BTEB Amin Survey Exam study materials
BTEB Amin Survey Exam study resources

BTEB Amin Survey Exam cheat sheet

BTEB Amin Survey Exam · Keep the key ideas within reach.

Quick reference

Surveying Fundamentals and Chain Surveying

  • Surveying is the art of determining relative positions of points on, above, or beneath the earth's surface; plane surveying ignores earth curvature and is valid for areas under about 250 km².

  • Principles: work from whole to part (fix control first, then detail), and locate a new station by at least two independent measurements from known points.

  • Chain units: 1 Gunter's chain = 66 ft = 100 links; 1 engineer's chain = 100 ft; 1 link = 0.66 ft = 0.2012 m; 1 m = 1.515 links.

  • Ranging: direct ranging by eye when both ends are intervisible; indirect ranging (reciprocal) when ends are not intervisible or the line crosses a hill.

  • Chain corrections: temperature Ct = L·α·(Tm − T0); pull Cp = L(P − P0)/(AE); sag Cs = −(w²l³)/(24P²) per span; slope correction = L(1 − cos θ).

  • Errors: positive (cumulative) errors arise from chain too long, sag-free pull too great, or slope not corrected; random errors cancel and are called compensating.

  • Obstacles: for a river, use similar triangles or the sine rule from a subsidiary base; for a building, offset the chain line and re-establish by equal perpendiculars.

  • Cross-staff, optical square, and prism square set out 90° offsets; the optical square uses two mirrors at 45° and gives a double-reflection right angle.

  • Field book entries: all measurements in the same units, sketches to scale, offsets recorded from the chain line with left/right indicated; never erase - score out and re-enter.

Quick reference

Compass and Theodolite Traversing

  • True bearing = magnetic bearing ± magnetic declination (east declination added, west subtracted); magnetic bearing = true bearing ∓ declination.

  • Whole-circle bearing (WCB) is measured clockwise from magnetic north, 0°–360°; reduced bearing (RB) is the acute angle from the nearer end of the meridian, 0°–90°.

  • Interior angle = FB of next line − FB of previous line; if negative add 360°; the sum of interior angles = (2n − 4) × 90°.

  • Fore bearing − back bearing = 0° if the difference is 0°, or ±180° if the difference is 180°; a difference other than 0° or 180° indicates local attraction.

  • Local attraction is detected by FB − BB ≠ 180°; correct by adjusting the line free from attraction first, then applying the same correction to all bearings at that station.

  • Theodolite: telescope transits (flips) about the horizontal axis; the vertical circle reads zenith angles or elevation; face left and face right readings average out collimation error.

  • Traverse closing error e = √(ΣL² + ΣD²); relative precision = e / perimeter; Bowditch (compass) rule distributes error proportional to leg length; transit rule proportional to latitude/departure.

  • Latitude = l·cos θ, departure = l·sin θ; ΣL and ΣD must both be zero for a closed traverse; the closing line has length e and bearing atan(ΣD/ΣL).

  • Angular error of a closed traverse = measured sum − (2n − 4)·90°; distribute equally with opposite sign, or by the least-squares method for precise work.

Quick reference

Levelling and Contouring

  • Reduced level (RL) = height of instrument (HI) − staff reading; HI = RL of benchmark + backsight reading.

  • Height of Collimation method: one HI per instrument setup, suitable for many intermediate sights; Rise and Fall method checks ΣBS − ΣFS = ΣRise − ΣFall = last RL − first RL.

  • Arithmetic check: ΣBS − ΣFS = last RL − first RL; also ΣBS − ΣFS = ΣRise − ΣFall; both must agree.

  • Curvature correction = 0.0785 D² m (D in km); refraction correction = −0.0112 D² m; combined correction = −0.0673 D² m, always subtractive.

  • Sensitiveness of a level bubble: angular sensitivity α ≈ (d/R)·206265 seconds, where d is bubble movement and R the tube radius.

  • Reciprocal levelling eliminates refraction, curvature, and collimation error; it is used across wide rivers or valleys.

  • Contour interval is the vertical distance between successive contours; it is constant on a map, while the horizontal spacing varies with slope.

  • Characteristics: contours of equal elevation never cross (except at an overhanging cliff), are closed loops or run to the map edge, and are closest where the ground is steepest.

  • Contour uses: route selection, reservoir capacity by the contour-area method, earthwork estimation, and drainage pattern interpretation (V pointing upstream in valleys).

Quick reference

Plane Table Surveying and Minor Instruments

  • Plane table parts: tripod, drawing board, alidade (plain or telescopic), plumbing fork with plumb bob, spirit level, and compass for orientation.

  • Orientation is setting the table so all lines are parallel to their ground counterparts; by backsight (tracing) or by magnetic needle when no suitable backsight exists.

  • Methods: radiation (from one station, rays to all points), intersection (two stations, no linear measurement), traversing (chain plus plane table), and resection (three-point problem).

  • Three-point problem: locate the table station from three known points; the Lehmann method uses the triangle of error; Bessel's method solves it by a graphical construction.

  • Two-point problem: locate a station using two known points plus a compass or a subsidiary station; used when the station is inaccessible.

  • The alidade's fiducial edge passes through the plotted station; sight lines are drawn along it, so the table must not be rotated after orientation.

  • Minor instruments: clinometer (slope angle), Abney level (slope and elevation), hand level, box sextant (angles up to 120°), and planimeter (area).

