairs, configurations and operational hours, used to verify its condition and service history.

Related: Pre-operational inspection, Major inspection
Major inspection

A thorough periodic examination of the crane's structural and mechanical components, required at intervals set by the manufacturer or regulator, to detect fatigue and wear.

Related: Logbook, Defect reporting
Emergency lowering

A controlled procedure, often using an auxiliary power source or manual pump, to bring a suspended load or boom down safely after a power or hydraulic failure.

Related: Emergency procedure, Load hold
Emergency procedure

A documented set of actions for events such as fire, power failure, structural damage, load loss or injury, including alarm signals, evacuation and notification of authorities.

Related: Emergency lowering, Incident response
Incident response

The immediate actions taken after an accident or near miss, including making the area safe, first aid, preserving the scene and reporting to the regulator as required.

Related: Emergency procedure, Notifiable incident
Notifiable incident

A serious event, such as a death, serious injury or dangerous occurrence, that the business must report to the work health and safety regulator immediately.

Related: Incident response, Emergency procedure
Shutdown procedure

The sequence used at the end of a shift or job to land and secure the load, retract and pin the boom, park the crane safely and isolate power before leaving.

Related: Park-up position, Pre-operational inspection
Park-up position

The specified configuration in which a crane is left when not in use, with the boom lowered or stowed, brakes applied, outriggers retracted or pinned and the machine secured against movement.

Related: Shutdown procedure, Outrigger float