BTEB Amin Survey Exam study materials
BTEB Amin Survey Exam study resources

BTEB Amin Survey Exam study plan

BTEB Amin Survey Exam · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Surveying Fundamentals and Chain Surveying

  • Define the principles of surveying and classify surveys by purpose and by instrument used

  • Compute chain or tape corrections for standardization, temperature, slope, and sag, showing each step

  • Derive the correction for slope and apply it to convert measured slope lengths into horizontal distances

  • Solve problems on ranging a line, chaining on sloping ground, and chaining across obstacles such as a river or a building

Your checkpoint

A one-page correction formula sheet with five fully worked numerical examples covering each correction type

Week 2

Surveying Fundamentals and Chain Surveying

  • Describe the components and adjustment checks of a chain survey network including base lines, tie lines, and check lines

  • Apply the conditions for a well-conditioned triangle and select suitable stations for a chain survey

  • Compute offsets to objects and record them in a field book using the standard offset notation

  • Detect and correct closing error in a chain traverse using the given field measurements

Your checkpoint

A hand-drawn chain survey map of a small plot with a full field book transcription and a closing-error check

Week 3

Compass and Theodolite Traversing

  • Explain magnetic declination, dip, and the difference between true, magnetic, and grid bearings

  • Convert between whole-circle bearing and quadrantal bearing in both directions without error

  • Compute included angles from observed bearings and apply the local attraction correction to a closed traverse

  • State the fundamental differences between a prismatic compass and a surveyor's compass

Your checkpoint

A completed local attraction correction table for a five-sided closed compass traverse with all corrected bearings and included angles

Week 4

Compass and Theodolite Traversing

  • Identify the parts and functions of a transit theodolite and list the permanent adjustments

  • Describe the procedure for measuring a horizontal angle by the repetition and reiteration methods

  • Compute the latitude, departure, and closing error of a theodolite traverse and apply the Bowditch rule to adjust coordinates

  • Calculate the area of a closed traverse from its adjusted coordinates using the coordinate method

Your checkpoint

A full theodolite traverse adjustment sheet with latitudes, departures, corrections, adjusted coordinates, and computed area

Week 5

Levelling and Contouring

  • Differentiate temporary and permanent adjustments of a level and state the two-peg test procedure

  • Reduce a level field book by both the height of instrument method and the rise and fall method and verify the arithmetic check

  • Compute the reciprocal leveling result across a wide river and explain refraction and curvature corrections

  • Interpret contour maps to identify ridges, valleys, saddles, and steep slopes and select a grade line between two points

Your checkpoint

A reduced leveling field book in both methods with arithmetic checks and a hand-drawn contour map of a small area at a stated interval

Week 6

Plane Table Surveying and Minor Instruments

  • Explain the principles of plane table surveying and compare the four methods of resection and intersection

  • Describe the three-point problem and solve it by the trial and error and Bessel methods

  • List the uses and adjustment procedures of minor instruments such as the clinometer, planimeter, and pentagraph

  • Compute the area of an irregular figure from a planimeter reading using the zero circle and multiplier

Your checkpoint

A worked solution to a three-point problem on a plotted sheet with the orientation point located and verified

Week 7

Area and Volume Computation, Setting Out

  • Compute the area of a irregular boundary using the trapezoidal rule, Simpson's rule, and the coordinate method and compare results

  • Compute earthwork volumes by the mid-section, trapezoidal, and prismoidal formulas and state when each applies

  • Calculate the volume of a reservoir from a contour map using the prismoidal and average end area methods

  • Set out a simple circular curve by offsets from the long chord and by the deflection angle method

Your checkpoint

A volume computation report for a borrow pit and a canal segment using at least two methods with a comparison note

Week 8

Survey Records, Drafting and Professional Practice & Area and Volume Computation, Setting Out

  • Prepare a complete survey report with field data, computations, results, and a plan drawing to a stated scale

  • Apply drafting conventions for scales, north arrows, titles, and symbols on a survey drawing

  • Outline professional duties and ethical obligations of a surveyor including accuracy, safety, and record keeping

  • Set out a building foundation plan from given coordinates and check the diagonals for squareness

Your checkpoint

A complete mock survey project report with drawing, computations, and a one-page setting out record for a building footprint

Milestones

Week 2: Score at least 70 percent on a 20-question self-test covering chain corrections and chain survey network checks

Week 4: Complete a closed theodolite traverse adjustment with closing error under the stated tolerance and a correct Bowditch correction

Week 6: Reduce a 10-setup leveling field book with zero arithmetic check discrepancy and solve one three-point problem unaided

Week 8: Submit a full mock survey report that meets all drafting conventions and passes a self-marked 40-question mixed-domain test at 75 percent or above