BCSP ASP study materials
BCSP ASP study resources

BCSP ASP cheat sheet

BCSP ASP · Keep the key ideas within reach.

Quick reference

Advanced Safety Concepts

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.

  • Heinrich's ratio for a typical workplace is 1 major injury : 29 minor injuries : 300 no-injury incidents, implying near misses outnumber serious outcomes.

  • Reason's Swiss cheese model holds that an accident occurs when holes in multiple defensive layers align; holes arise from active failures and latent conditions.

  • Leading indicators measure preventive activity (inspections completed, training hours, near-miss reports); lagging indicators measure outcomes already realized (TRIR, DART, fatalities).

  • TRIR = (number of recordable cases x 200,000) / total hours worked; the 200,000 constant represents 100 employees working 40 hours for 50 weeks.

  • DART rate = (cases with days away, restricted work, or transfer x 200,000) / total hours worked.

  • Risk homeostasis theory: individuals adjust behavior toward a target level of perceived risk, so a single engineered safeguard may be partially offset by changed behavior.

  • Safety culture maturity progresses pathological, reactive, calculative, proactive, generative; generative cultures treat information and failure reporting as primary value.

  • Normalization of deviance: repeated tolerance of small out-of-specification conditions gradually redefines the accepted norm until margin is exhausted.

Quick reference

Safety Management Systems

  • ISO 45001 is organized in clauses 4 context, 5 leadership and worker participation, 6 planning, 7 support, 8 operation, 9 performance evaluation, 10 improvement.

  • ANSI/ASSP Z10 is the US consensus OHSMS standard; ISO 45001 is the international certifiable standard that superseded OHSAS 18001.

  • Both systems run on PDCA: Plan (objectives, hazard identification, legal requirements), Do (operational control, training), Check (monitoring, audit), Act (management review, corrective action).

  • Top management must demonstrate leadership, ensure resources, assign OHS roles and responsibilities, and participate in management review.

  • Management review inputs include audit results, incident and nonconformity data, compliance evaluation, objective status, and stakeholder input; outputs include resource and improvement decisions.

  • Documented information must be controlled for version, availability, legibility, and protection from loss or unintended alteration.

  • Contractor control requires OHS criteria in selection, communicated requirements, and monitoring of contractor performance on site.

  • OSHA's Voluntary Protection Programs (Star, Merit, Demonstration) recognize sites with injury and illness rates below the industry average and a functioning safety management system.

  • A management system audit verifies conformance to the system standard or procedure; a worksite inspection identifies uncontrolled hazards, and the two serve different purposes.

Quick reference

Risk Management

  • Risk is the combination of the likelihood of occurrence and the severity of harm; the hazard is the source or situation with potential to cause harm.

  • ISO 31000 process: establish context, identify risk, analyze risk, evaluate risk, treat risk, then monitor/review and communicate/consult throughout.

  • ALARP (as low as reasonably practicable): risk must be reduced until further reduction is grossly disproportionate to cost, time, or difficulty.

  • Risk treatment follows the hierarchy of controls; residual risk remaining after treatment must be documented and judged acceptable against pre-set criteria.

  • A risk matrix multiplies likelihood by severity; acceptance criteria and action bands must be defined before scoring to avoid justifying a desired result.

  • FMEA ranks failure modes by severity x occurrence x detection = risk priority number; highest RPN items are addressed first.

  • HAZOP applies guide words (no, more, less, reverse, part of, other than) to process parameters to find deviations from design intent.

  • LOPA tests whether independent protection layers reduce a scenario frequency to a tolerable level; each layer must be independent, auditable, and validated.

  • A bow-tie diagram links threats and preventive barriers to a top event, then mitigating barriers to consequences, making barrier ownership visible.

Quick reference

Hazard Identification and Control

  • JHA/JSA sequence: select the job, break it into steps, identify hazards at each step, assess risk, prescribe controls, implement, then review and update.

  • A walk-through survey identifies uncontrolled exposures; an audit verifies conformance to a standard; a job hazard analysis examines task-level exposure step by step.

  • Apply the hierarchy of controls at each task step; PPE is the last line of defense and cannot substitute for feasible engineering or administrative controls.

  • LOTO (29 CFR 1910.147) sequence: notify affected employees, shut down, isolate the energy source, apply lock and tag, release stored energy, verify zero energy state.

  • Permit-required confined space entry (1910.146) requires pre-entry and continuous atmospheric testing (oxygen 19.5 to 23.5 percent), ventilation, an attendant outside, and a rescue plan.

