Dogging (DG) study plan
Dogging (DG) · Give each week a clear focus.
8 weeks · About 7 hours per week
Safety, Legislation, and Standards
Map each clause of the core rigging and lifting standards to a one-line plain-language summary in your own words
Classify 20 employer and regulatory duties into employer, competent person, and dogger responsibility columns
List the legal triggers that stop a lift and rehearse stating them aloud from memory
Define the terms competent person and qualified person in your own words and note where they differ
Your checkpoint
A one-page standards and duties reference sheet you wrote from memory, checked against source notes
Safety, Legislation, and Standards & Rigging and Lifting Equipment
Identify inspection intervals and rejection criteria for slings, shackles, hooks, and hardware
Rank 15 common equipment defects by severity and write the removal-from-service action for each
Trace the load path through a shackle, sling, and hook assembly and label every connection point
Write the pre-use inspection checklist you will use for the rest of the plan
Your checkpoint
A completed equipment inspection checklist plus a scored 20-item defect-identification quiz at 85 percent or better
Rigging and Lifting Equipment & Load Estimation and Sling Tension Calculations
Read capacity markings and derating factors for vertical, choker, and basket configurations
Compute working load limits for 10 tag-and-capacity scenarios using the applicable efficiency factors
Calculate sling tension for symmetric two-leg and four-leg bridles at three included angles
Explain why tension rises as the horizontal angle shrinks and back it with your own numbers
Your checkpoint
A worked calculation set of 12 tension and capacity problems with steps shown and a self-graded answer key
Lift Planning and Risk Assessment & Load Estimation and Sling Tension Calculations
Draft a lift plan for a two-leg bridle lift that includes load weight, center of gravity, rigging, and exclusion zone
Estimate the weight of three loads from dimensions and material density, then compare against known values
Build a risk assessment with hazards, likelihood, severity, and controls for each identified risk
Identify the point where your calculated tension margin falls below a safe threshold and revise the rigging
Your checkpoint
A complete written lift plan and risk assessment for one realistic load, scored against a self-made rubric
Communication and Signaling & Dogging Operations and Load Control
Demonstrate the standard hand signals for hoist, lower, stop, and emergency stop without prompts
Script the voice commands and confirmations for a blind lift and rehearse them with a partner
Describe tag line placement and control for three load shapes and state the dogger's role in each
Practice load control during start, travel, and set-down and note the correction points
Your checkpoint
A recorded or observed signal drill covering at least 12 signals with zero errors
Dogging Operations and Load Control & Rigging and Lifting Equipment
Sequence a full lift from pre-lift briefing through set-down and load release
Diagnose five failure scenarios such as load shift, sling contact damage, and off-center pick points
Select rigging hardware for three loads and justify each choice against capacity and configuration
Write the go or no-go decision criteria you will apply before every lift
Your checkpoint
A written lift sequence procedure with a failure-response table for five scenarios
Lift Planning and Risk Assessment & Dogging Operations and Load Control
Run a full simulated lift end to end using your plan, signals, and calculations
Time each phase and identify where your sequence slows or creates risk
Revise the lift plan based on at least three findings from the simulation
Cross-check your calculations against an independent method or a second reviewer
Your checkpoint
A revised lift plan with a logged list of findings and the changes you made
Safety, Legislation, and Standards & Rigging and Lifting Equipment & Load Estimation and Sling Tension Calculations & Communication and Signaling & Lift Planning and Risk Assessment & Dogging Operations and Load Control
Complete a timed 60-question mixed practice exam across all domains
Review every missed item and write the underlying rule or calculation you got wrong
Re-drill weak areas until two consecutive practice sets score 85 percent or better
Summarize the ten facts you are most likely to forget on one review card
Your checkpoint
A timed practice exam score of 85 percent or better with a written error log
Milestones
Week 2: Score 85 percent or better on the 20-item equipment defect quiz and pass a self-inspection of your checklist
Week 4: Complete the lift plan and risk assessment with every calculation shown and independently rechecked
Week 6: Perform all 12 hand signals correctly from memory and finish the failure-response table
Week 8: Score 85 percent or better on the timed 60-question mixed exam with a completed error log