BCxA Certified Commissioning Professional (CCP) study materials
BCxA Certified Commissioning Professional (CCP) study resources

BCxA Certified Commissioning Professional (CCP) study plan

BCxA Certified Commissioning Professional (CCP) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Commissioning Fundamentals and Program Planning & Functional Performance Testing and Test Procedures

  • Define the commissioning process and list its phases, key activities, and deliverables from pre-design through occupancy.

  • Compare commissioning roles and responsibilities for owner, commissioning authority (CxA), design team, contractor, and subcontractors.

  • Explain how commissioning scope is determined using risk-based factors and project characteristics.

  • Identify the purpose and basic content of the Owner's Project Requirements (OPR) and Basis of Design (BOD) as inputs to functional testing.

  • Describe the sequence of functional performance testing from pre-functional checklists through seasonal testing.

Your checkpoint

Create a one-page commissioning process flowchart with role annotations and a 10-item glossary of key commissioning terms.

Week 2

Owner's Project Requirements and Basis of Design & Design Review and Pre-Construction Commissioning Activities

  • Draft a model OPR outline that includes measurable energy, indoor environmental quality, and operational goals.

  • Evaluate a sample BOD against OPR requirements to identify gaps and inconsistencies.

  • Explain the purpose and timing of design reviews and constructability reviews in the commissioning process.

  • List pre-construction commissioning activities such as commissioning scope in specifications, pre-bid meeting, and contractor commissioning plan requirements.

  • Describe how to review design documents for commissioning-related issues like accessibility, test ports, and controls sequences.

Your checkpoint

Produce a two-page design review checklist with at least 15 items tied to OPR and BOD verification.

Week 3

Construction-Phase Commissioning and Installation Verification & Functional Performance Testing and Test Procedures

  • Outline the construction-phase commissioning activities from submittal review through installation verification.

  • Explain the purpose and process of pre-functional checklists and startup verification.

  • Develop a functional performance test procedure for a simple air-handling unit, including prerequisites, steps, acceptance criteria, and documentation.

  • Identify common installation deficiencies and how to document them during verification.

  • Describe how test procedures are reviewed and approved before execution.

Your checkpoint

Write a complete functional test procedure for an air-handling unit with at least 10 test steps and pass/fail criteria.

Week 4

Functional Performance Testing and Test Procedures & Issues Management, Deficiency Resolution, and Acceptance

  • Differentiate between functional performance tests, pre-functional checks, and seasonal testing.

  • Explain the issue resolution process from identification through documentation, correction, and retesting.

  • Describe how to classify deficiencies and track them in an issues log.

  • Outline the acceptance process and the role of the commissioning report.

  • Apply lessons learned from sample test failures to adjust test procedures.

Your checkpoint

Create a deficiency tracking log template with fields for issue description, responsible party, due date, and retest results.

Week 5

Commissioning Specifications, Contracts, and Procurement & Systems Manuals, Training, and Handover

  • Identify key commissioning specification sections and their required content, including roles, testing, and documentation.

  • Explain how commissioning requirements are incorporated into contracts and procurement documents.

  • Describe the contents and purpose of systems manuals and how they support operation and maintenance.

  • Outline the training requirements for owner staff and how to verify training effectiveness.

  • Explain the handover process including as-built documentation, warranties, and final commissioning report.

Your checkpoint

Draft a commissioning specification outline for a simple project with at least 8 sections and a training verification checklist.

Week 6

Ongoing and Retro-Commissioning & Commissioning Fundamentals and Program Planning

  • Define ongoing commissioning and retro-commissioning and distinguish them from initial commissioning.

  • Explain the retro-commissioning process from planning through implementation and persistence.

  • Identify common opportunities for energy and operational improvements in existing buildings.

  • Describe how to plan a commissioning program for a portfolio of buildings.

  • Review commissioning fundamentals and program planning concepts to reinforce earlier learning.

Your checkpoint

Develop a one-page retro-commissioning project plan outline including scope, phases, and key performance indicators.

Week 7

Owner's Project Requirements and Basis of Design & Construction-Phase Commissioning and Installation Verification & Functional Performance Testing and Test Procedures

  • Integrate OPR, BOD, and design review findings into a cohesive commissioning plan.

  • Create a construction-phase verification checklist that ties installation verification to functional test readiness.

  • Develop a test procedure for a central plant system that includes safety prerequisites and acceptance criteria.

  • Practice writing clear, measurable acceptance criteria for functional tests.

  • Simulate a design review and document at least five potential commissioning issues.

Your checkpoint

Assemble a mock commissioning plan for a small office building covering OPR, BOD, design review, and testing phases.

Week 8

Issues Management, Deficiency Resolution, and Acceptance & Systems Manuals, Training, and Handover & Ongoing and Retro-Commissioning

  • Review the issue resolution and acceptance process and apply it to a case study.

  • Explain the components of a complete handover package and how to verify its completeness.

  • Describe how to transition from commissioning to ongoing commissioning.

  • Complete a full-length practice exam under timed conditions.

  • Review incorrect practice exam answers and map them to domain weaknesses for final study.

Your checkpoint

Complete a 100-question practice exam with a score of at least 75% and a written list of five weak areas with corrective actions.

Milestones

Week 2: Can explain the relationship between OPR and BOD and list at least five common design review findings.

Week 4: Can write a functional test procedure from scratch and describe the deficiency resolution process without notes.

Week 6: Can compare initial commissioning and retro-commissioning and outline a retro-commissioning plan.

Week 8: Score at least 75% on a timed practice exam and identify three areas for continued improvement.