NSW Electrical Licence · Keep the key ideas within reach.

Quick reference

Electrical Principles and Theory

  • Ohm's law: V = I × R; power P = V × I = I²R = V²/R, with V in volts, I in amperes, R in ohms, P in watts.

  • AC sine wave: RMS value = peak ÷ √2 (≈0.707 × peak); average value of a full sine wave is zero.

  • Impedance Z = √(R² + X²), where X is reactance in ohms; X_L = 2πfL and X_C = 1/(2πfC).

  • Three-phase power: P = √3 × V_L × I_L × cos φ for a balanced load, with V_L the line-to-line voltage.

  • Star connection: V_L = √3 × V_phase and I_L = I_phase; delta connection: V_L = V_phase and I_L = √3 × I_phase.

  • Conductor resistance R = ρL/A, so resistance rises with length and resistivity and falls as cross-sectional area increases.

  • Power factor = true power (W) ÷ apparent power (VA); a lagging power factor indicates an inductive load.

  • Series circuit: current is common, voltages add, R_total = R1 + R2 + …; parallel circuit: voltage is common, currents add.

Quick reference

Wiring Systems and Installation Practices

  • Cable current-carrying capacity must be derated for ambient temperature, grouping, thermal insulation and installation method before comparing with load current.

  • Voltage drop limit for consumer mains and final subcircuits is conventionally 5% of nominal supply voltage from the point of supply.

  • Sheath colours: orange identifies circular cable, white identifies flat TPS; conductor colours are brown (active), blue (neutral), green/yellow (earth).

  • Cables in accessible roof spaces must be kept clear of walkways, fixed securely and protected where subject to mechanical damage.

  • Socket outlets in domestic premises require additional protection by a 30 mA RCD under AS/NZS 3000 requirements.

  • Minimum bending radius and support spacing are set by the cable manufacturer and AS/NZS 3000; supports are required at regular intervals.

  • Segregation: telecommunications and data cabling must be separated from low-voltage mains wiring by the prescribed clearance to limit induction.

Quick reference

Electrical Protection and Earthing

  • Earth fault loop impedance Z_s = Z_external + Z_active + Z_protective earth; the measured value must allow the protective device to trip within the required time.

  • Maximum disconnection times under AS/NZS 3000: 0.4 s for final subcircuits up to 63 A, 5 s for distribution circuits and fixed equipment above 63 A.

  • An RCD with 30 mA rated residual current is required for socket outlets, lighting circuits in domestic installations and other prescribed circuits.

  • MEN system: the neutral is earthed at the point of supply and the protective earth is bonded to the neutral bar at the main switchboard.

  • Main earthing conductor size is determined by the active conductor cross-section per AS/NZS 3000 Table 5.1, not simply by load current.

  • Equipotential bonding connects metallic water, gas and structural services to the main earthing terminal to limit touch voltage.

  • Circuit breakers provide overload and short-circuit protection; RCDs provide additional protection against earth leakage and electric shock.

Quick reference

Electrical Equipment and Appliances

  • Equipment must be marked with its rated voltage, current or power, and be suitable for the supply and environment of installation.

  • Ingress protection code IPXY: first digit is protection against solids (0–6), second digit is protection against water (0–8).

  • Appliances supplied with a flexible cord must be connected via a plug and socket outlet or a fixed connection with a cord anchorage.

  • Class I equipment relies on basic insulation plus a protective earth; Class II equipment uses double or reinforced insulation and no earth.

  • Switchboards require a main switch, protective devices, a main earth bar and a neutral bar, with a legible diagram or schedule.

  • Motor circuits require overload protection, short-circuit protection and, where required, isolation and emergency stopping arrangements.

  • Socket outlets, switches and accessories must be installed so that live parts are not accessible and operation is not obstructed.

Quick reference

Testing, Verification and Fault Finding

  • Verification sequence: visual inspection first, then continuity of protective earthing, insulation resistance, polarity, earth fault loop impedance and RCD operation.

  • Insulation resistance test at 500 V DC must give at least 1 MΩ for the installation, with sensitive equipment disconnected.

  • Continuity of the protective earthing conductor is confirmed by a low-resistance measurement from the main earth bar to each outlet earth.

