- Hierarchy of Controls
- Ranked intervention strategy from most to least effective: elimination, substitution, engineering controls, administrative controls, and personal protective equipment, which is the last line of defense.
- Heinrich injury ratio
- Classic accident pyramid showing roughly one major injury for every 29 minor injuries and 300 no-injury incidents, supporting focus on near misses and unsafe conditions.
- Normalization of deviance
- Process by which an organization gradually accepts repeated small departures from procedure or specification as normal, eroding safety margin until a serious failure occurs.
- Leading versus lagging indicators
- Leading indicators measure preventive activity such as inspections and near-miss reports; lagging indicators measure outcomes already realized, such as recordable injury rates and DART.
- Swiss cheese model
- Reason's accident model in which multiple defensive layers each contain holes; an incident occurs only when holes in successive layers align, allowing a hazard trajectory to pass through.
- ISO 45001
- International certifiable standard for occupational health and safety management systems, organized in clauses 4 through 10 and built on the plan-do-check-act continual improvement cycle.
- ANSI/ASSP Z10
- US consensus standard specifying requirements for an occupational health and safety management system, emphasizing management leadership, planning, implementation, evaluation, and correction.
- Management review
- Top management's planned evaluation of the safety management system for continuing suitability, adequacy, and effectiveness, producing decisions on resources, objectives, and improvement actions.
- OSHA VPP
- Voluntary Protection Programs in which OSHA recognizes sites with functioning safety management systems and injury and illness rates below the industry average; levels are Star, Merit, and Demonstration.
- PDCA cycle
- Plan-do-check-act: a four-stage continual improvement loop used by ISO 45001 and ISO 14001 to establish objectives, implement controls, monitor results, and correct deficiencies.
- Risk definition
- The combination of the likelihood that a hazardous event occurs and the severity of harm it would cause; distinct from the hazard, which is the source of potential harm.
- ALARP principle
- As low as reasonably practicable: risk must be reduced until the cost, time, and difficulty of further reduction are grossly disproportionate to the benefit gained.
- Residual risk
- The risk that remains after controls have been applied; it must be documented, communicated, and judged acceptable against criteria established before treatment.
- Risk matrix
- A qualitative or semi-quantitative tool that plots likelihood against severity to assign a risk score and an action priority band.
- Bow-tie analysis
- A diagram linking threats and preventive barriers to a top event, then mitigating barriers to consequences, used to visualize and verify layers of protection.
- Job hazard analysis
- A technique that breaks a job into sequential steps, identifies hazards and exposures in each step, and specifies controls before the task is performed.
- Five whys
- Root cause analysis technique that repeatedly asks why a condition or event occurred until the fundamental system-level cause, rather than the immediate cause, is identified.
- Near miss
- An unplanned event that did not cause injury, illness, or damage but had the potential to do so; investigated as evidence of a failed or missing control.
- Lockout tagout
- Energy control procedure requiring notification, shutdown, isolation, lock and tag application, release of stored energy, and verification of a zero energy state before work.
- Permit-required confined space
- A space with limited entry or exit, not designed for occupancy, containing or potentially containing a hazardous atmosphere or other serious hazard, requiring a written entry permit.
- Kirkpatrick evaluation model
- Four-level training evaluation: reaction, learning, behavior, and results; the higher levels measure on-the-job transfer and organizational outcomes.
- ANSI/ASSP Z490.1
- US consensus standard setting criteria for accepted practices in safety, health, and environmental training, covering program management, development, delivery, evaluation, and records.
- ADDIE instructional model
- Five-phase instructional design sequence: analysis, design, development, implementation, and evaluation, used to build task-relevant safety training.
- Toolbox talk
- A short, focused pre-task briefing for a crew that addresses the specific hazards, controls, and required behaviors for the work about to be performed.
- General Duty Clause
- OSH Act Section 5(a)(1): each employer must furnish a workplace free from recognized hazards likely to cause death or serious physical harm, used when no specific standard applies.
- OSHA 300 log
- Running record of work-related injuries and illnesses that meet recordability criteria; entries must be made within seven calendar days of learning of the case.
- OSHA inspection priorities
- Order of inspection selection: imminent danger, fatality or catastrophe, employee complaints and referrals, programmed inspections, and follow-up inspections.
- Multi-employer worksite policy
- OSHA policy allowing citations of the creating employer, exposing employer, correcting employer, and controlling employer on a site, based on their role and knowledge.
- ISO 14001
- International standard for environmental management systems, requiring an aspect and impact register, compliance obligations, objectives, operational controls, monitoring, and management review.
- Aspect versus impact
- An environmental aspect is an activity element that interacts with the environment; the impact is the resulting change to the environment, such as air emissions or resource depletion.
- TRI Form R
- EPCRA Section 313 Toxic Release Inventory report on releases and waste management, filed annually by July 1 for the preceding calendar year.
- RCRA generator categories
- Hazardous waste generator classes by monthly output: very small under 100 kg, small 100 to 1,000 kg, large over 1,000 kg, each with distinct accumulation limits.