Duty of care

The legal obligation of a person conducting business or undertaking, and of workers, to take all reasonably practicable steps to protect the health and safety of themselves and others affected by the work.

Related: Reasonably practicable, Person conducting a business or undertaking (PCBU)
Person conducting a business or undertaking (PCBU)

The legal entity, such as an employer or operator of a container terminal, that holds the primary work health and safety duties for the site and the equipment used there.

Related: Duty of care, Safe work method statement (SWMS)
Reasonably practicable

The test used to decide what safety measures are required, weighing the likelihood and severity of harm against the cost, effort and availability of ways to eliminate or reduce the risk.

Related: Duty of care, Hierarchy of control
High risk work licence

A formal national licence that authorises a person to operate specified plant such as a reach stacker, issued after training, assessment and competency verification, and subject to renewal and conditions.

Related: Competency assessment, Verification of competency (VOC)
Safe work method statement (SWMS)

A written document that sets out the high risk work activities to be carried out, the hazards involved, the control measures to be applied and how those controls will be implemented, monitored and reviewed.

Related: Risk assessment, Hierarchy of control
Hierarchy of control

The ranked order of risk control measures, from eliminating the hazard through substitution, engineering controls, administrative controls and finally personal protective equipment as the least effective option.

Related: Risk assessment, Reasonably practicable
Risk assessment

A structured process of identifying hazards, evaluating the likelihood and consequence of harm, and deciding which controls are needed to reduce risk to an acceptable level before work proceeds.

Related: Hierarchy of control, Safe work method statement (SWMS)
Hazard

Any thing, situation or source of potential harm that could cause injury, illness, damage to equipment or property, or environmental harm during reach stacker operations.

Related: Risk assessment, Exclusion zone
Exclusion zone

A marked or barricaded area around the reach stacker and its load where unauthorised people are not permitted, sized to cover the machine's travel path, slewing tail swing and any dropped-load risk.

Related: Pedestrian separation, Spotter
Pedestrian separation

The planning and physical measures, such as walkways, barriers, signage and traffic rules, used to keep people apart from moving reach stackers and the loads they carry.

Related: Exclusion zone, Spotter
Spotter

A designated person who guides the operator with agreed signals or radio contact during blind lifts, tight manoeuvres or reversing, and who stays in the operator's view or maintains communication.

Related: Standard hand signals, Two-way radio communication
Standard hand signals

A documented set of arm and hand movements, such as raise, lower, stop and travel, used to direct the machine so the operator and signal person share one agreed meaning.

Related: Spotter, Two-way radio communication
Two-way radio communication

A dedicated radio channel used between operator, spotter and control room, with clear protocols for identifying speakers, acknowledging instructions and confirming that a message was received.

Related: Spotter, Standard hand signals
Load chart

A manufacturer-supplied table or diagram that states the maximum permitted load at each boom length, boom angle and radius, including the effect of attachments and outrigger configuration.

Related: Rated capacity, Load moment indicator (LMI)
Rated capacity

The maximum mass the reach stacker may handle at a given configuration, as stated on the load chart, reduced for attachments, spreader type, container size and any site-specific limitation.

Related: Load chart, Load moment indicator (LMI)
Load moment indicator (LMI)

An onboard system that continuously measures boom angle, length and load, then warns or restricts operation when the machine approaches or exceeds its rated capacity for the current configuration.

Related: Load chart, Rated capacity
Stability triangle

The triangular footprint formed by the machine's three support points, being the front axle and the two rear wheels, within which the centre of gravity must stay to avoid tipping.

Related: Centre of gravity, Counterweight
Centre of gravity

The point at which the machine's total weight is considered to act; it shifts when the boom is extended or a load is lifted, and tipping occurs if it moves outside the stability base.

Related: Stability triangle, Counterweight
Counterweight

Heavy mass fitted at the rear of the reach stacker to offset the forward load moment of the boom and container, improving stability and keeping the centre of gravity within safe limits.

Related: Stability triangle, Load moment indicator (LMI)
Spreader

The telescopic attachment that locks onto the corner castings of a container, with twistlocks that engage and release to allow the container to be lifted and placed.

Related: Twistlock, Corner casting
Twistlock

A rotating locking pin in the spreader that engages the corner casting of a container; it must be fully engaged before lifting and fully released before the spreader is withdrawn.

