Koeltechnicus Cat I study plan
Koeltechnicus Cat I · Give each week a clear focus.
8 weeks · About 7 hours per week
F-gas certification of refrigeration technicians (category I)
Map the F-gas regulation scope and explain which equipment categories and refrigerant charges fall under category I responsibilities.
Define global warming potential and CO2-equivalent, then convert at least five example charges into tonnes CO2e by hand.
List the legal obligations of a certified technician: leak checks, record keeping, labelling, and handling of recovered refrigerant.
Identify the penalties and enforcement consequences of non-compliance for both technician and operator.
Your checkpoint
A one-page reference sheet of key legal thresholds (charge sizes, CO2e limits, check intervals) plus five worked CO2e conversion examples with correct units.
F-gas certification of refrigeration technicians (category I)
Explain the environmental impact chain from refrigerant emission to ozone depletion and climate change.
Compare ODP and GWP values for the main refrigerant families and justify why a low-GWP choice is not automatically the safest choice.
Describe the containment hierarchy: prevention first, then detection, then recovery.
Summarise the F-gas phase-down schedule and what it means for service practice on existing equipment.
Your checkpoint
A comparison table of at least eight refrigerants with ODP, GWP, safety group, and typical application, plus a 150-word written justification of one refrigerant substitution decision.
F-gas certification of refrigeration technicians (category I)
Sequence the full recovery procedure for small self-contained units and for larger split systems.
Select recovery equipment and cylinders appropriate to the refrigerant, charge size, and system type.
Explain cylinder filling limits, non-return safeguards, and why cylinders must never be overfilled.
Describe safe handling, transport, and storage rules for recovered refrigerant containers.
Your checkpoint
A step-by-step recovery checklist covering pre-checks, equipment setup, recovery, cylinder weighing, and documentation, validated against at least three different system scenarios.
F-gas certification of refrigeration technicians (category I)
Perform leak detection using at least three methods and state the sensitivity and limits of each.
Apply the correct leak-check frequency for a given charge size and system type.
Describe leak repair obligations, deadlines, and what to record after a repair.
Explain the rules for reclaiming, recycling, and destroying recovered refrigerant.
Your checkpoint
A timed practice test on F-gas rules scored at 80 percent or higher, with every wrong answer rewritten as a corrected statement.
Refrigeration installation and maintenance practice
Trace the vapour-compression cycle and label pressure, temperature, and phase at each of the four main points.
Read a pressure-enthalpy diagram to locate superheat, subcooling, and the compression ratio for a given operating condition.
Identify the main system components and explain the function of each in the circuit.
Interpret common fault symptoms such as high superheat, low subcooling, and abnormal discharge temperature.
Your checkpoint
An annotated hand-drawn refrigeration circuit diagram with measured or given values at each point and a written diagnosis of two fault scenarios.
Refrigeration installation and maintenance practice
Perform commissioning steps: pressure testing, evacuation to target vacuum, and charging by weight.
Explain why evacuation must reach a defined vacuum level and how moisture and non-condensables damage a system.
Describe brazing and connection practices that keep the circuit clean and leak-tight.
Carry out a leak test on a newly assembled circuit and document the result.
Your checkpoint
A commissioning procedure document for one specific system type, including target vacuum, holding time, charge weight calculation, and a completed test record form.
Refrigeration installation and maintenance practice
Diagnose electrical and control faults using a systematic measurement sequence.
Explain the role of safety devices such as high-pressure switches, low-pressure switches, and thermal protection.
Describe maintenance tasks for compressors, condensers, evaporators, and expansion devices and their inspection intervals.
Plan a preventive maintenance visit with a prioritised task list and required tools.
Your checkpoint
A preventive maintenance checklist for one plant type with at least 15 verifiable tasks, each with an acceptance criterion and a tool required.
F-gas certification of refrigeration technicians (category I) & Refrigeration installation and maintenance practice
Integrate legal requirements with practical service steps so that every job ends with correct records and labelling.
Solve mixed scenario questions combining leak-check intervals, CO2e conversion, and fault diagnosis.
Review all previously missed questions and restate the underlying rule or principle for each.
Rehearse the full workflow from job receipt to refrigerant recovery and documentation.
Your checkpoint
A full-length mock exam completed under time pressure, scored, with a personal error log listing each weak area and the corrective action.
Milestones
Week 2: Can explain GWP, CO2e conversion, and the phase-down without notes, and correctly convert five random charge sizes.
Week 4: Scores 80 percent or higher on an F-gas-only practice test and can state every leak-check interval from memory.
Week 6: Produces a complete commissioning procedure from memory and correctly diagnoses two seeded system faults.
Week 8: Passes a timed mixed mock exam at 75 percent or higher with no repeated error from the personal error log.