BPC Commercial Builder (Unlimited) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Project Planning, Estimating, and Bidding

  • Build a one-page formula sheet covering quantity takeoff, waste factor, and unit-price conversion, then solve ten practice conversions without notes.

  • Produce a complete estimate for a small commercial shell by sequencing takeoff, pricing, indirect costs, and markup into a single spreadsheet.

  • Draft a bid package checklist that lists scope letter, exclusions, clarifications, schedule, and alternates, then annotate each item with why it prevents a claim.

  • Explain in writing how bonding capacity, bid bonds, and prequalification affect which projects a builder can chase.

Your checkpoint

A worked estimate spreadsheet for one hypothetical shell project with a written bid package checklist attached.

Week 2

Project Planning, Estimating, and Bidding & Contracts, Insurance, and Risk Management

  • Compare lump-sum, cost-plus, GMP, and design-build delivery models by listing risk transfer, cash flow, and change-order mechanics for each.

  • Map the standard AIA-style contract family by purpose and identify which agreement fits each delivery model you compared.

  • Classify ten construction risks into insurable, contractually transferred, retained, or avoided, and name the instrument for each transfer.

  • Summarize the coverage trigger and key exclusions of general liability, builder's risk, and workers' compensation in your own words.

Your checkpoint

A two-page risk register that pairs each identified project risk with a contract clause or insurance instrument.

Week 3

Sitework, Excavation, and Foundations

  • Classify soils by sieve and Atterberg results, then select a suitable compaction standard and test frequency for a shallow foundation.

  • Compute cut and fill volumes for a simple grid and state how swell and shrinkage factors change haul quantities.

  • Sequence excavation support, dewatering, and shoring for a basement excavation and justify each step's order.

  • Size strip and spread footings from given load and allowable bearing values, then check against a deep foundation alternative.

Your checkpoint

A sitework package containing a labeled excavation sequence diagram, a cut/fill calculation, and a footing sizing worksheet.

Week 4

Concrete, Masonry, and Structural Steel

  • Design a concrete mix and curing plan for a given exposure class, selecting cement type, water-cement ratio, and admixtures with justification.

  • Lay out formwork, reinforcement, and embed placement for a slab-on-grade and a suspended slab, noting inspection hold points.

  • Specify masonry units, mortar type, and reinforcement for a bearing wall and explain how movement joints and flashing control cracking and water.

  • Identify bolted and welded steel connection types and describe inspection and nondestructive testing requirements for each.

Your checkpoint

A structural systems comparison memo covering concrete, masonry, and steel options for one building element with cost and schedule tradeoffs.

Week 5

Wood, Cold-Formed Steel, and Rough Carpentry & Building Envelope, Roofing, and Thermal Moisture Protection

  • Compare wood framing, engineered lumber, and cold-formed steel for a low-rise commercial project on span, fire rating, and cost.

  • Detail a wall assembly from sheathing through cladding, showing air, vapor, and water control layers and their correct order.

  • Select roofing membrane and insulation strategy for a low-slope roof and explain how tapered insulation and drainage prevent ponding.

  • Write flashing and sealant details for roof penetrations, parapets, and window openings that maintain continuity of each control layer.

Your checkpoint

A set of three hand-sketched wall, roof, and window detail sections with each control layer labeled and justified.

Week 6

Mechanical, Electrical, and Plumbing Systems

  • Trace the path of supply, return, and exhaust air through a small commercial building and size main duct runs from given loads.

  • Compare constant-volume and variable-air-volume systems on energy use, zoning flexibility, and first cost.

  • Lay out a plumbing system including fixtures, vents, and traps, and explain why each vent and trap is required.

  • Identify electrical service, panel, and branch circuit components in a single-line diagram and compute a load summary from given connected loads.

Your checkpoint

An annotated MEP single-line and riser diagram set with a written load and airflow summary.

Week 7

Interior Finishes, Doors, and Windows & Safety, Codes, and Regulatory Compliance

  • Specify interior finish schedules for walls, floors, and ceilings by room use, citing durability and fire-rating drivers.

  • Select door and window assemblies for a given rating and exposure, including hardware and glazing requirements.

  • Cross-check a hypothetical project against egress, fire separation, and accessibility requirements and log each finding.

  • Build a site safety plan covering fall protection, excavation, and crane or lifting operations with the controlling standard for each.

Your checkpoint

A compliance review log listing at least fifteen code and safety findings with the requirement and corrective action for each.

Week 8

Project Planning, Estimating, and Bidding & Contracts, Insurance, and Risk Management & Concrete, Masonry, and Structural Steel

  • Re-solve the weakest practice areas from earlier weeks under timed conditions and score each attempt.

  • Assemble a one-page summary sheet per domain capturing formulas, code triggers, and contract terms you must recall.

  • Complete two full-length timed practice exams and analyze every missed item by root cause.

  • Write a final review of recurring error patterns and the specific habits that will prevent them on exam day.

Your checkpoint

A complete set of nine domain summary sheets plus a scored error-analysis report from two timed practice exams.

Milestones

Week 2: Can produce a complete estimate and match any delivery model to its contract and insurance instruments without notes.

Week 4: Scores at least 75 percent on a self-made 30-question set drawn from domains 1 through 4.

Week 6: Can sketch and explain a full building assembly and MEP layout from memory in under 30 minutes.

Week 8: Scores at least 80 percent on two timed full-length practice exams with all missed items root-caused.