You are a licensed electrician supervising a first-year apprentice on a commercial fit-out. The task is to add a circuit to a live distribution board in a tenancy that cannot be shut down during trading hours. The apprentice has been asked by the site foreman to 'just pull the cover off and find a spare way' while you are at the van collecting test equipment. The board has exposed busbars and the tenancy is busy with staff.

1. What are the work health and safety issues, and what should you do on returning to the board?

Read the worked answer

The situation breaches several duties:

  • Live work without justification - working near exposed live busbars is high-risk. Live work should only occur where it is unavoidable and after a risk assessment and controls.
  • Supervision failure - a first-year apprentice must not work unsupervised on or near live equipment. The foreman's instruction does not override your supervisory duty.
  • Isolation not established - no lockout/tagout, no proving dead, no identified isolation point.
  • Public and staff exposure - an open live board in a busy tenancy exposes others to arc and shock hazards.

On returning: stop the work immediately, secure the board, and remove the apprentice from the area. Establish a proper isolation with the tenant's agreement, or schedule the work outside trading hours. Report the incident through the site's safety process and brief the foreman that live work instructions must come through the licensed supervisor.

2. How would you structure the task so it can be done safely and still meet the tenant's trading constraint?

Read the worked answer

Plan around the constraint rather than working live:

  1. Negotiate a shutdown window - most tenancies can accept a short planned outage if given notice; propose an early-morning or after-close slot.
  2. Prepare everything in advance - confirm the spare way, cable route, materials and test equipment before the outage so the work is quick.
  3. Isolate and prove dead - identify the isolation point, lock and tag, test for dead at the point of work, and prove the tester on a known source.
  4. Define roles - you perform or directly supervise all work in the board; the apprentice may assist with non-live tasks such as cable running and labelling under direct supervision.
  5. Test and restore - insulation resistance, polarity, loop impedance, RCD tests, then re-energise and verify.
  6. Debrief - record the isolation, the work and the test results, and reinforce the supervision expectations with the apprentice.

This meets the tenant's need without exposing anyone to live busbars.