High Risk Work Licence - Derrick Crane (CD) study materials
High Risk Work Licence - Derrick Crane (CD) study resources

High Risk Work Licence - Derrick Crane (CD) study plan

High Risk Work Licence - Derrick Crane (CD) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Derrick crane types, components, configuration and stability principles & Site preparation, foundations, ballast, guys and anchorages

  • Sketch and label the main derrick crane configurations (guy derrick, stiff-leg, shear-leg) showing mast, boom, guys, winches and anchor points, and state one site situation suited to each

  • Explain in writing how load radius, boom angle and mast height interact to change capacity, using at least three worked numeric examples

  • Describe the stability triangle or tipping-line concept for a guyed derrick and list the four factors that most reduce stability on a soft or sloped pad

  • Identify the load-bearing elements of a foundation or ballast arrangement and explain why ballast mass and anchor capacity are verified before erection

Your checkpoint

A one-page annotated diagram set plus a 300-word written explanation of stability factors, self-marked against the study notes

Week 2

Derrick crane types, components, configuration and stability principles & Site preparation, foundations, ballast, guys and anchorages & Derrick crane operation, load charts and safe working limits

  • Calculate working load limits from a supplied load chart for at least eight radius and configuration combinations, including two near the chart boundary

  • Explain how guy tension, anchor spacing and ground bearing pressure are checked before a derrick is erected on a prepared pad

  • List the pre-erection checks for anchorages, ballast, foundations and drainage, and state the consequence of each being missed

  • Describe the effect of wind, out-of-level ground and side loading on a derrick's rated capacity and stability

Your checkpoint

A completed ten-question load chart and foundation calculation worksheet with all workings shown and errors corrected

Week 3

Derrick crane operation, load charts and safe working limits & Load estimation, slinging, rigging and lifting gear selection

  • Apply the load chart method step by step to plan four lifts, recording configuration, radius, capacity, actual load and percentage of capacity used

  • Estimate the mass of three common loads (steel section, concrete panel, fabricated frame) using dimensions and density, and compare estimates with marked masses

  • Select slings, shackles and lifting points for those loads, stating the sling angle effect and the derating applied

  • Identify the centre of gravity of an asymmetric load and describe how to rig it to avoid tilt or load shift

Your checkpoint

Four written lift plans, each with a rigging sketch, mass estimate, capacity check and rejection or acceptance decision

Week 4

Hazard identification, risk assessment and control in crane operations & Pre-operational inspection, testing and maintenance checks

  • Carry out a structured hazard identification for two derrick scenarios and rank the findings using a documented risk matrix

  • Select and justify controls using the hierarchy of controls, showing at least one substitution or engineering control per significant hazard

  • Produce a pre-operational inspection checklist covering structure, wire ropes, sheaves, winches, brakes, limit devices, guys, anchors and earthworks

  • Explain the purpose and frequency of proof load testing, periodic inspection and routine maintenance, and who may certify each

Your checkpoint

A completed risk assessment and pre-operational inspection checklist for one simulated derrick site, with hazards ranked and controls assigned

Week 5

Work health and safety legislation, duty of care and licence obligations & Communication, signal systems and teamwork with doggers and riggers

  • Summarise the duty-of-care obligations of the person conducting a business or undertaking, the crane operator, the dogger and the rigger, and where responsibilities overlap

  • State the licence, competency and record-keeping obligations that apply to derrick crane operation and high risk work in your jurisdiction

  • Demonstrate the standard hand and whistle signals for raise, lower, slew, stop and emergency stop, and explain what to do when a signal is unclear

  • Describe the communication chain for a blind lift, including radio protocol, nominated signal person and stop-work triggers

Your checkpoint

A signal card set and a 200-word script for a blind lift briefing that names each role and its stop-work authority

Week 6

Derrick crane operation, load charts and safe working limits & Load estimation, slinging, rigging and lifting gear selection & Hazard identification, risk assessment and control in crane operations

  • Plan and rehearse three lifts of increasing complexity, documenting the hazard controls, rigging and capacity check for each

  • Identify the unsafe conditions that require a lift to be stopped and state the corrective action for each

  • Explain shock loading, snatch loading and the effect of rapid slewing or hoisting on wire rope and structure

  • Review two worked incident case studies and identify which control failed at each stage of the lift

Your checkpoint

Three complete lift plans with a stop-work decision log showing at least six go or no-go judgements

Week 7

Emergency procedures, incident response and shutdown & Dismantling, transport, storage and post-operational documentation

  • Write and walk through an emergency procedure covering power failure, brake failure, load hang-up, structural alarm, fire and adverse weather

  • Describe the shutdown sequence after an incident, including securing the load, isolating energy and preserving the scene

  • Sequence the dismantling of a derrick crane from load removal through guy release, boom lowering, mast removal and anchor recovery

  • List the transport, storage and post-operational documentation requirements, including inspection records, logbook entries and defect reporting

Your checkpoint

A one-page emergency response flowchart plus a dismantling sequence checklist with documentation sign-off points

Week 8

Work health and safety legislation, duty of care and licence obligations & Hazard identification, risk assessment and control in crane operations & Derrick crane types, components, configuration and stability principles & Site preparation, foundations, ballast, guys and anchorages & Pre-operational inspection, testing and maintenance checks & Load estimation, slinging, rigging and lifting gear selection & Derrick crane operation, load charts and safe working limits & Communication, signal systems and teamwork with doggers and riggers & Emergency procedures, incident response and shutdown & Dismantling, transport, storage and post-operational documentation

  • Complete two full-length practice exams under timed conditions and score each against the answer key

  • Review every incorrect answer, identify the underlying knowledge gap and write a corrected explanation for each

  • Recite from memory the key formulas, derating rules, inspection intervals and signal meanings that recur across domains

  • Confirm readiness by listing any remaining weak domain and the specific action to close it before the assessment

Your checkpoint

Two scored practice exams with a written error log and a final one-page revision sheet of formulas, intervals and signals

Milestones

Week 2: Score at least 80% on the load chart and foundation worksheet, with correct workings shown for every answer

Week 4: Produce a risk assessment and inspection checklist that covers all major hazard groups and names a control and responsible person for each

Week 6: Complete three lift plans unaided, each with a correct capacity check and at least two documented go or no-go decisions

Week 8: Score at least 85% on both timed practice exams and show a closed error log with no repeated mistakes