Advanced Rigging (RA) key terms
Advanced Rigging (RA) · Get comfortable with the vocabulary.
- Center of Gravity (CG)
- Related: Load Moment, Sling Tension
The single point where the entire weight of an object is considered to act; for a uniform object it sits at the geometric center, and for irregular loads it must be located by calculation or test lift.
- Load Moment
- Related: Center of Gravity (CG), Load Chart
The turning effect of a load, calculated by multiplying its weight by the horizontal distance from the pivot or tipping line to its center of gravity; used to check stability and crane capacity.
- Sling Tension
- Related: Sling Angle, Tension Factor
The force carried by each sling leg, found by dividing the share of load taken by that leg by the cosine of its angle from vertical; steeper legs carry less tension.
- Sling Angle
- Related: Sling Tension, Tension Factor
The angle measured between a sling leg and the horizontal load surface; as this angle decreases, tension in the leg rises sharply, so shallow angles are avoided.
- Tension Factor
- Related: Sling Angle, Sling Tension
A multiplier applied to load weight to estimate sling-leg tension for a given angle; for example, a 60-degree leg uses about 1.155 and a 45-degree leg uses about 1.414.
- Working Load Limit (WLL)
- Related: Design Factor, Proof Load
The maximum mass or force a rigging component is authorized to support in a specific service, established by the manufacturer and reduced by any applicable derating factors.
- Design Factor
- Related: Working Load Limit (WLL), Proof Load
The ratio of a component's breaking strength to its working load limit; it provides a margin of safety against wear, dynamic forces, and unexpected loading conditions.
- Proof Load
- Related: Working Load Limit (WLL), Design Factor
A test load applied to a component, usually greater than its working load limit but below yield, to verify strength and detect defects before the item is placed in service.
- Shackle
- Related: Lifting Eye, Master Link
A U-shaped connector with a pin or bolt used to join slings to lifting eyes, hooks, or other hardware; it must be loaded along its axis and never side-loaded.
- Master Link
- Related: Shackle, Sling Leg
A large forged ring or link at the top of a multi-leg sling assembly that gathers the legs and provides a single attachment point for the crane hook.
- Sling Leg
- Related: Master Link, Sling Tension
One branch of a multi-leg sling assembly running from the master link or hook down to the load connection; its tension depends on share of load and angle.
- Spreader Beam
- Related: Sling Angle, Lifting Beam
A below-the-hook device that holds sling legs apart at a fixed distance so they stay more vertical, reducing horizontal compression on the load and lowering leg tension.
- Lifting Beam
- Related: Spreader Beam, Below-the-Hook Device
A below-the-hook device designed to carry bending and shear loads between attachment points, typically rated for a stated capacity and often used to clear obstructions above the load.
- Below-the-Hook Device
- Related: Lifting Beam, Spreader Beam
Any lifting attachment that connects the crane hook to the load, such as a spreader beam, lifting beam, clamp, or vacuum lifter, and that requires its own rated capacity.
- Load Chart
- Related: Load Moment, Rated Capacity
A manufacturer-supplied table or graph giving the maximum allowable load for a crane at specified radii, boom lengths, and configurations; it governs every lift.
- Rated Capacity
- Related: Load Chart, Working Load Limit (WLL)
The maximum load a crane or hoist may handle under stated conditions, as published by the manufacturer after deductions for attachments and configuration-specific limits.
- Standard Hand Signals
- Related: Qualified Signalperson, Tag Line
A defined set of arm and hand movements used to direct crane operators when voice or radio contact is unreliable; only one designated signalperson should transmit them.
- Qualified Signalperson
- Related: Standard Hand Signals, Tag Line
A person who has been trained and evaluated as competent to direct crane movements using standard signals, and who understands crane dynamics, rigging, and emergency stop procedures.
- Tag Line
- Related: Standard Hand Signals, Load Path
A rope attached to a load to control rotation and sway from a safe distance, keeping riggers clear of the load path while the crane moves the load.
