Dogging (DG) flashcards
Dogging (DG) · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Dogging HRW licence
- In Australia, a high-risk work licence for dogging (class DG) is required to perform dogging work, or a trainee must work under direct supervision of a licensed dogger.
- Primary duty of care
- Under WHS law, a PCBU must ensure the health and safety of workers and others so far as reasonably practicable, including providing safe systems of work and training.
- SWMS
- A Safe Work Method Statement documents high-risk construction work steps, hazards, and controls; it must be prepared for crane and hoist operations involving loads near people or live lines.
- Hierarchy of control
- The order of risk controls: eliminate, substitute, isolate, engineering, administrative, then PPE; higher-order controls are preferred and PPE is the last resort.
- Lifting gear inspection
- Lifting gear must be inspected before each use and by a competent person at intervals not exceeding 12 months; defective gear is tagged out of service and not used.
- Exclusion zone
- A barricaded area beneath and around a lift path where no person may stand or walk; it prevents injury from a falling load or rigging failure.
- Grade 80 chain
- A high-strength alloy chain grade used for lifting slings; its working load limit depends on chain size and configuration and is stated on the sling tag.
- Wire rope termination efficiency
- A hand-spliced eye is about 90% efficient, a pressed ferrule about 90–100%, and a wire rope clip about 80% of the rope's breaking strength.
- Safety shackle
- A shackle with a bolt or nut pin that cannot rotate loose under load or vibration; preferred over a screw-pin shackle for permanent or vibrating lifts.
- Hook safety latch
- A spring-loaded device that closes the hook throat to prevent slings or attachments from slipping off; it must be functional unless the hook design prevents disengagement.
- Eyebolt angular loading
- Only forged eyebolts designed for angular loading may be used at angles; standard eyebolts are for vertical lifts only, and threads must be fully engaged.
- Sling edge protection
- Softeners or protectors placed between a sling and a sharp or abrasive load edge to prevent cutting, abrasion, or damage that reduces sling strength.
- Spreader beam
- A lifting beam used to keep sling legs vertical or to support a long load at two points, reducing inward forces and preventing load damage; its WLL must be verified.
- Load weight formula
- Weight = volume × density; for example, steel is about 7,850 kg/m³, concrete about 2,400 kg/m³, and water about 1,000 kg/m³.
- Two-leg sling tension
- For equal legs at angle θ from horizontal, tension per leg T = (W / 2) / sin θ, where W is the load weight.
- Four-leg sling assumption
- Unless the load is rigid and geometry guarantees equal sharing, assume only two legs share the load; calculate tension as for a two-leg sling.
- Sling angle factor
- The multiplier 1 / sin θ applied to load weight to find tension; values are 1.000 at 90°, 1.155 at 60°, 1.414 at 45°, and 2.000 at 30°.
- Centre of gravity
- The point where the load's weight acts; it must be directly below the hook and within the attachment points, or tension increases in the legs nearer the COG.
- Unequal leg tension
- For two legs at angles θ₁ and θ₂ from horizontal, horizontal components balance (T₁ cos θ₁ = T₂ cos θ₂) and vertical components sum to W.
- Crane capacity check
- The crane's rated capacity at the working radius must exceed the total load, including rigging weight and any dynamic or wind factors.
- Designated signaler
- The single competent person authorized to give signals to the crane operator at a time; the dogger may act as signaler if competent and designated.
- Stop hand signal
- Arm extended forward, palm down, held stationary; the operator must stop the crane immediately when this signal is given.
- Emergency stop signal
- Both arms extended forward with palms down, or a long whistle blast; any person may give it and the operator must obey immediately.
- Radio communication protocol
- Use an agreed channel and call signs, test before the lift, and if communication is lost the operator stops and holds the load safely until contact resumes.
- Line of sight
- The dogger must maintain a clear view of the operator; if line of sight is lost, a relay signaler or radio communication must be used.
- Pre-lift briefing
- A meeting before a complex lift to confirm load weight, rigging, crane capacity, path, signaler, and emergency procedures among all personnel.
- Ground bearing pressure
- The pressure exerted by crane outriggers on the ground; soft or sloping ground requires mats or cribbing, and the crane must be level.
- Wind limit
- The maximum wind speed at which a lift may proceed, set by the crane manufacturer; loads with large sail area are more affected and may require a lower limit.
- Lift path control
- The planned route for a load, kept free of obstructions and personnel; the load travels as low as practicable and never over people.
- Trial lift
- Lifting the load a few centimetres and holding to check balance, rigging, and stability before committing to the full lift.
- Tag line use
- A rope attached to a load to control rotation and swing; it must not be wrapped around hands or body parts, and the handler stays clear of the load path.
- Vertical lift rule
- Loads must be lifted vertically; side pulling or dragging can overload rigging, destabilize the crane, and cause load loss.