Rigging Safety and Load Calculations

  • Working load limit (WLL) = minimum breaking strength (MBS) divided by the design factor; slings commonly use a 5:1 factor, wire rope slings often 5:1, and rigging hardware typically 4:1 to 5:1.

  • Sling tension for a two-leg bridle: tension per leg = (load weight x half the load) / (vertical height of the bridle), or load / (2 x cos of the angle from vertical).

  • Tension increases as the horizontal angle from vertical increases: at 30 degrees from vertical tension = 0.577W per leg, at 45 degrees = 0.707W, at 60 degrees = 1.0W, at 75 degrees = 1.93W.

  • The load angle factor (multiplier applied to share of load) is 1.000 at 90 degrees from horizontal, 1.155 at 60 degrees, 1.414 at 45 degrees, and 2.000 at 30 degrees.

  • Center of gravity: an object lifts level only when the hook is directly above the CG; an off-center CG shifts load between legs in proportion to horizontal distance from the CG.

  • Total load on a lifting beam or spreader includes the payload plus the beam's own weight plus hardware; the beam must be rated for the resultant forces at its attachment points.

  • Shock loading from rapid acceleration or sudden stops can multiply static tension several times; avoid jerking and keep hoist acceleration smooth.

  • Personnel must never stand or pass under a suspended load; the exclusion zone radius should exceed the potential swing or fall radius of the load and rigging.

  • Environmental limits: wind acting on large sail-area loads adds horizontal force and reduces effective capacity; stop lifts when wind exceeds the lift plan or manufacturer limit.

Quick reference

Sling Selection, Inspection, and Use

  • Chain sling grades: Grade 80 and Grade 100 are standard alloy grades; never use proof coil, transport, or other non-alloy chain for overhead lifting.

  • Wire rope sling inspection rejects: broken wires exceeding removal criteria, kinks, bird-caging, crushed or severely corroded sections, and damaged or cracked fittings.

  • Synthetic web sling capacity drops with hitch type: vertical rated capacity, choker about 80 percent, basket about 200 percent, and bridle per manufacturer; capacity also derates for wider angles.

  • Web sling rejection: holes, snags, burns or charring, ultraviolet degradation, red core yarn exposed (indicating damage beyond the cover), and missing or illegible tags.

  • Sling angle affects capacity: a multiple-leg sling's rated capacity applies only at the stated angle; steeper angles from horizontal reduce allowable load per leg.

  • Protect slings from sharp edges with softeners or corner protectors; protect synthetic slings from heat, chemicals, and sunlight, and wire rope from tight bend radius.

  • Never tie knots in a sling or use a sling with a knot; knots reduce strength drastically and are cause for removal.

  • Inspect slings before each use and at intervals required by the employer; remove damaged slings from service immediately and destroy or tag them out.

  • Shock loading, sustained tension, and repeated bending fatigue shorten sling life; keep records of periodic inspections for wire rope and chain slings.

Quick reference

Rigging Hardware and Attachments

  • Shackle WLL is based on the pin or bow diameter and the marked rating; screw-pin shackles must be fully seated, and the pin must not be replaced with a bolt of unknown strength.

  • Never side-load a shackle or hook beyond its rated design; shackle capacity applies to the centerline of the bow and pin.

  • Hooks must have a working safety latch; a hook with a spread or distorted throat, cracks, or excessive wear is removed from service.

  • Master links and master rings must be rated alloy; the assembly WLL is limited by the weakest component, not the strongest.

  • Eyebolts: shoulder eyebolts are rated for angular loading within limits; plain (non-shouldered) eyebolts are for vertical lifts only unless designed otherwise.

  • Turnbuckles, swivels, and links used in lifting must be marked with a rating and intended for overhead lifting; hardware not marked is not assumed rated.

  • Wire rope clips: use the correct number and spacing for the rope diameter, with the U-bolt on the dead end (never saddle a dead horse), and retorque after initial loading.

  • Rigging hardware must be proof-tested and marked; remove hardware with cracks, bends, deep nicks, or thread damage, and never weld or heat-treat rated hardware.

Quick reference

Crane Load Charts and Lift Planning

  • Load chart capacity is the gross load at a given radius and boom configuration; net capacity = chart capacity minus the weight of all lifting attachments below the boom tip.

  • Radius is measured from the center of rotation to the center of the load, not to the boom tip; swinging or booming out increases radius and reduces capacity.

  • Deductions typically include hook block, slings, spreader beams, and any attached rigging; the payload must fit within the remaining net capacity.

  • Crane configuration matters: boom length, boom angle, jib stowed or erected, outrigger extension, counterweight, and track or tire condition all change the chart.

  • On rubber-tired cranes, capacity depends on whether the chart is for stationary pick-and-carry, and capacities are lower when traveling with a load.

  • Ground bearing pressure must be checked: outrigger float load = total weight plus load, distributed to floats; use mats or cribbing to spread pressure on soft soil.

  • A lift plan documents load weight, rigging, crane position, radius, chart used, ground conditions, power line clearance, and the path of the load.

  • Critical lifts (near capacity, multiple cranes, personnel nearby, or unusual configuration) require engineered planning and often a pre-lift meeting.

Quick reference

Lift Execution, Communication, and Signaling

  • Only one designated signal person directs the crane operator; anyone may give a stop signal, which must always be obeyed.

  • Standard hand signals: raise and lower by rotating the forearm with index finger extended; stop is an open palm held stationary; emergency stop is both arms extended palms out.

  • Before the lift, verify the load weight, rigging, hook latch, tag lines, exclusion zone, and communication method; test-lift slightly to confirm balance and rigging.

  • Tag lines control rotation and swing; they must be long enough to keep personnel clear of the load, and workers must not wrap tag lines around hands or body.

  • The operator must stop when signal communication is lost, when the load is out of view without a signal person, or when a safety concern arises.

  • Riggers keep hands and feet clear of pinch points, never place body parts under the load, and push rather than pull a swinging load.

  • Set-down: lower slowly, land the load, confirm stable support and blocking before releasing tension, then unhook and clear the area.

  • Power line safety: maintain the required minimum clearance, use a spotter, and treat any contact as energized; keep the crane and load away from overhead lines.