Building Act hierarchy
The Act overrides regulations, which override the building code, which overrides referenced standards. A lower instrument cannot contradict a higher one; conflicts are resolved upward.
Practitioner duty of care
A registered practitioner must act with reasonable care and skill, comply with the Act and regulations, and avoid signing off work not personally supervised or inspected.
Conflict of interest rule
A building surveyor must decline an appointment where a financial or personal interest exists in the building work, including designing or building the same project.
Record retention obligation
Inspection records, certificates and determinations must be kept for the period prescribed by regulation; losing them is itself a breach of statutory duty.
Disciplinary grounds
Regulators may act on incompetence, negligence, fraud, or issuing certificates without adequate inspection. Sanctions include suspension, cancellation, and conditions.
When permit required
A building permit is needed before building work begins unless a specific exemption applies, such as minor repairs, maintenance, or certain unroofed structures.
Surveyor independence
The building surveyor is the statutory decision-maker and must be independent of the builder and designer of the same work to avoid conflicted approvals.
Permit application contents
Applications must include plans, specifications, allotment and owner details, builder details, and evidence of planning consent, owner-builder approval, and insurance.
Permit conditions
Conditions may impose inspection stages, staging of work, or documentation. Breaching a permit condition is an offence separate from non-compliant building work.
Permit lapse
A permit lapses if work does not start within the prescribed period, commonly twelve months, or if work is suspended beyond the prescribed period.
Occupancy permit issue
An occupancy permit or certificate of final inspection may only be issued after all mandatory inspections are complete and compliance with the code is verified.
Mandatory inspection stages
Typical stages are footing before pour, slab before pour, frame before cladding, waterproofing before tiling, and final. Each must be physically inspected.
Concealed work rule
Work must not be covered before the mandatory inspection is completed. A desktop sign-off without site attendance does not satisfy the requirement.
Builder notification duty
The builder must notify the surveyor when a prescribed stage is reached; the surveyor must attend within the prescribed timeframe.
Non-compliance direction
When inspection reveals non-compliance, the surveyor issues a written direction. Work cannot proceed past that stage until rectification is verified.
Inspection record contents
Each record must state site, permit number, stage, date, inspector, compliance outcome, and any directions issued, with supporting evidence where marginal.
Successor surveyor file
The surveyor's file must be complete enough for a successor to continue oversight without re-inspecting stages already completed and signed off.
Proof of service
Notices, directions and certificates must be served in the prescribed manner, and proof of service must be retained on the project file.
Rectification close-out
A non-compliance record is closed only by a follow-up inspection record confirming rectification, not by a simple annotation on the original record.
Performance versus deemed-to-satisfy
The code sets performance requirements. Deemed-to-satisfy provisions are one compliance path; alternative solutions need evidence of equivalence.
Stop-work order
An enforcement notice requiring work to halt until specified issues are resolved. Continuing work in breach is an offence and may lead to prosecution.
Building order powers
A building order can require demolition, rectification or completion. If ignored, the regulator may do the work and recover costs from the owner.
Essential safety measures
Fire and life-safety systems must be maintained for the building's life. Maintenance schedules and records are enforceable obligations on owners.
Referenced standards force
Standards incorporated by reference into the building code are enforceable as part of the code, including structural, fire, energy and waterproofing standards.
Domestic insurance trigger
Domestic building insurance typically responds to builder death, disappearance, insolvency, or failure to complete or rectify, subject to policy limits.
Insurance certificate timing
The builder must give the owner a certificate of insurance and policy wording before work starts. Failure to do so is a breach by the builder.
Statutory warranties
Consumer law implies warranties of good workmanship, suitable materials, fitness for purpose, and compliance with law. These survive practical completion.
Defects liability periods
Structural defects carry a longer claim period than non-structural defects. Claims must be lodged within the prescribed period after completion.
Domestic contract requirements
Domestic building contracts must be written, contain prescribed disclosures, and include a cooling-off period where legislation requires one.
Insurance coverage limits
Policies cap the amount payable per dwelling and exclude items such as owner-supplied materials. Owners should check limits before signing the contract.
Dispute resolution sequence
Consumers usually must complain to the builder, then a regulator or dispute body, before litigating. Time limits apply at each stage.
Owner-builder obligations
An owner-builder who sells within the prescribed period must provide insurance cover and disclose the work. Resale obligations attach to the property.