Roofing Materials, Components, and System Selection

  • One roofing square equals 100 sq ft of finished roof area; asphalt shingles are normally packaged three bundles per square.

  • Asphalt shingles require a minimum slope of 2:12. Slopes from 2:12 up to 4:12 require a double layer of underlayment.

  • Below 2:12 slope, a low-slope membrane system must be used (modified bitumen, EPDM, TPO, PVC, or spray foam); shingles are not permitted.

  • Approximate dead loads: 3-tab asphalt about 2.5 psf, architectural asphalt about 3.5 psf, standing-seam metal about 1.5 psf, concrete or clay tile 9 to 12 psf, slate 7 to 10 psf.

  • Wind ratings: ASTM D7158 classifies shingles as Class D, G, or H; ASTM D3161 uses Classes A through F from wind-tunnel testing.

  • Typical minimum slopes by covering: slate 4:12, wood shakes 4:12, clay or concrete tile 2.5:12 to 3:12, standing-seam metal 3:12, asphalt shingle 2:12.

  • Class A fire rating is assigned to a tested assembly, not to a single product; fiberglass asphalt shingles over a listed underlayment commonly achieve it.

  • An ice-dam protection membrane is required where the January mean temperature is 25 degrees F or lower.

Quick reference

Roof Decking, Substrate Preparation, and Underlayment

  • A panel span rating such as 24/16 means the panel may span 24 in. on center as roof sheathing and 16 in. on center as floor sheathing; the rating must meet or exceed the rafter spacing.

  • Sheathing fastening: 8d common or 6d ring-shank nails at 6 in. on center along panel edges and 12 in. on center in the field.

  • A 1/8-in. gap is left between panel edges for expansion, and every panel end joint must bear on framing.

  • Minimum underlayment on slopes 4:12 and steeper is No. 15 asphalt-saturated felt (ASTM D226 Type I) or an equivalent synthetic; slopes of 2:12 to 4:12 take two layers.

  • Felt is lapped 2 in. on side laps and 4 in. on end laps, laid shingle-fashion so upper strips overlap lower strips.

  • Ice-dam membrane runs at least 36 in. measured from the eave edge and extends at least 24 in. inside the exterior wall line.

  • Valley underlayment is a minimum 36-in.-wide strip centered on the valley, or two 18-in. strips.

  • The deflection limit for roof decks under most coverings is L/240 under total load.

Quick reference

Steep-Slope Roofing Installation (Shingle, Tile, Metal, Slate, Wood)

  • Asphalt shingles take 4 fasteners placed in the manufacturer's nail line, 1/4 in. to 1 in. above the exposure line and about 3/4 in. from each end; 6 fasteners are used in high-wind zones.

  • Fasteners must penetrate at least 3/4 in. into solid decking or completely through the underside of the panel.

  • A starter course is installed at the eave, and each succeeding shingle course is offset 6 in. from the one below it.

  • Standard 3-tab shingles are 12 in. by 36 in.; a 5-in. exposure produces 80 shingles per square.

  • Slate headlap is 3 in. for slopes from 4:12 to 8:12 and 2 in. on slopes steeper than 8:12.

  • Wood shakes: 24-in. shakes are exposed a maximum of 10 in. with a minimum 1-in. headlap; 18-in. shakes are exposed a maximum of 7.5 in.

  • Standing-seam metal uses concealed clips and must accommodate thermal movement of roughly 1/8 in. per 10 ft per 10 degrees F of temperature change.

  • Fasteners for tile and slate must be corrosion resistant (copper, stainless steel, or hot-dip galvanized) and long enough to reach the framing.

Quick reference

Low-Slope and Built-Up Roofing Systems (Mod-Bit, EPDM, TPO, PVC, Foam)

  • Low-slope roofing is defined as a slope at or below 3:12; the minimum practical drainage slope is 1/4:12, about 2 percent.

  • EPDM is a thermoset single ply, typically 45 or 60 mil, seamed with splice adhesive or butyl tape using a 3-in. to 6-in. lap.

  • TPO and PVC are thermoplastics joined by heat or solvent welding; TPO seams are hot-air welded at roughly 500 to 1,000 degrees F.

  • SBS-modified bitumen is elastomeric and may be torch-applied, hot-mopped, or cold-adhered; APP-modified bitumen is plastomeric and is normally torch-applied.

  • A conventional built-up roof consists of alternating plies of felt and asphalt, usually three or four plies, finished with a flood coat and gravel or a cap sheet.

  • Spray polyurethane foam is applied in passes limited to about 1.5 in. per pass and must receive a protective coating or granule surfacing.

  • Single-ply attachment methods are fully adhered, mechanically attached, and ballasted; uplift resistance comes from the rated assembly, such as UL 1897 or FM approval.

