BICSI Installer 2 Copper study materials
BICSI Installer 2 Copper study resources

Pulling 24 Cat 6A Runs on a Friday Deadline

BICSI Installer 2 Copper · Put your knowledge to work in context.

All case studies

Pulling 24 Cat 6A Runs on a Friday Deadline

You are pulling 24 Cat 6A runs, 85 m each, from an IDF to a lab. The proposed route is 30 m of existing 1 in (27 mm) EMT containing two 90° bends and one junction box, then 25 m of exposed ceiling on J-hooks, then a 15 m riser sleeve. The lead technician proposes to pull all 24 cables at once with a powered cable puller and a steel fish tape, and to use a liquid soap lubricant to speed things up. The crew has one 1000 ft (305 m) reel of Cat 6A weighing 30 kg and one 8 ft fiberglass step ladder to reach the ceiling. The job must be finished by Friday.

1. Is the 1 in EMT usable for 24 Cat 6A cables? Show the numbers and state your alternative.

Read the worked answer

1 in EMT fill check:

  • Internal diameter 1.049 in = 26.6 mm → area = π × (13.3)² ≈ 557 mm²
  • 40% fill allowance ≈ 223 mm²
  • Cat 6A at 7.6 mm OD ≈ 45 mm² per cable
  • 223 ÷ 45 = 4.9 → 4 cables maximum

24 cables would need ≈ 1,090 mm², roughly five times the permitted fill. The conduit is not merely tight - it is impossible, and the two 90° bends plus a junction box make any forced pull a jacket-destroying exercise.

Alternatives, in order of preference:

  1. 3 in EMT - area ≈ 4,766 mm², 40% ≈ 1,906 mm², comfortably takes all 24 cables (24 × 45 = 1,080 mm², about 23%).
  2. Two 2 in EMT runs - each 2,164 mm², 40% ≈ 866 mm² → about 19 cables each; split 12/12.
  3. Cable tray or basket for the 30 m leg if the route allows.

Note: the existing 1 in conduit may already contain other cables; deduct their area before deciding whether it can be reused at all. And if you cannot re-route the 30 m leg, no amount of lubricant fixes a fill violation - escalate the pathway change to the GC/owner on day one, not Friday.

2. Regardless of the pathway outcome, set the pulling rules for this job: tension, bend radius, lubricant, and pulling method.

Read the worked answer

Tension

  • Maximum pulling tension for 4-pair balanced twisted-pair cable is about 110 N (25 lbf) per cable. Twenty-four cables at once is a theoretical 2.6 kN ceiling - a powered puller without tension feedback will exceed that silently and stretch the conductors, which shows up later as return loss and delay skew failures, not as an immediate break.
  • Use a breakaway swivel or a tension meter set to the calculated limit, or pull in small groups by hand.

Bend radius

  • During the pull: not less than 8 × cable OD (≈ 60 mm for 7.6 mm Cat 6A), and never a hard kink.
  • Installed, static: not less than 4 × cable OD (≈ 30 mm), or the manufacturer's larger stated minimum.
  • The junction box must be fitted with a bushing and the cable must not be dragged over the box edge or over a raw EMT lip.

Lubricant

  • Use a water-based lubricant listed as compatible with the cable jacket. Do not use liquid dish soap (residue attracts moisture and degrades jackets) and never petroleum-based grease.

Pulling method

  • Do not use a steel fish tape as the pull line for a multi-cable pull - it whips, cuts jackets at bends, and gives no tension feedback. Use mule tape or a proper pulling rope.
  • Pay off from a reel stand/dolly; do not coil off the side of the reel or drag the reel across the floor. Do not pull from a coil over the shoulder.
  • Leave the required slack (typically 3 m at the TR, ~0.3 m at the outlet) and dress with hook-and-loop, not cinched ties.

3. List the safety issues in this plan and what you would change.

Read the worked answer
  1. Ladder work. An 8 ft step ladder is a poor choice for repeated ceiling pulls and is not a working platform for a two-handed pull. Use a scissor lift or a rolling tower for the 25 m ceiling section. If a ladder is used for short access, set it at roughly a 4:1 base-to-height ratio on a clear, level surface, maintain three points of contact, and do not use the top two rungs.
  2. Rope under tension. Never stand in the bight or in line with a rope or tape that is being pulled - stored energy releases violently if it slips or breaks. Keep the crew out of the pull line and post a spotter at the far end.
  3. Manual handling. A 305 m Cat 6A reel at 30 kg is a two-person lift or a mechanical lift; dragging it is both a back injury and a cable-damage risk.
  4. Overhead hazards. Hard hat and eye protection (jacket slivers and fish tape ends), and a spotter when working above an occupied floor. Barricade the drop zone.
  5. Powered puller. Only a trained operator; cord/GFCI protection and a lockout point; nobody holds the cable by hand at the puller head.
  6. Schedule pressure. "Finished by Friday" is what produces cut jackets and over-tensioned pulls. If the pathway change is needed, the realistic conversation with the GC happens now, not on Thursday night.