- Load Path
- Related: Tag Line, Critical Lift
The route a load travels during a lift and the zone beneath and around it; keeping personnel outside this area is the primary defense against struck-by injuries.
- Wire Rope Lay
- Related: Wire Rope Strand, Rotation-Resistant Rope
The pattern in which strands are twisted around the core, described as regular or lang, and in a direction such as right or left; lay affects handling, abrasion resistance, and rotation.
- Wire Rope Strand
- Related: Wire Rope Lay, Rotation-Resistant Rope
A group of wires helically twisted together to form one of the outer members of a wire rope; strand count and wire arrangement determine flexibility and strength.
- Rotation-Resistant Rope
- Related: Wire Rope Lay, Wire Rope Strand
A wire rope built with opposing lays or special strand designs that resist twisting under load, reducing load spin and the risk of kinking during single-line lifts.
- Synthetic Sling
- Related: Sling Protection, Shock Loading
A lifting sling made from high-strength synthetic fibers such as nylon or polyester, available as web, round, or rope types, and sensitive to cuts, heat, and chemical attack.
- Sling Protection
- Related: Synthetic Sling, Wire Rope Strand
Padding, softeners, or edge guards placed between a sling and sharp or abrasive load surfaces to prevent cutting, abrasion, and strength loss during a lift.
- Hydraulic Gantry
- Related: Jacking Tower, Skidding
A self-propelled or track-mounted lifting system using hydraulic rams and a controlled header beam to raise and travel heavy loads at low height in constrained spaces.
- Jacking Tower
- Related: Hydraulic Gantry, Cribbing
A temporary vertical support structure of stacked cribbing or steel sections used with hydraulic jacks to raise a load in controlled increments while blocking is inserted.
- Cribbing
- Related: Jacking Tower, Skidding
Layered timber or manufactured blocks placed under a raised load to hold it at height; cribbing must be stable, level, and sized for the load it supports.
- Skidding
- Related: Roller Skid, Cribbing
Moving a load horizontally across a surface on rollers, skid shoes, or a lubricated track, using controlled pushing or pulling rather than lifting.
- Roller Skid
- Related: Skidding, Hydraulic Gantry
A system of steel rollers or tank rollers placed under a load to reduce friction during horizontal movement; rollers must be sized, aligned, and monitored for crushing hazards.
- Critical Lift
- Related: Lift Plan, Load Path
A lift that exceeds routine criteria, such as high value, unusual configuration, multiple cranes, or personnel beneath the load, and therefore requires a written engineered plan and added review.
- Lift Plan
- Related: Critical Lift, Rated Capacity
A documented description of a lift covering load weight and center of gravity, rigging arrangement, crane capacity, personnel roles, hazard controls, and contingency steps.
- Shock Loading
- Related: Synthetic Sling, Design Factor
A sudden application or release of force that produces dynamic stresses far above static load, often caused by jerking, snatching, or rapid load release.
- Removal-from-Service Criteria
- Related: Periodic Inspection, Wire Rope Strand
Published limits that define when a sling, rope, or hardware item must be taken out of use, such as broken wires, cuts, excessive wear, or deformation.
- Periodic Inspection
- Related: Removal-from-Service Criteria, Proof Load
A scheduled examination of rigging and lifting equipment performed at defined intervals by a designated person, with results recorded and defective items tagged out.
- Competent Person
- Related: Qualified Signalperson, Periodic Inspection
A person capable of identifying existing and predictable hazards and who has authority to take prompt corrective action to eliminate them, as defined by safety regulations.
- Exclusion Zone
- Related: Load Path, Critical Lift
A marked area around a lift or crane operation where unauthorized personnel are prohibited, established to protect workers from falling loads, swing, and pinch points.
- Two-Blocking
- Related: Load Chart, Rated Capacity
A dangerous condition in which the load block is drawn up against the boom tip, causing rope damage and potential failure; limit switches and operator awareness prevent it.