High Risk Work Licence - Tower Crane (CT) study materials
High Risk Work Licence - Tower Crane (CT) study resources

High Risk Work Licence - Tower Crane (CT) study plan

High Risk Work Licence - Tower Crane (CT) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Tower crane types, major components, structural principles and stability & Legislative and regulatory requirements, duty of care and licensing obligations

  • Label the major structural and mechanical components of a tower crane (mast, slew ring, jib, counter-jib, trolley, hoist, counterweights) and state the function of each

  • Explain the load path from hook to foundation and describe how counterweight, radius and load interact to produce overturning moment

  • Summarise the licence, duty-of-care and record-keeping obligations that apply to a tower crane operator under the relevant WHS legislation

  • Distinguish the roles of operator, dogger, rigger and crane supervisor in a lift plan

Your checkpoint

A one-page annotated component diagram plus a 250-word written summary of operator licensing and duty-of-care obligations, self-marked against the source notes

Week 2

Tower crane types, major components, structural principles and stability & Hazard identification, risk assessment and control for tower crane operations

  • Calculate overturning moments for three worked examples and predict which configuration is least stable

  • Identify the stability hazards created by wind, eccentric loads, incorrect counterweighting and out-of-service slewing

  • Apply the hierarchy of risk control to five tower crane hazards and justify the chosen controls

  • Describe how a hazard register entry is written for a crane-related task

Your checkpoint

A completed risk assessment table covering five tower crane hazards with hazard, initial risk, control measure and residual risk columns

Week 3

Hazard identification, risk assessment and control for tower crane operations & Pre-operational inspection, function checks and fault reporting

  • Sequence a pre-operational inspection from approach and isolation checks through to structural, rope, limit and safety device checks

  • Explain the purpose and test method for moment limiting, hoist limiting, slew limiting and anemometer devices

  • Write a fault report that states the defect, its location, the immediate action taken and the person notified

  • Decide when a defect requires the crane to be taken out of service rather than derated or monitored

Your checkpoint

A written pre-start inspection checklist of at least 20 items, each with an accept/reject criterion and a sample fault report

Week 4

Site preparation, crane siting, foundation and erection/dismantling interfaces & Environmental and site conditions, including wind, powerlines and ground conditions

  • Explain how bearing pressure, foundation design and crane siting decisions affect stability

  • Describe the interface between the crane erector, the site controller and the operator during erection, climbing and dismantling

  • Identify minimum clearance distances and control measures for cranes working near overhead powerlines

  • Describe how wind speed, ground bearing and slope change the safe operating envelope

Your checkpoint

A site siting and environmental constraints brief of 400 words covering foundation, powerline and wind controls, plus a 15-question self-test scored at 80% or better

Week 5

Load estimation, slinging, lifting gear selection and load charts

  • Estimate load mass from dimensions and material density for five items including a bundle and a fabricated assembly

  • Select slings, shackles and lifting gear by working load limit and state the derating applied for sling angle and configuration

  • Read a load chart to determine capacity at a given radius, boom/jib configuration and reeving, and apply the deduction for gear mass

  • Explain why the load chart radius, not the measured distance, governs capacity and identify the chart limits for the task

Your checkpoint

A lift study for three loads showing mass estimate, sling selection with derating, chart capacity at the working radius and calculated utilisation percentage

Week 6

Load estimation, slinging, lifting gear selection and load charts & Slewing, travelling, trolleying and precision load placement

  • Perform ten load chart capacity calculations under time pressure with no arithmetic errors

  • Plan a lift sequence that minimises slewing, trolleying and hoisting travel while keeping the load within the chart envelope

  • Describe control inputs for smooth slewing, trolleying and hoisting, and explain how to control load swing and final placement

  • Explain the effect of shock loading, side loading and rapid deceleration on rope, structure and stability

Your checkpoint

A timed 20-question load chart and precision placement worksheet, completed at 85% or better, with a written lift sequence plan for a blind placement

Week 7

Communication, signalling, teamwork and exclusion zone management & Slewing, travelling, trolleying and precision load placement

  • Demonstrate standard hand and whistle signals and describe radio protocol including call signs, repeat-back and stop-the-job authority

  • Design an exclusion zone and pedestrian control arrangement for a lift over a live access route

  • Explain teamwork responsibilities during a blind lift and how the operator confirms the dogger's position

  • Describe how to maintain precision placement accuracy when the load is out of the operator's direct sight

Your checkpoint

A communication and exclusion zone plan for one lift, including signal method, radio call sequence, zone dimensions and a self-recorded signal demonstration checklist

Week 8

Shutdown, securing, emergency procedures and incident response & Environmental and site conditions, including wind, powerlines and ground conditions & Legislative and regulatory requirements, duty of care and licensing obligations

  • Sequence the shutdown and securing procedure for end of shift, including leaving the crane in the specified out-of-service condition

  • Explain emergency procedures for power failure, fire, structural alarm, uncontrolled load and imminent severe weather

  • Describe incident notification, scene preservation and evidence recording obligations after a near miss or incident

  • Complete a full-length practice exam and review every incorrect answer to identify the underlying knowledge gap

Your checkpoint

A full-length timed practice exam scored at 90% or better, plus a one-page emergency and shutdown quick-reference card written from memory

Milestones

Week 2: Can explain overturning moment and counterweight interaction and score 80% or better on a 15-question stability and component self-test

Week 4: Can produce a complete pre-start inspection checklist and a siting brief unaided, and score 80% or better on the mixed domain 2, 4, 5 and 9 self-test

Week 6: Completes ten load chart calculations within 20 minutes at 85% or better accuracy, correctly applying sling derating and gear mass deduction

Week 8: Scores 90% or better on a full-length timed practice exam covering all ten domains, with no domain below 75%