High Risk Work Licence - Reach Stacker (RS) study materials
High Risk Work Licence - Reach Stacker (RS) study resources

High Risk Work Licence - Reach Stacker (RS) study plan

High Risk Work Licence - Reach Stacker (RS) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Reach stacker components, stability and load charts & Legislation, standards and duty of care for reach stacker operations

  • Label every major reach stacker component on a blank diagram from memory (boom, spreader, twistlocks, outriggers, counterweight, tyres, ROPS/FOPS, load moment indicator)

  • Explain how the load moment/stability system works and state the three factors that most reduce capacity (boom extension, boom angle/height, load centre)

  • Read a sample load chart and calculate the safe working load for four different boom/extension combinations

  • Summarise the duty-of-care obligations of the operator, the PCBU and the person directing the work under WHS legislation

  • List the licence, competency and high-risk work documentation requirements that apply before operating

Your checkpoint

A one-page load chart worksheet with four worked SWL calculations plus a component-labelling diagram scored at 90% or better

Week 2

Reach stacker components, stability and load charts & Load handling, stacking and container/attachment selection

  • Match spreader/attachment type (fixed, telescopic, twin-lift, piggyback) to at least six container handling scenarios

  • Demonstrate the correct twistlock engagement and disengagement sequence and state the checks before lifting

  • Describe how to verify a container is empty/full, correctly oriented and within the rated load before lifting

  • Explain stacking rules: tier limits, wind loading, weight distribution and no-go stack configurations

  • Calculate total load including attachment weight and compare against the chart for three given jobs

Your checkpoint

A written scenario set of six lift jobs, each with the chosen attachment, calculated load, and justification, all correct

Week 3

Hazard identification, risk assessment and control & Pre-operational inspection, maintenance and defect reporting

  • Complete a written risk assessment for a container yard task using the hierarchy of controls

  • Identify at least 15 hazards from a described yard layout and assign a control to each

  • Perform a pre-start inspection checklist in the correct sequence and record three simulated defects

  • Classify defects as minor/major/critical and state the correct reporting and tagging-out action for each

  • Describe the maintenance responsibilities of the operator versus the maintenance team

Your checkpoint

A completed risk assessment plus a filled pre-start inspection form with three defects correctly classified and actioned

Week 4

Site planning, ground conditions and operating area set-up & Communication, signals, spotting and pedestrian/vehicle separation

  • Assess ground conditions (bearing capacity, slope, drainage, underground services) for three described sites and state accept/reject decisions

  • Lay out a safe operating area including exclusion zones, pedestrian walkways, traffic flow and stacking lanes

  • Explain the standard hand and radio signals used for reach stacker operations and the rules for an authorised spotter

  • Describe the blind spots of a reach stacker and the controls that manage them

  • Outline separation rules between pedestrians, light vehicles and heavy lifting equipment

Your checkpoint

A scaled site plan drawing showing traffic flow, exclusion zones, pedestrian routes and stacking positions, with a written justification

Week 5

Load handling, stacking and container/attachment selection & Emergency procedures, incident response and shutdown

  • Walk through the correct lift sequence for a full container from approach to placement and release

  • Explain the response to a load shift, a dropped container and a hydraulic failure during a lift

  • State the emergency procedures for fire, fuel spill, tip-over and injury, including isolation and evacuation steps

  • Describe when and how to use the emergency lowering and shutdown systems

  • Explain incident notification and preservation-of-scene obligations

Your checkpoint

A written emergency response matrix covering five emergency scenarios with the correct sequence of actions for each

Week 6

Legislation, standards and duty of care for reach stacker operations & Hazard identification, risk assessment and control & Pre-operational inspection, maintenance and defect reporting

  • Answer 40 mixed practice questions across legislation, risk control and inspection, scoring at least 85%

  • Re-study every missed question and write the correct reasoning for each

  • Explain how consultation, reporting and record-keeping obligations apply to daily operations

  • Review and refine your pre-start checklist against the manufacturer and site requirements

Your checkpoint

A practice test result sheet with a score of 85% or higher and written corrections for every wrong answer

Week 7

Shutdown, securing, parking and post-operational checks & Environmental and fuel/handling safety considerations

  • Perform the full shutdown and parking sequence: boom stowed, spreader lowered, park brake, isolation, chocks, keys secured

  • Describe post-operational checks and how to record and hand over defects at end of shift

  • Explain fuel handling, refuelling controls, spill containment and battery/hydraulic fluid environmental controls

  • State the environmental controls for dust, noise, exhaust emissions and waste in a container yard

Your checkpoint

A written shutdown and post-operational checklist plus a one-page environmental controls summary

Week 8

Legislation, standards and duty of care for reach stacker operations & Hazard identification, risk assessment and control & Reach stacker components, stability and load charts & Pre-operational inspection, maintenance and defect reporting & Site planning, ground conditions and operating area set-up & Load handling, stacking and container/attachment selection & Communication, signals, spotting and pedestrian/vehicle separation & Emergency procedures, incident response and shutdown & Shutdown, securing, parking and post-operational checks & Environmental and fuel/handling safety considerations

  • Complete two full-length timed practice exams under exam conditions

  • Score at least 90% on both attempts

  • Revisit the two weakest domains and rewrite your summary notes for them

  • Recite the ten key safety rules and load chart fundamentals from memory

Your checkpoint

Two completed timed practice exams with scores of 90% or higher and a final one-page revision sheet

Milestones

Week 2: Can read a load chart and calculate a safe working load for any given configuration without notes

Week 4: Can complete a risk assessment and site layout plan unaided, scoring 80% or better on a peer/self check

Week 6: Scoring 85% or higher on the mixed practice test across legislation, risk and inspection

Week 8: Two timed practice exams at 90% or higher with all weak areas corrected