High Risk Work Licence - Derrick Crane (CD): Derrick crane types, components, configuration and stability principles

High Risk Work Licence - Derrick Crane (CD) · Work through your exam, one topic at a time.

All guide sections

Derrick crane types, components, configuration and stability principles

Types and configuration

Derrick cranes are lifting machines built around a mast (or A-frame) held by guys anchored to the ground or structure, with a boom luffed by a topping lift and the load hoisted on the main fall. Common configurations include the Chicago boom (mast strapped to an existing structure), the gin pole (single pole with guys), the stiff-leg derrick (two rigid legs plus guys), and the guy derrick (mast held only by guys). Know the components: mast, boom, mast cap, foot bearings, guy ropes and turnbuckles, anchors, topping lift, load line, sheaves, and the winch or hoist unit.

Stability principles

Unlike a mobile crane, a derrick has no counterweight and no outriggers - its stability comes from the geometry of the guys and the anchorage. The resultant of load and guy tensions must stay within the anchorage design. As the boom luffs down and radius increases, load moment rises and guy tensions change; as the boom swings, load transfers between guys. A slack guy allows the mast to move and can shock-load the remaining guys.

Traps

Questions often confuse the topping lift (holds the boom) with the load line (holds the load) - swapping them is a fatal error. Another trap is assuming the derrick can be re-configured without engineering review: changing guy angles, anchor positions or boom length alters the load chart.

Rule of thumb

If any guy is slack, kinked, or shows broken wires, stop - treat the crane as out of service until it is corrected by a competent person.