  • Incident investigation steps: secure and preserve the scene, collect physical evidence and statements, build a timeline, determine causal and root causes with 5 Whys or cause-and-effect analysis, assign corrective actions, verify effectiveness.

  • Near misses are incidents with no injury or damage; they should be reported and investigated as leading indicators of control failure.

  • Machine guarding (1910.212) is required at the point of operation, power transmission apparatus, and other moving parts that expose employees to injury.

  • Fall protection triggers at 4 feet in general industry and 6 feet in construction; guardrails, nets, or personal fall arrest with a 5,000 lb anchor are accepted systems.

Quick reference

Safety Training and Communication

  • A training needs assessment compares task requirements with current knowledge, skill, and ability for a defined audience before content is designed.

  • Learning objectives must be observable and measurable and tied to specific job tasks, using action verbs such as identify, demonstrate, or perform.

  • ADDIE model: Analysis, Design, Development, Implementation, Evaluation.

  • Kirkpatrick's four evaluation levels are reaction, learning, behavior, and results; behavior change on the job and results are the strongest evidence of transfer.

  • ANSI/ASSP Z490.1 addresses training program management, development, delivery, evaluation, and documentation of safety, health, and environmental training.

  • Hazard Communication (1910.1200) requires training at initial assignment and whenever a new chemical hazard is introduced into the work area.

  • Adult learners require relevance to their job, opportunity to practice, timely feedback, and respect for prior experience; hands-on demonstration improves retention over lecture alone.

  • Printed training materials should match the audience's reading level; many US safety guidance documents target a 5th to 8th grade readability level.

  • Training records should capture trainee name, date, content, trainer identity, and the evaluation method or demonstration used to confirm competence.

Quick reference

Legal and Regulatory Aspects of Safety

  • The OSH Act was signed December 29, 1970 and created OSHA within the Department of Labor; 29 CFR 1910 covers general industry, 1926 construction, 1915 and 1918 maritime.

  • OSH Act Section 5(a)(1), the General Duty Clause, requires a workplace free from recognized hazards likely to cause death or serious physical harm; it applies where no specific standard governs.

  • Section 5(a)(2) requires compliance with the specific standards promulgated under the Act.

  • OSHA inspection priority order: imminent danger, fatality or catastrophe, employee complaints and referrals, programmed inspections, follow-up inspections.

  • Recordkeeping (29 CFR 1904): entries on the OSHA 300 log within 7 calendar days; fatalities reported within 8 hours; in-patient hospitalization, amputation, or loss of an eye within 24 hours.

  • The OSHA 300A annual summary is posted from February 1 through April 30; the 300 log and supporting documents are retained for 5 years.

  • A case is recordable only if it is work-related and results in death, days away, restricted work or transfer, medical treatment beyond first aid, loss of consciousness, or a significant diagnosed condition.

  • Employee rights include protection from retaliation under Section 11(c), the right to request an inspection, to accompany the compliance officer, and to access exposure and medical records.

  • OSHA's multi-employer policy permits citation of the creating, exposing, correcting, and controlling employers on the same worksite.

Quick reference

Environmental Management

  • ISO 14001 follows PDCA and requires an aspect and impact register, compliance obligations, objectives, operational controls, monitoring and measurement, and management review.

  • An environmental aspect is an element of an activity, product, or service that interacts with the environment; an environmental impact is the actual or potential change to the environment resulting from it.

  • Aspect significance is determined by defined criteria such as severity, likelihood, regulatory status, and interested-party concern; the criteria are set before evaluation.

  • Pollution prevention hierarchy: reduce at the source, reuse or recycle, treat, then dispose as the last option.

  • RCRA hazardous waste generator categories by monthly generation: very small quantity generator under 100 kg, small quantity generator 100 to 1,000 kg, large quantity generator over 1,000 kg.

  • Accumulation limits: large quantity generator 90 days; small quantity generator 180 days, extended to 270 days when the treatment facility is over 200 miles away.

  • A CERCLA release of a hazardous substance at or above its reportable quantity must be reported immediately to the National Response Center.

  • EPCRA Section 313 Toxic Release Inventory Form R is due July 1 and covers releases for the prior calendar year.

  • Construction stormwater permits under NPDES require a Stormwater Pollution Prevention Plan with best management practices; SPCC plans are required for oil storage above the regulatory threshold.