BTEB Amin Survey Exam study plan
BTEB Amin Survey Exam · Give each week a clear focus.
8 weeks · About 6 hours per week
Surveying Fundamentals and Chain Surveying
Define the principles of surveying and classify surveys by purpose and by instrument used
Compute chain or tape corrections for standardization, temperature, slope, and sag, showing each step
Derive the correction for slope and apply it to convert measured slope lengths into horizontal distances
Solve problems on ranging a line, chaining on sloping ground, and chaining across obstacles such as a river or a building
Your checkpoint
A one-page correction formula sheet with five fully worked numerical examples covering each correction type
Surveying Fundamentals and Chain Surveying
Describe the components and adjustment checks of a chain survey network including base lines, tie lines, and check lines
Apply the conditions for a well-conditioned triangle and select suitable stations for a chain survey
Compute offsets to objects and record them in a field book using the standard offset notation
Detect and correct closing error in a chain traverse using the given field measurements
Your checkpoint
A hand-drawn chain survey map of a small plot with a full field book transcription and a closing-error check
Compass and Theodolite Traversing
Explain magnetic declination, dip, and the difference between true, magnetic, and grid bearings
Convert between whole-circle bearing and quadrantal bearing in both directions without error
Compute included angles from observed bearings and apply the local attraction correction to a closed traverse
State the fundamental differences between a prismatic compass and a surveyor's compass
Your checkpoint
A completed local attraction correction table for a five-sided closed compass traverse with all corrected bearings and included angles
Compass and Theodolite Traversing
Identify the parts and functions of a transit theodolite and list the permanent adjustments
Describe the procedure for measuring a horizontal angle by the repetition and reiteration methods
Compute the latitude, departure, and closing error of a theodolite traverse and apply the Bowditch rule to adjust coordinates
Calculate the area of a closed traverse from its adjusted coordinates using the coordinate method
Your checkpoint
A full theodolite traverse adjustment sheet with latitudes, departures, corrections, adjusted coordinates, and computed area
Levelling and Contouring
Differentiate temporary and permanent adjustments of a level and state the two-peg test procedure
Reduce a level field book by both the height of instrument method and the rise and fall method and verify the arithmetic check
Compute the reciprocal leveling result across a wide river and explain refraction and curvature corrections
Interpret contour maps to identify ridges, valleys, saddles, and steep slopes and select a grade line between two points
Your checkpoint
A reduced leveling field book in both methods with arithmetic checks and a hand-drawn contour map of a small area at a stated interval
Plane Table Surveying and Minor Instruments
Explain the principles of plane table surveying and compare the four methods of resection and intersection
Describe the three-point problem and solve it by the trial and error and Bessel methods
List the uses and adjustment procedures of minor instruments such as the clinometer, planimeter, and pentagraph
Compute the area of an irregular figure from a planimeter reading using the zero circle and multiplier
Your checkpoint
A worked solution to a three-point problem on a plotted sheet with the orientation point located and verified
Area and Volume Computation, Setting Out
Compute the area of a irregular boundary using the trapezoidal rule, Simpson's rule, and the coordinate method and compare results
Compute earthwork volumes by the mid-section, trapezoidal, and prismoidal formulas and state when each applies
Calculate the volume of a reservoir from a contour map using the prismoidal and average end area methods
Set out a simple circular curve by offsets from the long chord and by the deflection angle method
Your checkpoint
A volume computation report for a borrow pit and a canal segment using at least two methods with a comparison note
Survey Records, Drafting and Professional Practice & Area and Volume Computation, Setting Out
Prepare a complete survey report with field data, computations, results, and a plan drawing to a stated scale
Apply drafting conventions for scales, north arrows, titles, and symbols on a survey drawing
Outline professional duties and ethical obligations of a surveyor including accuracy, safety, and record keeping
Set out a building foundation plan from given coordinates and check the diagonals for squareness
Your checkpoint
A complete mock survey project report with drawing, computations, and a one-page setting out record for a building footprint
Milestones
Week 2: Score at least 70 percent on a 20-question self-test covering chain corrections and chain survey network checks
Week 4: Complete a closed theodolite traverse adjustment with closing error under the stated tolerance and a correct Bowditch correction
Week 6: Reduce a 10-setup leveling field book with zero arithmetic check discrepancy and solve one three-point problem unaided
Week 8: Submit a full mock survey report that meets all drafting conventions and passes a self-marked 40-question mixed-domain test at 75 percent or above