High Risk Work Licence - Slewing Mobile Crane C6 (60t) study materials
High Risk Work Licence - Slewing Mobile Crane C6 (60t) study resources

High Risk Work Licence - Slewing Mobile Crane C6 (60t) study plan

High Risk Work Licence - Slewing Mobile Crane C6 (60t) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Crane types, configurations and load charts & Rigging, slinging and load estimation

  • Identify and explain the capacity-derating factors on a slewing mobile crane load chart, including radius, boom length, counterweight, outrigger configuration, and slew angle.

  • Calculate net capacity for at least 10 different load-chart scenarios by subtracting all rigging and lifting gear weight from gross capacity.

  • Determine the centre of gravity and estimated mass for five common loads using dimensional and material-density calculations.

  • Select and inspect slings and rigging hardware for given load weights, including the effect of sling angle on tension.

  • State the safety factors and inspection criteria for wire rope slings, synthetic slings, and shackles according to relevant standards.

Your checkpoint

Completed load-chart worksheet with 10 worked capacity calculations and a rigging plan for three loads, including sling-angle tension calculations and gear weight deductions.

Week 2

Crane types, configurations and load charts & Site set-up, ground conditions and outrigger/stabiliser use

  • Interpret crane manufacturer's operating manual sections on outrigger spread, ground bearing pressure, and stability for the specific crane model.

  • Calculate ground bearing pressure for a given outrigger load and compare it to the bearing capacity of common site materials (concrete, asphalt, compacted gravel, clay).

  • Design a mat/cribbing solution for a scenario with soft ground, specifying mat dimensions, material, and placement.

  • Set up a crane on a simulated site plan, marking outrigger positions, exclusion zones, and level tolerances.

  • Explain the procedure for verifying ground conditions and the consequences of inadequate support.

Your checkpoint

A site set-up plan for a hypothetical lift, including ground bearing pressure calculations, mat selection, outrigger positioning diagram, and a written justification of the setup.

Week 3

Planning and performing lifts, including multi-crane and complex lifts & Hazard identification, risk assessment and control

  • Develop a lift plan for a complex lift using a recognised planning template, incorporating hazard identification, risk assessment, and control measures.

  • Perform a risk assessment for a multi-crane lift, identifying load-sharing, communication, and coordination hazards.

  • Determine the required crane capacity and configuration for a lift that involves a blind spot and limited access.

  • Sequence the steps of a lift from pre-lift checks to load landing, including contingency actions for power failure or sudden wind.

  • Explain the roles and responsibilities of personnel involved in a multi-crane lift, including the lift director and signal persons.

Your checkpoint

A complete lift plan for a complex or multi-crane lift, including risk assessment, crane positioning, rigging diagram, step-by-step procedure, and contingency plans.

Week 4

Legislative, duty-of-care and standards framework & Pre-operational inspection, maintenance and defect reporting

  • Summarise the key legal duties of a crane operator under the relevant work health and safety legislation and standards, including duty of care, hazard reporting, and licensing requirements.

  • List the pre-operational inspection items for a slewing mobile crane and explain the criteria for passing or failing each item.

  • Describe the defect reporting process, including how to record and escalate defects that affect safe operation.

  • Differentiate between routine maintenance tasks that an operator may perform and those requiring a qualified technician.

  • Explain the consequences of operating a crane with a known defect under legislation and site rules.

Your checkpoint

A completed pre-operational inspection checklist for a specific crane model, with a written scenario response describing the actions to take upon discovering a critical defect.

Week 5

Communication, signals and personnel coordination & Powerline, exclusion zone and environmental hazards

  • Demonstrate the standard hand and whistle signals for slewing mobile crane operations, including emergency stop.

  • Explain the requirements for maintaining communication between the operator, dogger, and signal person, including radio protocols and failure modes.

  • Identify powerline hazards on a site plan and calculate the minimum safe approach distances for various voltage levels.

  • Develop a control strategy for working near powerlines, including the use of spotter, insulation, and de-energisation.

  • Describe environmental hazards such as wind, lightning, and poor visibility, and state the operational limits for each.

Your checkpoint

A communication and powerline safety plan for a site, including a signals quick-reference sheet, radio communication protocol, and a powerline exclusion zone diagram with calculated distances.

Week 6

Planning and performing lifts, including multi-crane and complex lifts & Rigging, slinging and load estimation

  • Plan a tandem lift of an asymmetrical load, calculating load share and selecting rigging to maintain balance.

  • Perform a load estimation for a complex shape by breaking it into simpler components and using density tables.

  • Select and configure lifting gear for a lift that requires a spreader beam or equalising slings, and verify the safe working load of each component.

  • Explain the effect of shock loading and how to avoid it during a lift.

  • Describe the procedure for lifting personnel if permitted, including the additional hazards and controls.

Your checkpoint

A detailed rigging study for a tandem lift of an asymmetrical load, including load-share calculations, rigging diagram, and a step-by-step lifting procedure with hold points.

Week 7

Shutdown, securing, transport and emergency procedures & Hazard identification, risk assessment and control

  • Outline the shutdown and securing procedure for a slewing mobile crane at the end of a shift, including boom positioning, lockout, and isolation.

  • Describe the emergency procedures for a crane incident, such as loss of load, power failure, or fire, and the operator's immediate actions.

  • Explain the transport preparation for a slewing mobile crane, including dismantling, loading, and securing for road transport.

  • Conduct a mock incident investigation to identify root causes and corrective actions.

  • Review and update a risk assessment based on a near-miss scenario.

Your checkpoint

A shutdown and emergency response checklist for a crane, plus a written incident report for a simulated near-miss, including root cause analysis and recommended controls.

Week 8

Legislative, duty-of-care and standards framework & Hazard identification, risk assessment and control & Crane types, configurations and load charts & Rigging, slinging and load estimation & Site set-up, ground conditions and outrigger/stabiliser use & Pre-operational inspection, maintenance and defect reporting & Planning and performing lifts, including multi-crane and complex lifts & Communication, signals and personnel coordination & Powerline, exclusion zone and environmental hazards & Shutdown, securing, transport and emergency procedures

  • Complete a full-length practice exam under timed conditions, covering all domains.

  • Review incorrect answers and create a personal summary sheet of key formulas, standards, and procedures.

  • Perform a self-assessment against the licensing requirements and identify any remaining knowledge gaps.

  • Revisit load-chart calculations and rigging estimations to ensure accuracy and speed.

  • Finalise a quick-reference guide for on-the-job use, summarising critical safety and operational points.

Your checkpoint

A scored practice exam with a reflection log detailing areas for improvement and a one-page quick-reference guide covering essential formulas, signals, and procedures.

Milestones

Week 2: Successfully calculate net capacity and ground bearing pressure for three given scenarios with 100% accuracy, and explain the derating factors without reference.

Week 4: Complete a pre-operational inspection checklist and correctly identify at least 90% of defects in a simulated inspection, and state the legal reporting requirements.

Week 6: Demonstrate correct hand signals and radio communication in a role-play scenario, and calculate powerline safe approach distances for three voltage levels.

Week 8: Achieve a score of at least 85% on the practice exam, with no critical errors in load-chart calculations or safety procedures.