  • Roof insulation in a low-slope assembly must be listed for the assembly's fire classification and protected by a thermal barrier or an approved assembly.

Quick reference

Flashing, Penetrations, and Waterproofing Details

  • Base flashing on shingle roofs must extend at least 4 in. above the roof surface; 8 in. is common practice at low-slope walls and curbs.

  • Step flashing pieces are at least 4 in. by 4 in. per shingle course and lap the piece below by 2 in.

  • Counterflashing laps the base flashing by at least 1 in. and is set in a reglet at least 1 in. deep.

  • A cricket is required on the uphill side of any chimney or curb wider than 30 in.

  • A pipe penetration uses a listed boot with a collar sized to the pipe and a flange lapped at least 2 in. onto the field membrane.

  • Open valley metal is at least 16 oz copper or equivalent, with a minimum 4-in. exposure between the shingle edges.

  • Roof drains are set in a sump with the membrane flange clamped to the drain ring, and strainers are installed before the roof is accepted.

  • Kick-out flashing at the base of a roof-to-wall intersection directs water away from the wall and into the gutter.

Quick reference

Roof Drainage, Insulation, and Ventilation

  • Slope is rise over run; a 1/4:12 slope equals about 2 percent, or 1/4 in. of fall per foot.

  • Net free attic vent area is at least 1/150 of the attic floor area, or 1/300 where a Class I or II vapor retarder is installed.

  • In a balanced ventilation system, 40 to 50 percent of the vent area is located at or near the ridge and the remainder at the eaves.

  • A 1-in. air space is maintained between the roof deck and the insulation at the eaves with rigid baffles to keep the intake path open.

  • Downspout sizing rule of thumb: 1 sq in. of leader area for each 100 sq ft of roof area served.

  • Gutters are pitched about 1/16 in. per foot toward the outlet.

  • Cold-climate ceilings are typically insulated to R-49; warm climates allow R-30 to R-38, as set by the adopted energy code.

  • Roof drains and scuppers are sized from the 100-year, 1-hour rainfall rate for the project site.

Quick reference

Roof Inspection, Repair, and Maintenance

  • Granule loss that exposes the asphalt mat, along with curling and clawing, indicates the covering is at the end of its service life.

  • Blisters are raised, circular, and unadhered beneath the shingle; hail bruises are soft, randomly scattered, and show a fractured mat.

  • Infrared thermography and nuclear moisture meters locate wet insulation in low-slope roofs without destructive testing.

  • A core sample through a low-slope roof reveals ply count, insulation type and thickness, and the presence of moisture in the assembly.

  • Repairs extend at least 6 in. beyond the damaged area and are lapped shingle-fashion with the existing plies.

  • Routine maintenance inspection occurs at least twice a year and after any windstorm or hail event; drains and scuppers are cleared of debris.

  • An open single-ply seam wider than about 1/2 in. is cleaned, primed, and re-welded or covered with a splice rather than sealed with caulk.

Quick reference

Estimating, Plan Reading, and Project Planning

  • Roof area equals plan area multiplied by the pitch factor: 1.054 at 4:12, 1.083 at 5:12, 1.118 at 6:12, 1.202 at 8:12, 1.250 at 9:12, 1.414 at 12:12.

  • Waste allowance is about 10 percent for simple gable roofs and 15 percent or more for hip roofs with many cuts and valleys.

  • Accessories are taken off in linear feet: eave and rake edge metal, ridge and hip caps, valley metal, and step flashing.

  • At a scale of 1/4 in. = 1 ft 0 in., 1 in. on the drawing equals 4 ft in the field.

  • Labor is estimated in squares per crew-day, and productivity drops with pitch, height, and the number of penetrations and valleys.

  • A contingency of 5 to 10 percent covers concealed deck repair, flashing replacement, and code-required upgrades.

  • Scale is verified against two or more printed dimensions on the drawings before any dimension is scaled from the plan.

Quick reference

Codes, Standards, and Jobsite Safety Compliance

  • OSHA 29 CFR 1926 Subpart M requires fall protection whenever a worker is exposed to a fall of 6 ft or more.

  • Personal fall-arrest anchors are rated for 5,000 lb per worker or are part of an engineered, certified system.

  • Guardrails are 42 in. plus or minus 3 in. high with a midrail at about 21 in. and a toe board.

  • On low-slope roofs a warning line is set at least 6 ft from the edge, and mechanical equipment stays at least 10 ft back.

  • Extension ladders extend at least 3 ft above the landing and are set at a 4:1 base-to-height ratio.

  • Torch work and kettle operations require a hot-work permit, a dedicated fire watch during the work, and a watch period of at least 30 minutes afterward.

  • A charged extinguisher is kept immediately available at kettle and torch locations, and kettles are located away from combustible construction.