BTEB Plumbing study materials
BTEB Plumbing study resources

BTEB Plumbing study plan

BTEB Plumbing · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Plumbing systems and installation

  • Diagram a complete potable water supply system from meter to fixture, labeling the service line, main, risers, branches, and fixture stops

  • Explain the roles of pressure, gravity, and pump-assisted supply in low-rise versus high-rise buildings

  • Identify the functions of key valves (gate, globe, check, pressure-reducing, tempering) and state where each is installed

  • Convert between pipe sizes and flow expectations for common fixture groups using a simple sizing table you build yourself

Your checkpoint

A hand-drawn single-line supply schematic for a two-storey house with a labeled component legend of at least 15 parts

Week 2

Plumbing systems and installation & Plumbing safety, codes and estimating

  • Assemble the sequence of steps for installing and pressure-testing a new supply rough-in

  • Describe correct procedures for hot water cylinder installation, including expansion control and temperature limits

  • List the personal protective equipment and isolation steps required before opening a pressurized line

  • Summarize the code requirements for backflow prevention and cross-connection control in your jurisdiction

Your checkpoint

A one-page rough-in and testing checklist with at least 20 sequential steps, cross-referenced to safety controls

Week 3

Pipe materials, fittings and jointing

  • Compare copper, PEX, CPVC, galvanized steel, and PVC on pressure rating, temperature limit, joining method, and typical use

  • Demonstrate (or write out step by step) soldering copper, solvent-welding PVC, and making a crimp or press PEX joint

  • Select the correct fittings (elbow, tee, reducer, coupling, union, adapter) for a given layout change

  • Explain how thermal expansion, water hammer, and dissimilar-metal contact affect each material and how to mitigate them

Your checkpoint

A material selection matrix covering five pipe types against six criteria, plus a written procedure for three jointing methods with cure or cooling times

Week 4

Pipe materials, fittings and jointing & Sanitary fixtures and drainage

  • Size drain, waste, and vent lines for a bathroom group using fixture units and slope rules

  • Lay out a venting arrangement that satisfies trap arm distance and vent termination requirements

  • Match trap types and sizes to fixtures, and explain the purpose of the water seal

  • Identify the fittings permitted on drainage versus vent piping and explain why sanitary tees are restricted on horizontal drains

Your checkpoint

A DWV isometric for one bathroom group with fixture-unit calculations, pipe sizes, slopes, and vent routing annotated

Week 5

Sanitary fixtures and drainage

  • Specify minimum clearances, rough-in dimensions, and mounting heights for toilets, lavatories, sinks, and showers

  • Describe the installation sequence for a water closet flange, wax seal, and fixture set-out

  • Explain grease interceptor, floor drain, and cleanout placement rules for kitchens and basements

  • Outline accessibility requirements for grab bars, controls, and clear floor space in sanitary facilities

Your checkpoint

A fixture rough-in schedule listing at least eight fixtures with supply height, drain height, clearance, and vent size

Week 6

Plumbing safety, codes and estimating

  • Interpret the code sections that govern venting, trap seals, and water supply protection, and cite them from memory

  • Apply trench, shoring, and confined-space entry rules to a described site scenario

  • Explain the hazards of lead, solder flux fumes, sewer gas, and hot work, and the controls for each

  • Describe the process for obtaining an inspection at rough-in, top-out, and final stages

Your checkpoint

A safety and compliance audit sheet with 15 checkpoints, each tied to a code clause or regulation and a control measure

Week 7

Plumbing safety, codes and estimating & Plumbing systems and installation

  • Measure and take off quantities for a small bathroom project from a dimensioned sketch you draw

  • Price labor, materials, fittings, and waste allowance to produce a total estimate with a contingency line

  • Build a simple schedule showing task sequence, duration, and dependencies for a two-week installation

  • Identify which items drive cost overruns and how to document variations

Your checkpoint

A complete takeoff and cost estimate for a bathroom remodel, including a bill of quantities and labor hours breakdown

Week 8

Plumbing systems and installation & Pipe materials, fittings and jointing & Sanitary fixtures and drainage & Plumbing safety, codes and estimating

  • Complete two full-length timed practice exams and score each domain separately

  • Re-teach your three weakest topics in writing without notes, then verify against source material

  • Redo every previously missed calculation (sizing, slope, fixture units, takeoff) until error-free

  • Finalize a one-page formula and code-reference sheet for exam-day review

Your checkpoint

A scored practice exam log with domain breakdown plus a corrected error journal and final one-page reference sheet

Milestones

Week 2: Can draw and explain a full supply system and recite the rough-in testing sequence without notes

Week 4: Scores at least 70 percent on a self-made 30-question quiz covering domains 1 and 2

Week 6: Correctly sizes a DWV layout and cites the governing code clauses for venting and trap seals

Week 7: Produces a takeoff and estimate within 10 percent of a reference answer you build from your own measurements

Week 8: Scores at least 75 percent overall on timed practice exams with no domain below 65 percent