  • Polarity testing confirms active and neutral are not reversed and that switches are in the active conductor.

  • RCD trip time test: the device must operate within 300 ms at rated residual current and must not trip at half rated residual current.

  • Earth fault loop impedance is measured at the farthest point of each circuit and compared with the maximum value for the protective device.

  • Live testing requires a voltage indicator proved before and after use on a known source, and fault finding follows a logical divide-and-test approach.

Quick reference

Work Health and Safety Obligations

  • PCBUs must eliminate or minimise risks so far as is reasonably practicable, using the hierarchy of control from elimination to PPE.

  • De-energise, isolate, lock out and tag out before work; prove the circuit dead with a tested voltage indicator and test again after the work.

  • A safety observer is required for live work, and live work is only permitted where it is essential and the risk is controlled.

  • Personal protective equipment is the last line of defence: insulated gloves, safety glasses, arc-rated clothing and insulated tools.

  • Any electrical incident or near miss must be reported to the supervisor and recorded; notifiable incidents must be reported to the regulator.

  • Working at heights requires fall prevention, a stable ladder or platform, and exclusion zones below the work area.

  • Residual current devices, test-before-touch procedures and warning signs are administrative and engineering controls for electrical risk.

Quick reference

Regulatory Framework and Licensing Requirements

  • Electrical work in NSW must be carried out by or under the supervision of a licensed electrician, and the licence must be held by the individual.

  • A Certificate of Compliance for Electrical Work (CCEW) must be issued for prescribed electrical work and a copy given to the person for whom the work is done.

  • The CCEW must be sent to the network operator or regulator within the prescribed period, and records retained for the required period.

  • Only a licensed electrician may connect electrical installation work to the supply; the network operator authorises the connection.

  • Licence classes in NSW include electrician, qualified supervisor and contractor; a contractor licence is required to contract for electrical work.

  • AS/NZS 3000 (Wiring Rules) is the primary standard, supported by AS/NZS 3017 for verification and AS/NZS 4836 for safe work on low-voltage installations.

  • Continuing professional development and licence renewal are required; working outside the scope of the licence is an offence.

Quick reference

Electrical Principles and Theory

  • Ohm's law: V = I × R; power P = V × I = I²R = V²/R, with V in volts, I in amperes, R in ohms, P in watts.

  • AC sine wave: RMS value = peak ÷ √2 (≈0.707 × peak); average value of a full sine wave is zero.

  • Impedance Z = √(R² + X²), where X is reactance in ohms; X_L = 2πfL and X_C = 1/(2πfC).

  • Three-phase power: P = √3 × V_L × I_L × cos φ for a balanced load, with V_L the line-to-line voltage.

  • Star connection: V_L = √3 × V_phase and I_L = I_phase; delta connection: V_L = V_phase and I_L = √3 × I_phase.

  • Conductor resistance R = ρL/A, so resistance rises with length and resistivity and falls as cross-sectional area increases.

  • Power factor = true power (W) ÷ apparent power (VA); a lagging power factor indicates an inductive load.

  • Series circuit: current is common, voltages add, R_total = R1 + R2 + …; parallel circuit: voltage is common, currents add.

Quick reference

Wiring Systems and Installation Practices

  • Cable current-carrying capacity must be derated for ambient temperature, grouping, thermal insulation and installation method before comparing with load current.

  • Voltage drop limit for consumer mains and final subcircuits is conventionally 5% of nominal supply voltage from the point of supply.

  • Sheath colours: orange identifies circular cable, white identifies flat TPS; conductor colours are brown (active), blue (neutral), green/yellow (earth).

  • Cables in accessible roof spaces must be kept clear of walkways, fixed securely and protected where subject to mechanical damage.

  • Socket outlets in domestic premises require additional protection by a 30 mA RCD under AS/NZS 3000 requirements.

  • Minimum bending radius and support spacing are set by the cable manufacturer and AS/NZS 3000; supports are required at regular intervals.

  • Segregation: telecommunications and data cabling must be separated from low-voltage mains wiring by the prescribed clearance to limit induction.

Quick reference

Electrical Protection and Earthing

  • Earth fault loop impedance Z_s = Z_external + Z_active + Z_protective earth; the measured value must allow the protective device to trip within the required time.

