BPC/VBA Building Inspector Exam flashcards
BPC/VBA Building Inspector Exam · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Building Act hierarchy
- The Act overrides regulations, which override the building code, which overrides referenced standards. A lower instrument cannot contradict a higher one; conflicts are resolved upward.
- Practitioner duty of care
- A registered practitioner must act with reasonable care and skill, comply with the Act and regulations, and avoid signing off work not personally supervised or inspected.
- Conflict of interest rule
- A building surveyor must decline an appointment where a financial or personal interest exists in the building work, including designing or building the same project.
- Record retention obligation
- Inspection records, certificates and determinations must be kept for the period prescribed by regulation; losing them is itself a breach of statutory duty.
- Disciplinary grounds
- Regulators may act on incompetence, negligence, fraud, or issuing certificates without adequate inspection. Sanctions include suspension, cancellation, and conditions.
- When permit required
- A building permit is needed before building work begins unless a specific exemption applies, such as minor repairs, maintenance, or certain unroofed structures.
- Surveyor independence
- The building surveyor is the statutory decision-maker and must be independent of the builder and designer of the same work to avoid conflicted approvals.
- Permit application contents
- Applications must include plans, specifications, allotment and owner details, builder details, and evidence of planning consent, owner-builder approval, and insurance.
- Permit conditions
- Conditions may impose inspection stages, staging of work, or documentation. Breaching a permit condition is an offence separate from non-compliant building work.
- Permit lapse
- A permit lapses if work does not start within the prescribed period, commonly twelve months, or if work is suspended beyond the prescribed period.
- Occupancy permit issue
- An occupancy permit or certificate of final inspection may only be issued after all mandatory inspections are complete and compliance with the code is verified.
- Mandatory inspection stages
- Typical stages are footing before pour, slab before pour, frame before cladding, waterproofing before tiling, and final. Each must be physically inspected.
- Concealed work rule
- Work must not be covered before the mandatory inspection is completed. A desktop sign-off without site attendance does not satisfy the requirement.
- Builder notification duty
- The builder must notify the surveyor when a prescribed stage is reached; the surveyor must attend within the prescribed timeframe.
- Non-compliance direction
- When inspection reveals non-compliance, the surveyor issues a written direction. Work cannot proceed past that stage until rectification is verified.
- Inspection record contents
- Each record must state site, permit number, stage, date, inspector, compliance outcome, and any directions issued, with supporting evidence where marginal.
- Successor surveyor file
- The surveyor's file must be complete enough for a successor to continue oversight without re-inspecting stages already completed and signed off.
- Proof of service
- Notices, directions and certificates must be served in the prescribed manner, and proof of service must be retained on the project file.
- Rectification close-out
- A non-compliance record is closed only by a follow-up inspection record confirming rectification, not by a simple annotation on the original record.
- Performance versus deemed-to-satisfy
- The code sets performance requirements. Deemed-to-satisfy provisions are one compliance path; alternative solutions need evidence of equivalence.
- Stop-work order
- An enforcement notice requiring work to halt until specified issues are resolved. Continuing work in breach is an offence and may lead to prosecution.
- Building order powers
- A building order can require demolition, rectification or completion. If ignored, the regulator may do the work and recover costs from the owner.
- Essential safety measures
- Fire and life-safety systems must be maintained for the building's life. Maintenance schedules and records are enforceable obligations on owners.
- Referenced standards force
- Standards incorporated by reference into the building code are enforceable as part of the code, including structural, fire, energy and waterproofing standards.
- Domestic insurance trigger
- Domestic building insurance typically responds to builder death, disappearance, insolvency, or failure to complete or rectify, subject to policy limits.
- Insurance certificate timing
- The builder must give the owner a certificate of insurance and policy wording before work starts. Failure to do so is a breach by the builder.
- Statutory warranties
- Consumer law implies warranties of good workmanship, suitable materials, fitness for purpose, and compliance with law. These survive practical completion.
- Defects liability periods
- Structural defects carry a longer claim period than non-structural defects. Claims must be lodged within the prescribed period after completion.
- Domestic contract requirements
- Domestic building contracts must be written, contain prescribed disclosures, and include a cooling-off period where legislation requires one.
- Insurance coverage limits
- Policies cap the amount payable per dwelling and exclude items such as owner-supplied materials. Owners should check limits before signing the contract.
- Dispute resolution sequence
- Consumers usually must complain to the builder, then a regulator or dispute body, before litigating. Time limits apply at each stage.
- Owner-builder obligations
- An owner-builder who sells within the prescribed period must provide insurance cover and disclose the work. Resale obligations attach to the property.