Related: Spreader, Corner casting
Corner casting

The steel block at each corner of a container, bored to accept twistlocks and used to bear and transfer the container's load during lifting, stacking and securing.

Related: Twistlock, Spreader
Intermodal container

A standardised steel freight container with fixed corner castings, built to common length and height ratings so it can be stacked, lifted and transported across road, rail and sea.

Related: Corner casting, Stacking plan
Stacking plan

A layout showing which container goes in which bay, row and tier, its weight and destination, used to keep stacks stable and to control the order of retrieval.

Related: Tier, Weight distribution
Tier

A vertical level in a container stack, counted upward from the ground or from the base container, used in stacking plans to describe where a container is placed.

Related: Stacking plan, Weight distribution
Weight distribution

The arrangement of container masses within a stack and across the machine, kept low and evenly spread so that no container, stack or axle is overloaded and stability is maintained.

Related: Stacking plan, Rated capacity
Ground bearing pressure

The load per unit area that the reach stacker transmits through its wheels or outriggers to the surface, which must be within what the pavement, slab or hardstand can support.

Related: Outrigger, Ground conditions assessment
Ground conditions assessment

An inspection of the operating surface for strength, level, slope, drainage, voids, soft spots and obstructions before work starts, so the machine is not operated where it could settle or tip.

Related: Ground bearing pressure, Outrigger
Outrigger

A hydraulically extended leg with a pad that widens the machine's support base and transfers load to the ground, used only when fully deployed on suitable bearing material.

Related: Ground bearing pressure, Stability triangle
Pre-start inspection

The systematic check of fluid levels, tyres, brakes, steering, hydraulics, spreader, lights, alarms and safety devices carried out before the reach stacker is used each shift.

Related: Defect report, Maintenance schedule
Defect report

A written record of any fault or damage found on the machine, describing the problem, its location, the date and the reporter, and triggering isolation, tagging or repair before further use.

Related: Pre-start inspection, Out-of-service tag
Out-of-service tag

A visible tag attached to a machine or control indicating it must not be operated because of a defect or maintenance activity, removed only by an authorised person after repair and check.

Related: Defect report, Lock-out tag-out
Lock-out tag-out

A procedure for isolating energy sources, such as the battery, hydraulics or engine, and fitting locks and tags so the machine cannot be started or moved during maintenance or repair.

Related: Out-of-service tag, Maintenance schedule
Maintenance schedule

The manufacturer's planned intervals for servicing, lubrication and inspection of the reach stacker, which must be followed and recorded to keep the machine safe and within warranty.

Related: Pre-start inspection, Defect report
Emergency lowering procedure

The documented method for safely lowering a raised boom and load, or releasing a person, when hydraulic power or controls fail, using manual valves or backup systems.

Related: Emergency shutdown, Incident report
Emergency shutdown

The immediate stopping of the engine and hydraulic functions using the emergency stop control when a person or property is at risk, followed by isolating the machine and securing the area.

Related: Emergency lowering procedure, Incident report
Incident report

A formal record completed after any accident, near miss, dropped load or damage event, capturing what happened, who was involved, the conditions and the immediate actions taken.

Related: Emergency shutdown, Defect report
Parking and securing

The end-of-shift procedure of lowering the boom and spreader to rest, applying the parking brake, neutralising controls, removing the key and chocking wheels as required on slopes.

Related: Post-operational check, Pre-start inspection
Post-operational check

The inspection carried out at the end of a shift or task to confirm the machine is undamaged, correctly parked, refuelled and ready for the next operator.

Related: Parking and securing, Defect report
Diesel exhaust emissions

Gases and particulates produced by the engine that pose health risks in enclosed or poorly ventilated areas, controlled by ventilation, servicing and limiting idle running.

Related: Refuelling procedure, Spill containment
Refuelling procedure

The controlled steps for refuelling, including engine shutdown, no ignition sources, bonding, drip trays and spill kit readiness, to prevent fire and environmental contamination.

Related: Spill containment, Diesel exhaust emissions
Spill containment

The use of bunds, drip trays, absorbent materials and a spill kit to capture leaked fuel, hydraulic oil or coolant so it does not reach soil, drains or waterways.

Related: Refuelling procedure, Diesel exhaust emissions