AZ Roofing Contractor study materials
AZ Roofing Contractor study resources

AZ Roofing Contractor study plan

AZ Roofing Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Roofing Materials, Components, and System Selection & Roof Decking, Substrate Preparation, and Underlayment

  • Classify the six major steep-slope material families (asphalt shingle, tile, metal, slate, wood, synthetic) by weight, minimum slope, and required substrate

  • Match underlayment types to slope and material using manufacturer-written slope tables rather than memory

  • Sequence deck preparation steps for a re-roof: sheathing inspection, fastener schedule, ice barrier placement, drip edge order

  • Sketch a labeled roof section naming ridge, hip, valley, eave, rake, and starter course components

Your checkpoint

One-page material selection matrix (material x minimum slope x underlayment x fastening) written from scratch and self-quizzed to 90% accuracy

Week 2

Steep-Slope Roofing Installation (Shingle, Tile, Metal, Slate, Wood)

  • Install-lay out a shingle roof on paper: calculate course exposure, starter, offset pattern, and valley weave versus cut method

  • Differentiate installation requirements for tile, metal, slate, and wood systems in nailing pattern, clip/fastener type, and expansion allowance

  • Demonstrate correct ventilation-and-underlayment buildup beneath each steep-slope material

  • Diagnose five common steep-slope installation defects and write the corrective detail for each

Your checkpoint

Three hand-drawn installation detail sheets (shingle valley, metal panel sidelap, tile hip) each annotated with slope limits and fastener specs

Week 3

Steep-Slope Roofing Installation (Shingle, Tile, Metal, Slate, Wood) & Flashing, Penetrations, and Waterproofing Details

  • Solve ten exposure and coverage math problems for shingles, tile, and standing-seam panels

  • Detail penetration flashing for pipe boots, vents, and chimney on steep-slope assemblies

  • Explain step flashing and counterflashing sequence at sidewalls, headwalls, and dormers

  • Compare pan flashing, crickets, and saddle details at valleys and roof-to-wall intersections

Your checkpoint

A flashing detail portfolio of six labeled sketches (step, counter, pan, chimney, valley, cricket) with the water-shedding logic written under each

Week 4

Flashing, Penetrations, and Waterproofing Details & Low-Slope and Built-Up Roofing Systems (Mod-Bit, EPDM, TPO, PVC, Foam)

  • Detail waterproofing at parapets, curbs, expansion joints, and roof-to-deck transitions

  • Identify membrane types (mod-bit, EPDM, TPO, PVC, spray polyurethane foam) by material properties, seams, and attachment methods

  • Contrast single-ply seam methods (heat-weld, solvent, tape) and the inspection test used for each

  • Assemble the correct base sheet, ply, and surfacing buildup for a modified bitumen system at a given slope and use

Your checkpoint

Timed 40-question mixed practice set on domains 4 and 5, scored and fully corrected with written rationales for every miss

Week 5

Low-Slope and Built-Up Roofing Systems (Mod-Bit, EPDM, TPO, PVC, Foam)

  • Sequence a built-up roof installation from deck to flood coat, naming interply, ply sheet, and surfacing requirements

  • Apply minimum slope, ponding, and tapered insulation rules to low-slope layout decisions

  • Specify attachment patterns (mechanically fastened, adhered, ballasted) against wind-uplift and substrate constraints

  • Identify repair methods for blisters, ridging, seam failure, and punctures on each low-slope membrane

Your checkpoint

A one-page low-slope system comparison chart (five membrane types x slope range x seam method x attachment x common failure mode) built without notes

Week 6

Roof Drainage, Insulation, and Ventilation

  • Calculate required net free vent area for a given attic floor area and balance intake against exhaust

  • Size gutters, downspouts, and scuppers against roof plan area and rainfall intensity

  • Distinguish insulation types and where each belongs in a low-slope versus steep-slope assembly

  • Check a proposed assembly for condensation risk and vapor retarder placement by climate

Your checkpoint

A worked ventilation and drainage calculation packet: one attic venting problem and one gutter sizing problem solved end to end with units shown

Week 7

Roof Inspection, Repair, and Maintenance & Estimating, Plan Reading, and Project Planning

  • Build a roof inspection checklist organized by component and write the observation a report should contain

  • Read a roof plan and elevation to extract slope, square footage, and waste factor

  • Convert takeoff quantities into a line-item estimate with labor, material, and overhead

  • Produce a repair versus replacement recommendation justified by inspection findings

Your checkpoint

A complete sample estimate and scope of work for a two-slope roof, with takeoff quantities, waste factor, and a one-paragraph recommendation memo

Week 8

Codes, Standards, and Jobsite Safety Compliance

  • Recall fall-protection thresholds, ladder setup rules, and roof-edge warning-line distances

  • Apply code requirements for fastening, fire classification, and minimum slope to two scenario questions

  • Run two full timed 50-question mock exams and record domain-level scores

  • Re-drill only the two weakest domains until each practice section clears 85%

Your checkpoint

Two scored mock exams with an error log listing every missed item by domain and the correction written in your own words

Milestones

Week 4: Score 75% or higher on the domain 4/5 mixed set and correctly draw six flashing details from memory without reference

Week 6: Complete ventilation and drainage calculations with correct units, and explain each low-slope membrane's attachment and failure mode aloud in under three minutes

Week 8: Score 85% or higher on both full mock exams with no domain below 70%, and error log fully rewritten