BICSI DCDC study materials
BICSI DCDC study resources

BICSI DCDC study plan

BICSI DCDC · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Data Center Design and Project Requirements & Data Center Site and Space Planning

  • Map every design-input category (availability, capacity, growth, redundancy, budget) to the decisions it drives downstream

  • Compare the four Uptime Institute tier topologies and state the redundancy each requires at power, cooling, and cabling paths

  • Convert a sample client brief into a written requirements baseline with measurable acceptance criteria

  • Sketch a conceptual floor plan that separates white space, support space, and circulation while respecting egress clearances

Your checkpoint

A two-page requirements baseline document plus a labeled conceptual floor plan for a hypothetical 500 kW data hall

Week 2

Data Center Site and Space Planning & Data Center Power and Electrical Systems

  • Evaluate candidate sites against flood, seismic, utility-feed, and fiber-route risk criteria

  • Size a white-space footprint from rack counts, aisle widths, and hot/cold aisle geometry

  • Trace power from utility service through transformers, switchgear, UPS, PDU, and rack PDU

  • Distinguish the roles of the UPS, the static transfer switch, and the generator in ride-through and long-outage scenarios

Your checkpoint

A site-selection scoring matrix comparing three candidate locations across at least eight weighted criteria

Week 3

Data Center Power and Electrical Systems

  • Compute load in kW and kVA and convert between them using power factor

  • Calculate UPS runtime and generator sizing for a stated load profile with N+1 redundancy

  • Explain grounding, bonding, and separately derived system requirements for a data hall

  • Identify the failure modes and single points of failure in a 2N versus N+1 distribution topology

Your checkpoint

A one-line electrical diagram with a load schedule showing N+1 sizing calculations and identified single points of failure

Week 4

Data Center Cooling and Mechanical Systems

  • Convert rack heat load into required airflow using the sensible heat equation

  • Compare air-cooled, in-row, rear-door, and liquid-cooling approaches by density range and efficiency

  • Explain economizer modes, psychrometric limits, and the ASHRAE recommended versus allowable envelopes

  • Diagnose common airflow faults such as bypass, recirculation, and hot spots using containment and CFD concepts

Your checkpoint

A cooling design brief for a 12 kW per-rack hall with calculated airflow, selected cooling architecture, and a containment strategy

Week 5

Data Center Cabling and Telecommunications Infrastructure

  • Select fiber types and connector polish styles against distance, bandwidth, and application requirements

  • Apply structured cabling hierarchy from entrance room through MDA, HDA, and EDA to the rack

  • Specify copper categories and bundling practices that control alien crosstalk at higher speeds

  • Plan pathways and spaces that keep power and data separation and preserve bend-radius limits

Your checkpoint

A cabling topology diagram with a media selection table justifying each link by speed, distance, and redundancy

Week 6

Data Center Operations, Security, and Commissioning & Data Center Cabling and Telecommunications Infrastructure

  • Sequence the five commissioning levels from factory to integrated systems testing

  • Draft acceptance test criteria for power, cooling, and cabling subsystems

  • Outline physical security layers, access control, and visitor management for a data hall

  • Build a preventive maintenance calendar covering UPS batteries, generators, filters, and IR scans

Your checkpoint

A commissioning script with pass/fail criteria for one power train and one cooling loop, plus an annual maintenance calendar

Week 7

Data Center Design and Project Requirements & Data Center Power and Electrical Systems & Data Center Cooling and Mechanical Systems

  • Integrate design, power, and cooling knowledge by reworking the week 1 baseline for higher density and redundancy

  • Recompute power and cooling capacity after the density increase and document the trade-offs

  • Identify which domain concepts remain weakest and target them with focused review

Your checkpoint

A revised integrated design package with updated load, cooling, and redundancy calculations and a written trade-off analysis

Week 8

Data Center Site and Space Planning & Data Center Cabling and Telecommunications Infrastructure & Data Center Operations, Security, and Commissioning

  • Complete two full-length timed practice exams and log every miss by domain

  • Review missed items in site planning, cabling, and operations until each can be explained from first principles

  • Recite the key formulas, standards references, and tier definitions from memory

  • Confirm exam-day logistics, reference materials, and time-per-question pacing

Your checkpoint

A scored practice-exam log with a remediation note for every missed question and a one-page formula and standards cheat sheet

Milestones

Week 2: Can explain tier topology differences and justify a site choice without notes

Week 4: Scores at least 70 percent on a self-made 30-question quiz covering power and cooling calculations

Week 6: Can describe the full commissioning sequence and name acceptance tests for each subsystem from memory

Week 8: Scores 80 percent or higher on two timed practice exams with no domain below 70 percent