BTEB Diploma in Textile Engineering Examination · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Textile Raw Materials and Fibre Science

  • Classify natural and man-made fibres by origin, chemical composition and generic name, and write a one-line identification note for each of at least 15 fibres.

  • Draw and label the morphological structure (cuticle, cortex, medulla for hair fibres; skin, lumen for cotton) of four major fibres from memory.

  • Relate fibre length, fineness, crimp and maturity to the yarn properties they influence, listing at least three consequences per parameter.

  • Solve five numerical problems on fibre fineness (denier, tex, decitex) and moisture regain conversions, showing every step.

Your checkpoint

A hand-written fibre identification chart covering 15 fibres (origin, composition, key properties, typical end use) plus worked solutions to five fineness/regain numericals.

Week 2

Yarn Manufacturing (Spinning)

  • Sequence the blow-room to ring-frame flow and state the purpose and waste extracted at each machine.

  • Explain the carding action between flats and cylinder and calculate draft and production for a carding machine using given feed and delivery speeds.

  • Compare ring, rotor and air-jet spinning on speed, yarn structure and suitable count range in a table you construct yourself.

  • Compute twist per inch from twist multiplier and count, and total draft across a draw-frame with given sliver and delivery hank.

  • Identify five common spinning defects (neps, slubs, thick and thin places, hairiness) and trace each to its likely machine stage.

Your checkpoint

A one-page spinning flow diagram with draft and production calculations for carding, drawing and ring frames, plus a defect-cause table of five entries.

Week 3

Fabric Manufacturing (Weaving and Knitting)

  • Describe the primary motions of a loom (shedding, picking, beating-up) and the secondary motions (take-up, let-off) with the function of each.

  • Sketch and label the path of warp yarn through a loom from warp beam to cloth roller, naming every element in order.

  • Distinguish weft-knitted (plain, rib, interlock) from warp-knitted structures by loop formation and stretch behaviour.

  • Calculate fabric cover factor, ends per inch and picks per inch from given construction data, and compute fabric weight in grams per square metre.

  • Explain four common woven fabric defects (missing pick, broken end, float, warp streak) and their probable causes.

Your checkpoint

A labelled loom warp-path sketch plus a construction calculation sheet (cover factor, EPI, PPI, GSM) for three given fabric samples.

Week 4

Wet Processing (Dyeing, Printing and Finishing)

  • Explain the preparatory processes (singeing, desizing, scouring, bleaching, mercerising) with the purpose and one key parameter of each.

  • Classify dyes (reactive, vat, direct, acid, disperse, basic) by fibre affinity and describe the dye-fibre bonding mechanism for reactive and vat dyes.

  • Outline the screen printing and rotary printing methods and compare them on production rate, design detail and cost.

  • Describe five mechanical and chemical finishes (calendering, sanforising, resin finish, water repellency, flame retardancy) and the property each changes.

  • Calculate dye and chemical recipe quantities for a given batch weight in kilograms and liquor ratio.

Your checkpoint

A wet-processing route card for a cotton fabric (grey to finished) naming each stage, its purpose and key parameters, plus three recipe calculations.

Week 5

Garment Manufacturing and Apparel Production & Textile Testing and Quality Control

  • Sequence the garment production line from pattern making and marker planning through cutting, sewing and finishing, stating the output of each section.

  • Compute fabric consumption per garment from given marker width, garment size and fabric width, and calculate marker efficiency.

  • Select the correct test method concept for count, strength, elongation, crimp, shrinkage and colour fastness, and state what each test measures.

  • Interpret given test data against a specification and decide pass or fail, explaining the reasoning.

  • Distinguish the roles of quality control and quality assurance in a garment factory with one concrete example of each.

Your checkpoint

A garment consumption and marker-efficiency calculation sheet plus a quality inspection report judging five given test results against specification with pass/fail decisions.

Week 6

Textile Machinery and Maintenance & Industrial Management, Costing and Entrepreneurship

  • Describe the function and typical maintenance schedule (daily, weekly, monthly) for three key machines: card, ring frame and loom.

  • Distinguish preventive, breakdown and predictive maintenance, and list the cost consequence of each if neglected.

  • Compute a simple cost sheet for a yarn lot covering raw material, power, labour and overhead, and derive cost per kilogram.

  • Calculate break-even quantity and margin from given fixed cost, variable cost and selling price.

  • Outline the main functions of management (planning, organising, leading, controlling) applied to a textile unit, and list three traits of an entrepreneur in the sector.

Your checkpoint

A machine maintenance schedule table for three machines plus a complete cost sheet and break-even calculation for a given yarn lot.

Week 7

Computer Applications and CAD in Textiles & Occupational Health, Safety and Environmental Protection

  • Identify the textile applications of CAD in fabric design, marker making and colour matching, and state one benefit of each over manual work.

  • Use a spreadsheet to build a small production or costing calculator, entering formulas for at least three derived values.

  • List the main hazards in spinning, weaving and dyeing sections (dust, noise, moving parts, chemicals) and match each to a control measure.

  • Explain the purpose of personal protective equipment and the correct use of at least four items in a dye house.

  • Outline effluent treatment steps in a wet-processing plant and state the environmental risk of untreated dye liquor discharge.

Your checkpoint

A spreadsheet-based costing or production calculator with working formulas, plus a hazard-control matrix covering at least eight hazards across three departments.

Week 8

Industrial Attachment and Project Work & Textile Raw Materials and Fibre Science & Yarn Manufacturing (Spinning) & Fabric Manufacturing (Weaving and Knitting) & Wet Processing (Dyeing, Printing and Finishing) & Garment Manufacturing and Apparel Production & Textile Testing and Quality Control

  • Consolidate the full syllabus into a one-page revision map linking each domain to its key formulas and definitions.

  • Write a structured project or attachment report outline (objectives, methodology, observations, conclusions) for a chosen textile topic.

  • Complete a timed mock paper across all domains and score it against an answer key, recording weak areas.

  • Re-drill every formula from weeks 1 to 6 (draft, twist, cover factor, GSM, consumption, cost, break-even) without notes.

  • Review and correct all weak areas flagged in the mock within the final study hours.

Your checkpoint

A one-page formula and definition revision map, a project report outline, and a scored mock paper with a written list of corrected weak areas.

Milestones

Week 2: Can state the purpose and waste extracted at every spinning stage and correctly solve a carding draft and production problem unaided.

Week 4: Can draw the loom warp path from memory and complete cover factor, GSM and dye recipe calculations with correct units.

Week 6: Scores at least 60 percent on a self-set 30-question quiz covering domains 1 to 6, with all calculation errors corrected.