BICSI DCDC study materials
BICSI DCDC study resources

BICSI DCDC flashcards

BICSI DCDC · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Concurrently maintainable
A Tier III attribute meaning any planned maintenance on power or cooling components can be performed without shutting down the IT load.
Fault tolerant
A Tier IV attribute meaning the facility can sustain an unplanned failure of any single component without affecting the IT load.
2N redundancy
A configuration with two complete independent power or cooling systems, each sized to carry the full load alone.
Basis of design
A document recording design assumptions, applicable codes, load densities, redundancy targets, and growth plans for traceability.
Availability formula
Availability equals MTBF divided by the sum of MTBF and MTTR; higher MTBF and lower MTTR increase uptime.
Design development phase
The design stage after schematic design where systems are sized, layouts refined, and major equipment selections made before construction documents.
Floor loading
The structural load capacity of a data hall slab, typically 150-300 lb/ft2, which must be checked against rack and UPS weights.
Hot and cold aisles
An arrangement where racks face each other across cold aisles and back to back across hot aisles to separate supply from return air.
Raised floor height
The clearance between structural slab and finished floor, commonly 24-36 inches, housing cabling and supplying cooling air.
White space
The usable data hall floor area available for racks and supporting equipment, excluding electrical and mechanical rooms.
Security zoning
Layering access restrictions from building perimeter through data hall to individual cabinets, with each layer more restrictive.
Site selection factors
Power availability, fiber routes, natural hazard risk, fuel delivery, latency, and cost are weighed when choosing a data center location.
Double-conversion UPS
A UPS topology that rectifies utility power to DC, charges batteries, and inverts to clean AC, isolating the load from all disturbances.
Power usage effectiveness
PUE equals total facility power divided by IT equipment power; 1.0 is the theoretical minimum and lower values are better.
Battery autonomy
The runtime a UPS battery string provides at full load, typically sized in minutes to bridge until generators assume the load.
Generator fuel storage
On-site fuel capacity sized for a target runtime, commonly 24-72 hours, plus refueling contracts and fuel quality testing.
Single-corded equipment
IT devices with one power inlet that need rack-level ATS or dual-path PDU feeds to preserve power redundancy.
Critical power path
The chain from utility through switchgear, transformers, UPS, distribution units, and rack PDUs that delivers power to IT loads.
ASHRAE inlet envelope
Recommended IT inlet conditions of 18-27 C and dew point 5.5-15 C, with an allowable range extending to 15-32 C.
Ton of refrigeration
A cooling capacity unit equal to 12,000 Btu/h or about 3.517 kW, used to size chillers and CRAH units.
Airflow per kW
A planning rule of about 100-160 cfm of supply air per kW of IT load, verified against rack airflow and containment design.
Hot aisle containment
Enclosing the hot aisle so heated exhaust returns directly to the cooling units, preventing mixing with cold supply air.
Economizer cooling
Using outside air or a water-side heat exchanger to cool the facility when outdoor conditions are below the design threshold.
Dew point control
Managing moisture by dew point rather than relative humidity alone, preventing both electrostatic discharge and condensation.
TIA-942
The standard defining data center cabling topology, area types, and redundancy levels for telecommunications infrastructure.
Main distribution area
The centralized cross-connect space housing core routers, switches, and backbone terminations for the data center.
Cat 6A distance
Category 6A copper cabling supports 10GBASE-T to 100 meters and reduces alien crosstalk compared with Cat 6.
MPO parallel optics
A multi-fiber connector used for 40G and 100G multimode links, carrying multiple parallel lanes over one connector.
Cable separation from power
Maintaining physical distance, typically about 12 inches for unshielded cable, between communications cabling and power conductors.
Level 5 integrated systems test
A commissioning test that verifies the complete facility response to failures such as utility loss, UPS transfer, and generator start.
Change management
A controlled process requiring a documented request, risk review, approval, scheduled window, and rollback plan before changes.
Infrared electrical scan
A preventive maintenance inspection using thermal imaging to find loose connections and overloaded circuits before failure.