BD Deck Officer Class 2 (Chief Mate) study materials
BD Deck Officer Class 2 (Chief Mate) study resources

BD Deck Officer Class 2 (Chief Mate) study plan

BD Deck Officer Class 2 (Chief Mate) · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Navigation (terrestrial, celestial, electronic and passage planning)

  • Derive a celestial line of position from a sextant altitude, assumed position, and almanac data, showing every step and the intercept.

  • Compute a terrestrial position fix from three simultaneous bearings and a running fix from two bearings taken on different courses.

  • Explain how to verify compass error by amplitude and azimuth methods and calculate the resulting deviation and variation.

  • Construct a day's passage plan between two arbitrary coastal positions, including waypoints, course to steer, distance, ETA, and under-keel clearance checks.

Your checkpoint

A 12-problem navigation workbook with fully worked solutions: 4 celestial lines of position, 4 terrestrial fixes, and 4 compass-error calculations, self-marked at ≥80% accuracy, plus a one-page error log.

Week 2

Navigation (terrestrial, celestial, electronic and passage planning) & Ship stability, ship construction and damage control

  • Set up an ECDIS route and appraise route safety against a stated safety contour, safety depth, and no-go areas.

  • Compare the limitations of GNSS, radar, and ECDIS in coastal pilotage and list at least three failure modes with mitigations.

  • Calculate initial and final metacentric heights from a loading condition and interpret the result against a stated minimum stability criterion.

  • Solve three statical stability curve problems: determine range of stability, angle of maximum GZ, and effect of adding a weight high on the vessel.

Your checkpoint

A route-appraisal and stability portfolio containing one ECDIS route safety checklist with 10 checks, three fully worked KG/GM and GZ problems, and an arithmetic error log.

Week 3

Cargo handling, stowage and care of cargoes & Ship stability, ship construction and damage control

  • Produce a cargo stowage plan for a mixed general-cargo consignment, assigning slots by weight, compatibility, and port rotation.

  • Calculate the effects of a partially filled tank and a suspended weight on stability, stating the correction applied in each case.

  • Explain the structural members and load paths of a bulk carrier and identify three stress concentrations during heavy cargo discharge.

  • Evaluate damage-control actions for a two-compartment flooding case, including the effect on trim, list, and reserve buoyancy.

Your checkpoint

A stowage and damage-control pack: one annotated stowage plan for 20 cargo units, one flooding calculation sheet with trim and list results, and a 10-point pre-discharge structural check.

Week 4

Ship stability, ship construction and damage control & Controlling the operation of the ship and care for persons on board

  • Analyze a damaged-stability scenario from a stated set of tank soundings and produce the final list, trim, and freeboard.

  • Outline the master's responsibilities for vessel stability and watertight integrity during ballast exchange and cargo operations.

  • Design a weekly on-board safety and familiarization drill schedule covering fire, abandon-ship, and enclosed-space entry.

  • Evaluate fatigue, workload, and rest-hour rules against a two-week watch schedule and identify compliance gaps.

Your checkpoint

A milestone assessment: closed-book 25-item mixed set on Domains 3 and 4, scored ≥80%, with a corrected error log and a one-page damage-control decision flow.

Week 5

Cargo handling, stowage and care of cargoes & Controlling the operation of the ship and care for persons on board

  • Inspect a cargo-handling gear register and produce a 12-item pre-use checklist for derricks, cranes, and lifting slings.

  • Calculate cargo ventilation requirements and dew-point margins for a hygroscopic cargo, stating when ventilation must stop.

  • Draft a toolbox talk on safe entry into a cargo hold, including atmosphere testing and rescue arrangements.

  • Compare the requirements for cargo securing manuals with practical lashing calculations for a heavy lift.

Your checkpoint

A cargo-safety package: one completed lashing calculation for a 40-tonne lift, one ventilation decision worksheet, and a 15-minute toolbox-talk outline with sign-off sheet.

Week 6

Maritime law, conventions and ship's business & Emergency response, fire prevention and safety of life at sea

  • Apply the collision regulations to six crossing, overtaking, and restricted-visibility scenarios and state the required action.

  • Outline the survey, certification, and reporting obligations for a vessel after a pollution incident.

  • Produce a fire-control plan for an engine-room fire, covering boundary cooling, isolation, fixed-system release, and re-entry.

  • Explain the legal and operational steps for responding to a person-overboard and a serious injury under the applicable conventions.

Your checkpoint

A law-and-emergency case file: six COLREG decisions with rule citations, one pollution-report timeline, and one fire-response decision tree, all checked against a 20-point rubric.

Week 7

Marine communications, GMDSS and ECDIS & Meteorology and oceanography

  • Distinguish GMDSS sea areas and select the correct distress and safety communication equipment for each.

  • Demonstrate the procedure for a DSC distress alert, follow-on voice distress, and cancellation, listing the exact message elements.

  • Interpret a synoptic chart: locate a frontal system, estimate its movement, and predict wind shift and sea state at a given position.

  • Explain how ECDIS route monitoring, alarms, and under-keel clearance settings interact during a heavy-weather passage.

Your checkpoint

A communications and weather workbook: one GMDSS equipment matrix for all four sea areas, one completed DSC distress script, and one 24-hour weather forecast with a synoptic-chart interpretation paragraph.

Week 8

Watchkeeping, ship manoeuvring and bridge resource management & Navigation (terrestrial, celestial, electronic and passage planning)

  • Plan and execute a simulated berthing manoeuvre, stating tug use, approach angle, and abort criteria for a stated wind and current.

  • Apply bridge resource management principles to a bridge-team scenario, assigning roles, challenge-and-response, and a shared mental model.

  • Complete a timed mixed review across all nine domains and classify every error by cause.

  • Build a personal 30-day maintenance schedule to retain weak areas after the plan ends.

Your checkpoint

A full-length 60-item mock exam completed under timed conditions with a score ≥75%, a corrected error log by domain, and a 30-day revision calendar.

Milestones

Week 2: Score ≥80% on a closed-book 20-item navigation set; all celestial and terrestrial calculations are reproducible without notes.

Week 4: Score ≥80% on the Domain 3 and 4 milestone exam; the error log shows no repeated calculation-error type.

Week 6: Achieve ≥18/20 on the law-and-emergency case-file rubric and ≥85% on a 20-item COLREG and emergency set.

Week 8: Score ≥75% overall on the timed 60-item mock exam, with no single domain below 60%.