  • Maximum disconnection times under AS/NZS 3000: 0.4 s for final subcircuits up to 63 A, 5 s for distribution circuits and fixed equipment above 63 A.

  • An RCD with 30 mA rated residual current is required for socket outlets, lighting circuits in domestic installations and other prescribed circuits.

  • MEN system: the neutral is earthed at the point of supply and the protective earth is bonded to the neutral bar at the main switchboard.

  • Main earthing conductor size is determined by the active conductor cross-section per AS/NZS 3000 Table 5.1, not simply by load current.

  • Equipotential bonding connects metallic water, gas and structural services to the main earthing terminal to limit touch voltage.

  • Circuit breakers provide overload and short-circuit protection; RCDs provide additional protection against earth leakage and electric shock.

Quick reference

Electrical Equipment and Appliances

  • Equipment must be marked with its rated voltage, current or power, and be suitable for the supply and environment of installation.

  • Ingress protection code IPXY: first digit is protection against solids (0–6), second digit is protection against water (0–8).

  • Appliances supplied with a flexible cord must be connected via a plug and socket outlet or a fixed connection with a cord anchorage.

  • Class I equipment relies on basic insulation plus a protective earth; Class II equipment uses double or reinforced insulation and no earth.

  • Switchboards require a main switch, protective devices, a main earth bar and a neutral bar, with a legible diagram or schedule.

  • Motor circuits require overload protection, short-circuit protection and, where required, isolation and emergency stopping arrangements.

  • Socket outlets, switches and accessories must be installed so that live parts are not accessible and operation is not obstructed.

Quick reference

Testing, Verification and Fault Finding

  • Verification sequence: visual inspection first, then continuity of protective earthing, insulation resistance, polarity, earth fault loop impedance and RCD operation.

  • Insulation resistance test at 500 V DC must give at least 1 MΩ for the installation, with sensitive equipment disconnected.

  • Continuity of the protective earthing conductor is confirmed by a low-resistance measurement from the main earth bar to each outlet earth.

  • Polarity testing confirms active and neutral are not reversed and that switches are in the active conductor.

  • RCD trip time test: the device must operate within 300 ms at rated residual current and must not trip at half rated residual current.

  • Earth fault loop impedance is measured at the farthest point of each circuit and compared with the maximum value for the protective device.

  • Live testing requires a voltage indicator proved before and after use on a known source, and fault finding follows a logical divide-and-test approach.

Quick reference

Work Health and Safety Obligations

  • PCBUs must eliminate or minimise risks so far as is reasonably practicable, using the hierarchy of control from elimination to PPE.

  • De-energise, isolate, lock out and tag out before work; prove the circuit dead with a tested voltage indicator and test again after the work.

  • A safety observer is required for live work, and live work is only permitted where it is essential and the risk is controlled.

  • Personal protective equipment is the last line of defence: insulated gloves, safety glasses, arc-rated clothing and insulated tools.

  • Any electrical incident or near miss must be reported to the supervisor and recorded; notifiable incidents must be reported to the regulator.

  • Working at heights requires fall prevention, a stable ladder or platform, and exclusion zones below the work area.

  • Residual current devices, test-before-touch procedures and warning signs are administrative and engineering controls for electrical risk.

Quick reference

Regulatory Framework and Licensing Requirements

  • Electrical work in NSW must be carried out by or under the supervision of a licensed electrician, and the licence must be held by the individual.

  • A Certificate of Compliance for Electrical Work (CCEW) must be issued for prescribed electrical work and a copy given to the person for whom the work is done.

  • The CCEW must be sent to the network operator or regulator within the prescribed period, and records retained for the required period.

  • Only a licensed electrician may connect electrical installation work to the supply; the network operator authorises the connection.

  • Licence classes in NSW include electrician, qualified supervisor and contractor; a contractor licence is required to contract for electrical work.

  • AS/NZS 3000 (Wiring Rules) is the primary standard, supported by AS/NZS 3017 for verification and AS/NZS 4836 for safe work on low-voltage installations.

  • Continuing professional development and licence renewal are required; working outside the scope of the licence is an offence.