BPC/VBA Domestic Builder (Unlimited) Exam study materials
BPC/VBA Domestic Builder (Unlimited) Exam study resources

BPC/VBA Domestic Builder (Unlimited) Exam cheat sheet

BPC/VBA Domestic Builder (Unlimited) Exam · Keep the key ideas within reach.

Quick reference

Domestic Building Knowledge

  • National Construction Code (NCC) Volume Two governs Class 1 and Class 10 domestic buildings; Class 1a is a single dwelling, Class 1b a boarding house or guest house, Class 10a a non-habitable structure such as a carport.

  • Performance Solution vs Deemed-to-Satisfy: a Performance Solution must be verified against the NCC Performance Requirements, while DtS provisions are prescriptive recipes accepted as compliant.

  • Site classification under AS 2870 runs A, S, M, H1, H2, E, P; class A is stable sand/rock with little movement, class P requires site-specific geotechnical design.

  • Minimum ceiling height for habitable rooms is generally 2.4 m with 2.1 m permitted over not more than one third of the floor area; a kitchen, laundry or corridor may be 2.1 m.

  • Habitable room light: window area not less than 10 percent of floor area; ventilation: openable window area not less than 5 percent of floor area.

  • Stair geometry rules: riser 190-220 mm and going 240-355 mm for domestic stairs, with a 2 m minimum head clearance measured vertically from the nosing line.

  • Balustrade height for a balcony or stair is 1.0 m where the drop exceeds 1 m, with no climbable openings that pass a 125 mm sphere; a 865 mm barrier applies to windows.

  • Wet area waterproofing under AS 3740 requires a minimum 150 mm upturn at wall junctions and full floor coverage in showers, with shower area falls of 1:80 to 1:100.

Quick reference

Domestic Building Practice and Management

  • Contract price and progress payment schedules must align with the stages named in the contract; a builder cannot demand payment for a stage not yet completed.

  • Domestic building work insurance (home warranty) must be taken out before work starts and covers structural defects for the statutory period, commonly 6 years structural and 2 years non-structural.

  • Variations must be in writing, signed by the owner, and state the change, the price adjustment and any time extension before the work proceeds.

  • Retention is commonly 5 percent of each progress payment held until practical completion, then reduced to 2.5 percent during the defects liability period.

  • Practical completion is reached when the works are complete except for minor omissions or defects that do not prevent the building being used for its intended purpose.

  • A defects liability period of 12 months from practical completion is typical; the owner must notify defects in writing for the builder to rectify at no cost.

  • Safety: a Safe Work Method Statement (SWMS) is required for high-risk construction work such as work over 2 m, and site induction records must be kept.

  • Programme logic: critical path is the longest sequence of dependent tasks; float is the spare time a non-critical task can slip without delaying completion.

  • Progress claims should be supported by a statutory declaration that subcontractors and suppliers have been paid, protecting the owner from payment claims.