Quick reference

Design

  • Design process sequence: identify need → define brief → research → generate concepts → develop and refine → prototype/test → evaluate against brief → document and communicate.

  • A design brief must state the problem, target user, constraints, and success criteria; constraints are fixed limits, criteria are measurable goals used to judge solutions.

  • Functional analysis decomposes a product into sub-functions (e.g. transmit force, store energy) so each can be solved independently before recombination.

  • Ergonomic design rule: anthropometric data should be applied at the 5th percentile for reach limits and the 95th percentile for clearance, never the mean alone.

  • Design for manufacture and assembly (DFMA) reduces part count; fewer parts typically lowers assembly time, cost, and failure points.

  • Aesthetics principles: proportion, balance, unity, rhythm, contrast, and emphasis; each can be evaluated but not measured on a single absolute scale.

  • Intellectual property: a patent protects a new functional invention (typically up to 20 years), a design registration protects appearance, and copyright protects original expression automatically.

  • Life cycle assessment (LCA) stages: raw material extraction, manufacture, distribution, use, and end-of-life; impacts are summed per functional unit for comparison.

  • Human-centred design uses observation and user testing rather than assumption; iterative prototyping cycles shorten the feedback loop between user and designer.

Quick reference

Materials

  • Stress σ = F/A (N/mm² or MPa); strain ε = ΔL/L₀ (dimensionless); Young's modulus E = σ/ε in the linear elastic region.

  • Yield strength marks the end of elastic behaviour; ultimate tensile strength is the maximum stress before necking; failure occurs at fracture stress.

  • Hardness, toughness, and ductility are distinct: toughness is energy absorbed before fracture, ductility is plastic strain before failure.

  • Ferrous alloys: increasing carbon raises hardness and strength but lowers ductility and weldability; stainless steels gain corrosion resistance from chromium (>10.5%).

  • Thermoplastics soften on reheating and are recyclable; thermosetting polymers cross-link permanently and cannot be remelted.

  • Composites combine matrix and reinforcement; specific strength and stiffness exceed most metals, but properties are anisotropic and recycling is difficult.

  • Material selection uses property charts: plot two properties logarithmically, apply performance index lines, then filter by cost, availability, and process compatibility.

  • Corrosion prevention methods: barrier coating, cathodic protection, alloying, and design that avoids trapped moisture and dissimilar-metal contact.

  • Wood is anisotropic: strength along the grain exceeds strength across it; moisture content changes cause shrinkage and swelling.

Quick reference

Manufacturing and production processes

  • Casting: molten material fills a mould cavity; sand casting suits complex low-volume ferrous parts, die casting suits high-volume non-ferrous parts with fine detail.

  • Forming processes conserve material: rolling, forging, extrusion, and pressing reshape material plastically; forging aligns grain flow and improves fatigue strength.

  • Machining is subtractive: turning uses a rotating workpiece, milling uses a rotating cutter, drilling produces holes; feed and speed determine surface finish and tool life.

  • Joining: welding fuses material, brazing and soldering use a filler with a lower melting point, and adhesives distribute stress but need surface preparation.

  • Injection moulding requires draft angles (typically 1–2°), uniform wall thickness, and radii to avoid warping and ejection damage.

  • Additive manufacturing builds parts layer by layer; it suits low-volume complex geometry but has slower cycle times and anisotropic strength.

  • Lean production targets the seven wastes (overproduction, waiting, transport, over-processing, inventory, motion, defects); takt time = available time / customer demand.

  • Quality control: tolerance is the permitted deviation from nominal; go/no-go gauges check limits quickly, and statistical process control plots sample means against control limits.

  • Automation trade-off: higher capital cost is justified when volume is high and product variety is low; flexible manufacturing suits mid-volume, high-variety output.

Quick reference

Management and planning

  • Project management phases: initiation, planning, execution, monitoring and control, and closure; each phase produces defined deliverables.

  • Critical path method: the critical path is the longest-duration path through the network; any delay on it delays project completion, and its float is zero.

  • Float (slack) = latest start − earliest start; activities with positive float can be delayed without affecting the project end date.

  • Gantt charts show activity duration against calendar time; network diagrams show logical dependencies, so the two are complementary tools.

  • Work breakdown structure decomposes deliverables hierarchically until each work package can be estimated, scheduled, and assigned.

  • Cost estimating types: bottom-up is accurate but slow, analogous uses past similar projects, and parametric uses a cost-per-unit relationship.

  • Risk management cycle: identify, assess likelihood and consequence, treat (avoid, reduce, transfer, accept), then monitor and review.

  • Quality management uses the plan–do–check–act cycle; specifications define requirements and inspection verifies conformance.

  • Break-even quantity = fixed costs / (unit price − variable cost per unit); it identifies the output at which total revenue equals total cost.