Mistake 1

When asked to justify a design decision, the candidate describes what the product looks like or does instead of linking the feature to the identified need, user, or design criterion.

Candidates treat 'describe' and 'justify' as interchangeable and write the feature list they memorised, without re-reading the command word or the scenario's stated user needs.

What to do instead

Before writing, underline the command word and the user need in the prompt. Use a two-part sentence structure for every justification: 'Feature X was chosen because it [function] which meets criterion Y [quoted from the brief]'. Practise converting five descriptive statements into this form per session.

Mistake 2

Candidates list design criteria but never use them as a checklist, so the final evaluation ignores criteria they themselves set and instead praises the product generally.

Criteria are written early as a box-ticking exercise and not revisited; under time pressure the evaluation becomes a vague summary of strengths.

What to do instead

Number each criterion when written. In the evaluation, work through the numbered list one by one, stating met, partly met, or not met with evidence from the design or testing. Any criterion left unaddressed should be visibly flagged as a gap.

Mistake 3

When selecting a material, the candidate names a material and gives one property, without comparing it to at least one alternative or linking the property to the product's service conditions.

Recall of material names is easier than recall of comparative property data, and candidates fear getting numbers wrong so they avoid specifics.

What to do instead

Use a three-column comparison table: material, key property with an approximate value, and why that matters for this product's loads, environment, or manufacturing method. Always include one rejected alternative with the reason for rejection.

Mistake 4

Candidates confuse or misuse property terminology, for example treating hardness and toughness as the same, or stiffness and strength as the same, when explaining a material choice.

Everyday language blurs these terms and the definitions are learned as isolated glossary entries rather than as distinctions that change a design decision.

What to do instead

Build a contrast pair list (hardness vs toughness, stiffness vs strength, conductivity vs resistivity, durability vs hardness) and for each pair write one product example where choosing one over the other matters. Test yourself by explaining the pair aloud without notes.

Mistake 5

Candidates describe a manufacturing process in generic textbook order but omit the specific parameters, tooling, or quality checks that show understanding of that process for that product.

Processes are memorised as a sequence of steps, so the answer reads as a definition rather than a production plan; parameters feel risky to state.

What to do instead

For each core process, prepare a one-page card: typical equipment, key controllable parameters with rough ranges, a common defect and its cause, and one suitable and one unsuitable product example. In answers, name at least two parameters and one inspection point.

Mistake 6

When asked to choose a process for a given batch size or material, the candidate recommends a process without stating the volume, cost, or tooling assumptions that make it appropriate.

Candidates match process to material only, forgetting that scale and tooling cost drive the decision; they also avoid committing to a batch-size judgement.

What to do instead

Use a decision sentence template: 'For an estimated volume of N units in material M, process P is appropriate because tooling cost is [low/high] and unit cost falls/rises with volume; process Q would be uneconomic because...'. Practise with three volume tiers: one-off, hundreds, thousands.

Mistake 7

Candidates produce a project plan that lists tasks in order but shows no dependencies, durations, or resources, so it cannot be used to sequence or monitor work.

Planning is treated as a narrative of what will happen rather than a scheduling tool; candidates have not practised converting a task list into a network or Gantt-style structure.

What to do instead

For every plan, force three columns: duration, predecessor, and resource or person. Then identify the critical path by adding durations along each chain and state which task has zero float. Include one sentence on what happens to the end date if a named critical task slips.

Mistake 8

Candidates describe quality control as 'checking the product at the end' and cannot distinguish quality control from quality assurance or name a specific technique.

The terms are learned as synonyms and the production context is not linked to inspection stages, so answers stay at the level of general intent.

What to do instead

Learn the distinction as a one-liner: assurance is what you do to the process to prevent defects, control is what you do to the output to detect them. For each product studied, name one assurance measure (for example a jig, standard operating procedure, or supplier specification) and one control measure (for example a gauge check or sampling plan).

Mistake 9

Candidates answer evaluation questions with opinions only, offering no measured or observed evidence and no suggested improvement with a stated benefit.

Testing data collected during the project is not carried into the exam answer, and candidates believe evaluation means giving a personal verdict.

What to do instead

Structure every evaluation paragraph as evidence, judgement, improvement: state a test result or observation, judge against the criterion, then propose one specific change and the expected effect. Keep a memorised set of plausible test metrics (dimensions, load held, time taken, cost per unit) to draw on.

Mistake 10

Candidates use safety, ergonomics, and sustainability as unexamined buzzwords, asserting a product is 'safe' or 'eco-friendly' without naming the hazard, standard, or lifecycle stage involved.

These are high-frequency marking points, so candidates insert the words hoping for credit without the specific content that earns it.

What to do instead

Attach a mandatory specificity rule to each term: for safety name the hazard and the control; for ergonomics name the body dimension or posture and the adjustment; for sustainability name the lifecycle stage and the specific choice (material, fastening, disassembly, energy). Write one sentence per term in practice answers and delete any that lack this detail.