  • Planimeter: area = M × (final reading − initial reading); the zero circle is the area traced when the roller passes over the pole; set the index to zero before use.

  • Errors in plane table work: table not level, orientation error, alidade not centred, and the table not truly centred over the station.

Quick reference

Area and Volume Computation

  • Trapezoidal rule: A = d[(O1 + On)/2 + O2 + O3 + … + On−1]; Simpson's rule (odd number of ordinates): A = d/3[(O1 + On) + 4(sum of even ordinates) + 2(sum of odd ordinates)].

  • Simpson's rule requires an even number of intervals (odd number of ordinates); for an odd number of intervals, apply Simpson's to all but the last and trapezoidal to the last.

  • Area by coordinates (shoelace): 2A = Σ(xi·yi+1 − xi+1·yi) taken cyclically; the sign gives orientation, magnitude gives area.

  • Area by triangles: A = ½ab·sin C; by sides, Heron's formula A = √[s(s−a)(s−b)(s−c)] with s = (a+b+c)/2.

  • Prismoidal rule: V = d/3[A1 + An + 4(A2 + A4 + …) + 2(A3 + A5 + …)]; the prismoidal correction = (d/6)(A1 − A2) for a two-section prismoid.

  • Trapezoidal volume: V = d[(A1 + An)/2 + A2 + … + An−1]; it overestimates for convex sections, prismoidal is more accurate.

  • End-area method uses only the end areas; mean-area method uses the average of end areas × length; the prismoidal formula is the standard for earthwork.

  • Earthwork by the contour-area method: V = Σ[(A1 + A2)/2] × contour interval; used for reservoir capacity.

  • Cross-section area: for a level section A = h(b + sh); for a three-level section A = ½h(b + s·h) plus side triangles; side slopes s:1.

Quick reference

Setting Out

  • Setting out transfers design positions from drawings to the ground; horizontal control uses theodolite/total station, vertical control uses levels.

  • Setting out a building: establish two reference lines from a baseline, set out the first corner by coordinates, then use 3-4-5 right angles or a theodolite to fix the other corners.

  • Setting out a curve: by offsets from the long chord, by offsets from the tangent, by deflection angles, or by the chord-basis method; radius R = (C/2)/sin(Δ/2).

  • Simple circular curve: tangent length T = R·tan(Δ/2); length L = R·Δ (radians); external distance E = R[sec(Δ/2) − 1]; mid-ordinate M = R[1 − cos(Δ/2)].

  • Deflection angle per chord = (c/2R)·206265 seconds; the total deflection to the end of the curve equals Δ/2.

  • Transition curve: length Ls = V³/(CR) (C ≈ 80 for highways), or by rate of change of centrifugal acceleration; the spiral shifts the circular curve inward by shift S = Ls²/(24R).

  • Setting out a pipeline or sewer: use a laser level or total station; gradients set by sighting a target at the required fall, or by boning rods.

  • Setting out on sloping ground: use a level and staff to fix a constant height of collimation, or a clinometer for batter boards.

  • Checks: measure the diagonals of a set-out rectangle (they must be equal); re-observe the closing angle and compare with the design value.

Quick reference

Survey Records

  • Field book: bound, numbered pages, entries in hard pencil (2H–4H), no erasures; wrong entries are struck through with a single line and the correct value written above.

  • Chain survey field book: a sketch of the chain line and offsets to scale, with all measurements in the same unit; offsets from the chain line are recorded left or right.

  • Levelling field book: columns for station, backsight, intermediate sight, foresight, rise, fall, HI, and RL; arithmetic checks are recorded at the bottom of each page.

  • Theodolite field book: station, face (left/right), horizontal circle readings, vertical circle readings, and mean values; the mean of face left and face right eliminates collimation error.

  • Traverse record: station, line, length, fore bearing, back bearing, and a note of local attraction; the closing error is computed on the last line.

  • Plane table record: plotted sheet with station names, orientation notes, and a separate field book for radiation/intersection observations.

  • Permanent records: a survey report includes the benchmark list, control coordinates, datum, instrument calibration, and a signed plan.

  • Digital records: total station and GNSS data are downloaded daily, backed up, and the raw file kept unedited; the processed file is a separate copy.

  • Legal records: a plan for registration must show the datum, units, area, boundary dimensions, and the surveyor's signature and date.

Quick reference

Drafting and Professional Practice

  • Scale: representative fraction (RF) = map distance / ground distance; 1:1000 means 1 mm on the map = 1 m on the ground.

  • A scale is large if the RF is large (1:100), small if the RF is small (1:10,000); a diagonal scale reads to a second decimal place.

  • Plan versus map: a plan is a large-scale drawing (RF ≥ 1:1000) of a small area; a map is a small-scale drawing of a large area.

  • Contour plan conventions: contours are brown, water features blue, buildings and roads black, and the contour interval is stated in the legend.

  • Drawing standards: title block with project name, client, scale, date, drawing number, and surveyor's name; north arrow and legend on every plan.

  • Professional ethics: a surveyor must not accept work outside competence, must disclose conflicts of interest, and must keep client data confidential.

  • Boundary surveys: the surveyor reports measurements and discrepancies, cannot give legal title advice, and must record the datum and the method used.

  • Quality control: close the traverse and level loop, check with independent measurements, and keep calibration certificates for levels and total stations.

  • Safety and liability: surveyors are liable for negligent misstatement; professional indemnity insurance covers errors and omissions in survey reports.